Tender Value
₹40.7 L
EMD Value
₹50,000
Closing Date
24 Jun 2026, 5:00 pmClosed
Executive Engineer Works Department ZP Ratnagiri
Executive Engineer Works Department ZP Ratnagiri Dr.Babasaheb Ambedkar Bhavan Ground Floor Executive Engineer Works Department Ratnagiri ZP Ratnagiri
Construction of RCC Sakav on Jamco Company to Undi Road at Ril. Tal. Dist.Ratnagiri.
2026_RATNA_1307480_1
RZP/WD-Ratnagiri/E-Ten OPEN-05/2026-27
Open Tender
Civil Works - Bridges
Percentage
180 days
Ratnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹50,000
10 Jun 2026
10 Jun 2026
29 Jun 2026
10 Jun 2026
24 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item No.1:- Earth work in excavation in ordinary soil for foundation of structures as per drawing and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. | 109.74 | Cubic metre | 239 | ₹26,227.86 |
| 2 | Item No.2:- Earth work in excavation in hard rock manual means requiring blasting for foundation of structures as per drawing and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material | 5.78 | Cubic metre | 1,232 | ₹7,120.96 |
| 3 | Item No.3:- Dewatering for other soil in abutment, returns, piers including diversion of stream providing cofferdam, bunds etc. as may be necessary for foundation and other parts of work and bailing out and pumping out water below the actual initial natural water level for start of that particular component till completion of bridge etc. Complete | 1 | Hour | - | - |
| 4 | A) For Abutments | 48 | Hour | 201 | ₹9,648 |
| 5 | Item No.4- Providing and fixing 25mm diameter steel anchor dowel in hard rock including drilling hole of 32 mm
diameter up to 0.75 mtrs depth, placing the dowel in position and effectively grouting the hole with CM 1:1
proportion etc. complete | 4 | Number | 1,674 | ₹6,696 |
| 6 | Item No.5 :- Providing and laying in situ cement concrete M - 15 of trap metal in foundation including necessary bailing out water, compacting and curing (including plywood / steel formwork centering excluding dewatering by pump ) | 17.85 | Cubic metre | 7,245.64 | ₹1,29,334.67 |
| 7 | Item No. 6 :- Providing & laying in situ cement concrete M - 15 of trap metal for cast in situ piers, abutments, returns, wings etc. including provision of "V" shaped false joints to form suitable panels on the faces to approve design with compacting by vibrating, form work, centering. ( excluding dewatering by means of pump) and including bailing out water and curing etc. complete. ( Upto 3 m height ) as water and curing etc. complete ( Note : add 5% for over 3.00 m. height increase upto 9.00 height and 20 % for every 3.00 m height increase in lift above 9.00 m height, above ground level for that particular structure ) | 246.84 | Cubic metre | 8,691.64 | ₹21,45,444.42 |
| 8 | Item No.7:- Providing and laying in situ controlled cement concrete of M - 25 of trap metal for reinforced cement concrete caps over piers and abutments including necessary scaffolding, plywood / steel form work compacting by vibrating, finishing and curing etc. complete (excluding reinforcement ) | 5.27 | Cubic metre | 9,968.01 | ₹52,531.41 |
| 9 | Item No.8:- Providing and laying in situ M - 25 cement concrete of trap metal for R.C.C.work including ramming, vibrating, finishing and curing complete for solid slab etc. including plywood / steel formwork centering and finishing in cement plaster ( Excluding H.Y.S.D. reinforcement ) Height upto 3.00 mts. | 37.6 | Cubic metre | 12,201.01 | ₹4,58,757.98 |
| 10 | Item No. 9:- Providing and laying in situ of trap metal Cement Concrete M-25 for R.C.C work of ballast walls, kerbs, box returns etc including scaffolding, centering plywood/steel formwork, compaction, finishing in CM 1:3 and curing completed | 2.58 | Cubic metre | 10,922 | ₹28,178.76 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.91 MB
B1undi.pdf
Tender Documents • 2.05 MB
BOQ_2243691.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .