Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹16.3 CrAdmitted-Finance 15A 17 KRYSTAL HOUSE DUNCAN CAUSEWAY ROAD SION MUMBAI MAHARASHTRA 400022 | MUMBAI | MAHARASHTRA | 400022 | ₹16.3 Cr | H1 | Admitted-Finance |
| 2 | H2₹15.3 CrAdmitted-Finance BENI BARI ANUPPUR DISTRICT ANUPPUR MADHYA PRADESH 484881 | SHAHDOL | MADHYA PRADESH | 484881 | ₹15.3 Cr | H2 | Admitted-Finance |
| 3 | H3₹14.5 CrAdmitted-Finance | ₹14.5 Cr | H3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | NAGENDRA KUMAR PANDEY H3 | HINDUSTAN TRADING AND CONSTRUCTION CO. H2 | krystal integrated services ltd H1 |
|---|---|---|---|---|---|---|
| 1.01 | 1 Design and build sewage treatment plant of installed capacity 3.40 MLD and all appurtenant structures and allied works;
2 Construction of Pumping Station along with Rcc sump well providing and installing pumps and pumping main comprising of DIK7 class pipe of 400-mm diameter having length of 100 m respectively from sump well to STP
3 Construction of 1 Nos Interception Diversion Structure.
4 Construction of 1700 m Length of RCC drain.
5 Providing and laying of HT Feeder having the length of 5.00 kms. and Electrical 1 Nos. Substations.
6 Reuse of the Treated Sewer water for the Green space comprising of Dik7 pipe of 100mm diameter having the length of 35 meters, Construction of 100 Kl Sump & 50 nos of Tree Plantation
7 Providing, installing, testing, and commissioning of 1 Nos of Online Continuous Monitoring System (OCMS). | 1 | Lump-Sum | 7,00,00,000 ₹7,00,00,000 | 7,23,00,000 ₹7,23,00,000 | 9,35,95,000 ₹9,35,95,000 |
| 1.02 | Operation and Maintenance Cost next 10 Years | 1 | Lump-Sum | - | - | - |
| 1.03 | 1st Year | 1 | Lump-Sum | 21,90,000 ₹21,90,000 | 18,17,029 ₹18,17,029 | 21,10,000 ₹21,10,000 |
| 1.04 | 2nd Year | 1 | Lump-Sum | 25,33,200 ₹25,33,200 | 19,26,099 ₹19,26,099 | 22,08,100 ₹22,08,100 |
| 1.05 | 3rd Year | 1 | Lump-Sum | 26,27,696 ₹26,27,696 | 20,42,013 ₹20,42,013 | 23,10,883 ₹23,10,883 |
| 1.06 | 4th Year | 1 | Lump-Sum | 28,04,081 ₹28,04,081 | 21,64,064 ₹21,64,064 | 24,18,576 ₹24,18,576 |
| 1.07 | 5th Year | 1 | Lump-Sum | 29,52,203 ₹29,52,203 | 22,94,467 ₹22,94,467 | 25,31,419 ₹25,31,419 |
| 1.08 | 6th Year | 1 | Lump-Sum | 31,94,813 ₹31,94,813 | 24,32,165 ₹24,32,165 | 26,49,661 ₹26,49,661 |
| 1.09 | 7th Year | 1 | Lump-Sum | 32,84,813 ₹32,84,813 | 25,78,025 ₹25,78,025 | 27,73,566 ₹27,73,566 |
| 1.10 | 8th Year | 1 | Lump-Sum | 34,59,989 ₹34,59,989 | 27,33,000 ₹27,33,000 | 29,03,408 ₹29,03,408 |
Tender Value
₹8.0 Cr
EMD Value
₹4.0 L
Closing Date
6 Mar 2026, 5:30 pmClosed
CMO NAGAR PALIKA KOTMA
NEAR CHC WARD 04 KOTMA
Interception AND Diversion of Nallahs with STP works Project of Kotma town under SBM 2
2026_UAD_479297_1
384
Open Tender
Civil Works - Others
365 days
Nagar Palika Kotma
Please refer Tender documents.
6 documents required · 6 mandatory
₹20,000
₹4.0 L
31 Mar 2026
30 Jan 2026
9 Mar 2026
30 Jan 2026
6 Mar 2026
30 Jan 2026
1 Design and build sewage treatment plant of installed capacity 3.40 MLD and all appurtenant structures and allied works; 2 Construction of Pumping Station along with Rcc sump well providing and installing pumps and pumping main comprising of DIK7 class pipe of 400-mm diameter having length of 100 m respectively from sump well to STP 3 Construction of 1 Nos Interception Diversion Structure. 4 Construction of 1700 m Length of RCC drain. 5 Providing and laying of HT Feeder having the length of 5.00 kms. and Electrical 1 Nos. Substations. 6 Reuse of the Treated Sewer water for the Green space comprising of Dik7 pipe of 100mm diameter having the length of 35 meters, Construction of 100 Kl Sump & 50 nos of Tree Plantation 7 Providing, installing, testing, and commissioning of 1 Nos of Online Continuous Monitoring System (OCMS).
Operation and Maintenance Cost next 10 Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B)
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
Power Consuption @ 6.5 Rs per unit
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) ©
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
NIT384.pdf
Tender Documents • 1.84 MB
ANNEXUREE.pdf
Additional Documents • 2.63 MB
BOQ_563307.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid