Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Not Admitted-Finance | Not Admitted-Finance Not qualified for AOC |
Tender Value
₹5.9 L
EMD Value
₹5,870
Closing Date
17 Feb 2020, 2:00 pmClosed
Executive Engineer Hydraulic Division Kishtwar
Executive Engineer Hydraulic Division Kishtwar
Please refer BOQ
2020_PHE_92475_2
e-NIT No. 41 of 2019-20 Dated 10-02-2020
Open Tender
Civil Works
Item Rate
30 days
Kishtwar
Please refer NIT
3 documents required · 3 mandatory
₹600
Yes
Executive Engineer Hydraulic Division Kishtwar
₹5,870
Yes
13 Jun 2020
11 Feb 2020
17 Feb 2020
11 Feb 2020
17 Feb 2020
11 Feb 2020
Amount
Labour required for cutting of concrete and road pavement for crossing the pipe line.
Carriage of pipes from Divisional store to road side of work by mechanical transport for an av. Distance of 03 km including loading unloading and stacking.
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc.(not exceeding 1.5 mtr in width ) and for shafts , wells, cesspits, and the like not exceeding 10 sqm on plan , depth up to 1.5mtr including disposal of excavated earth up to 1 mtr from cutting edge , disposed earth is to be leveled and neatly dressed. 100% all kinds of soil.
Laying and fitting of G.I. pipes complete excluding cost of pipes and earth work 80 mm dia
65 mm dia
50 mm dia
40 mm dia
32 mm dia
25 mm dia
20 mm dia
Providing and laying in position cement concrete of specified grade, excluding the cost of centering, shuttering. All work up to plinth level.) 1:2:4(1cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size. Crushed
Carriage of cement by mechanical transport including loading, un loading and stacking for an average distance of 03 Km.
Carriage of sand from source to site of work by mechanical transport including loading, unloading and stacking for an average distance of 32 km .
Carriage of stone aggregate from source to site of work by mechanical transport including loading, unloading and stacking for an average distance of 06 km .
Re-filling of available excavated earth in trenches.
FARIDIA CONSTRUCTION
Parihar Group of Construction
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .