Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NEW MADHOPUR COLONY SURAJKUND GORAKHPUR UTTAR PRADESH 273001 | GORAKHPUR | UTTAR PRADESH | 273001 | Admitted-Finance |
| 2 | Admitted-Finance 180 A VIKAS NAGAR KANPUR | KANPUR | KANPUR | UTTAR PRADESH | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical Technical bid Not Qualified |
Tender Value
Refer Docs
EMD Value
₹96,000
Closing Date
12 Apr 2024, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EWC Gorakhpur
Srirampuram Colony Mohaddipur Gorakhpur
Increasing Capacity and strengthening work Under EDC-II Gkp
2024_PVVNV_920959_1
48/EWC(G)/2023-24
Open Tender
Electrical Works
Item Wise
30 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE EWC Gorakhpur
₹96,000
Yes
24 May 2024
1 Apr 2024
15 Apr 2024
1 Apr 2024
12 Apr 2024
1 Apr 2024
Amount
WORK No. 01- Part A (Materials Provided by contractor)
33 KV Top channel for cable stand & neutral earthing
PG clamp for Dog
Battery charger with 24-volt Battery and Cabinet (as per Instruction of Supervision Authority)
11 KV C/J Kit 3X300 mm² XLPE Indoor
11 KV C/J Kit 3X300 mm² XLPE Outdoor
Armoured copper control cable 2 x 2.5 mm2
Armoured copper control cable 4 x 2.5 mm2
PART- B WORK Shifting & loading of following materials on private truck at store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Gajpur, Distt- Gorakhpur & Un-loading of the same with proper stacking (Distance about 0 to 60 km)
ACSR Dog conductor
33 KV Control panel for Double Transformer
33 KV VCB, 750MVA
33 KV Line Isolator
33 KV Bus Type Isolator
33KV C.T.400/200/1A
33 KV PT with Structure
33 KV LA (03 No)
11 KV ‘XLPE’ cable 3x300 mm²
2.6 m angle for Structure
Repairing of plinth and foundation for 10 MVA transformer as per required specification. Dismantling of T/F all connection, Rail pieces and T/F shifting to another place by crane and 1.5 mtr increasing height of T/F plinth over the ground level.
Transformer body earthing at two places including cost of G.I. strip, G.I. pipe and other earthing materials required. (delta type)
Laying of 11 KV “XLPE” cable 3 x 300 mm2 including digging of pits of size 0.5 x 0.5 mtr. covering of cable with sand and 1st class bricks around and top of the cable.
Mounting, Installation, wiring and complete connection of 33 KV C.T with earthing
installation of LA, Earthing and complete work
Erection & grouting of PT Structureand installation of PT, Earthing and complete work
Neutral earthing of 10 MVA transformer complete including cost of G.I. strip, G.I. pipe 1.5” dia 30’ long and other earthing materials. (delta type)
Dismentling of Busbar with jumper and all fitting and stringing of ACSR Dog conductor complete work.
Grouting of M.S. Channel 3.2 mtr. long for neutral earthing support of 10 MVA transformer with help of G.I. strip 50 x 6 mm and copper flexible bond etc.
Jointing charges of 11 KV “XLPE” C/J kit 3 x 300 mm2 indoor/outdoor.
Dismantling of existing pale fencing and resetting after completion of trnasformer work.
Installation of 33 KV control panel, wiring with complete earthing and respectively installation of battery and battery charger in control room and making connection.
Mounting, Installation, wiring and complete connection of 33 KV VCB with earthing
Laying from switchyard to control room for 33 KV panel, CT and 10 MVA T/F by digging trench in switchyard including cost of sand and 1st class bricks with covering and making connection complete.
Painting of newly erected structure in switchyard (Applying on coat of good quality red oxide primer then two coats of good quality of high class luxol aluminium paint)
WORK No. 02- Part A (Materials Provided by contractor)
33 KV ‘XLPE’ C/J Kit 3x300mm² Outdoor
33 KV ‘XLPE’ C/J Kit 3x300mm² Straight Through
Armoured copper control cable 2 x 2.5 mm2
Armoured copper control cable 4 x 2.5 mm2
PART- B WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to different 33/11 KV Sub Station under EDC-2 Gorakhpur Distt-Gorakhpur & Un-loading of the same with proper stacking
33 KV Line Isolator
Line Isolator stucture
33 KV Control panel for Double Transformer
33 KV VCB, 750MVA
33 KV LA Structure
2.6 m angle for LA Structure
33KV C.T.400/200/1A
33 KV Fuse set with Structure
33 KV ‘XLPE’ Cable 3x300mm²
ACSR Dog conductor
Shift the existing 5/10 MVA Power T/F, Dismentaling of existing T/F plinth and Construction of power transformer plinth for 5/10 MVA transformer of size 3.5 x 3.5 x 1.5 mtr. including cost of all material at 33/11 KV S/S Basgaon.
Erection of 01 No Fuse set structure, Installation of fuse set, jumpering and earthing complete.
Mounting, Installation, wiring and complete connection of 33 KV C.T with earthing
Erection & grouting of 01 Set LA Structure and installation of LA, Earthing and complete work
Erection & grouting of 01 Set LSI Structure, installation of Line Isolator, Earthing and complete work
Laying of 33 KV 3x300 mm² ‘XLPE’ cable(D/C) by digging pit & making trench in Proper size (1.2M depth x1.2M wide) below ground level by fixing bricks(4½˝) on both side of trench wall and 9˝ brick work at the centre of the trench along the cable. Fixing brick slab on top after filling sand around both the cable including cost of bricks and sand/ as per site requirement HDD mathod can be used.
Jointing charge of 33 KV ‘XLPE’ C/J Kit 3x300 mm² Outdoor/Straight Through
Disconnection of wiring of VCB, repair and reconnection & wiring of 33 KV VCB with complete work.
Disconnection of wiring of T/F control pannel, repair and reconnection & wiring of 33 KV T/F control pannel with complete work.
Disconnection and reconnection of jumper and all fitting and complete work for Installation of all related electrical equipment.
Dismantling of existing pale fencing and resetting after completion of all related work.
Installation of 33 KV control panel, wiring with complete earthing and respectively
Mounting, Installation, wiring and complete connection of 33 KV VCB with earthing
Earthing of 10/5 MVA power transformer body earthing at two places including cost of G.I. strip, G.I. pipe and other earthing materials required.
Neutral earthing of 10/5 MVA transformer complete including cost of G.I. strip, G.I. pipe 1.5” dia 20’ long and other earthing materials.
Laying from switchyard to control room for 33 KV panel, CT and T/F by digging trench in switchyard including cost of sand and 1st class bricks with covering and making connection complete.
Painting of erected structure in switchyard.
ARK ENGINEERING
M/S OM SAI TRADERS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .