| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 CrAdmitted-Finance | ₹4.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.4 Cr+₹13.8 L (3.23%)Admitted-Finance | ₹4.4 Cr+₹13.8 L (3.23%) | L2 | Admitted-Finance |
| 3 | L3₹4.5 Cr+₹22.0 L (5.15%)Admitted-Finance | ₹4.5 Cr+₹22.0 L (5.15%) | L3 | Admitted-Finance |
| 4 | L4₹4.5 Cr+₹22.3 L (5.23%)Admitted-Finance MADHUBAN PO PARADIP DIST JAGATSINGHPUR 754 142 ODISHA | JAGATSINGHAPUR | ODISHA | 754142 | ₹4.5 Cr+₹22.3 L (5.23%) | L4 | Admitted-Finance |
| 5 | L5₹4.6 Cr+₹33.5 L (7.85%)Admitted-Finance 806 8TH FLOOR MULUND WEST NEPTUNE UPTOWN N S ROAD VILLAGE TOWN MULUND CITY MUMBAI MUMBAI MAHARASHTRA 400080 INDIA | MUMBAI SUBURBAN | MAHARASHTRA | 400080 | ₹4.6 Cr+₹33.5 L (7.85%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Encee Rail Engineers and Fabricators Pvt Ltd L5 | PADMABATI INFRAPROJECTS PVT. LTD. L9 | Ms Gangadhar Jena L6 | NNS CONSTRUCTIONS AND ENGINEERING PRIVATE LIMITED L7 | M/S.Parikshita Chuli and Sons L3 | M/S BHAIRAB CHARAN SWAIN L1 | Bidyadhar Swain L8 | M/S TRIBHUBAN DAS L4 | CHITTA RANJAN SWAIN L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling and removing RCC columns, beams ,slab,staircase landing,lintels with supply of all labour T&P machineries ,staging,scafolding and removing the debrises with all leads and lifts Including transportation if necessary, and disposing the debrises at specified location cleaning the site properly with all taxex tollage ,royalties etc all complete as per direction of engineer incharge but excluding GST. | 36.73 | Each Cum | 1,500 ₹55,095 | 1,500 ₹55,095 | 850 ₹31,220.5 | 1,000 ₹36,730 | 500 ₹18,365 | 350 ₹12,855.5 Lowest | 1,000 ₹36,730 | 900 ₹33,057 | 1,000 ₹36,730 |
| 2.00 | Earth work in all kind of soil with initial lead and lift including rough dressing to the bottom of the trench and disposing the excavated material at specified location by haed load or transport vehicles if necessary. with supply of all labour, transportation , T&P, taxes,tollage, royalites , port entry fees,ets all complete as per direction of engineer incharge but excluding cost of . GST. | 7,287 | Each Cum | 90 ₹6,55,830 | 120 ₹8,74,440 | 180 ₹13,11,660 | 120 ₹8,74,440 | 85 ₹6,19,395 | 39 ₹2,84,193 Lowest | 250 ₹18,21,750 | 95 ₹6,92,265 | 100 ₹7,28,700 |
| 3.00 | Cement concrete of M-30 grade (using Crusher broken hard granite chips of 12 mm to 20 mm size of approved quality for R.C.C work), mixing in a Batching Plant, transporting the concrete by any approved means excluding form works, made out of ply /steel shutters, hoisting, laying in proper level, vibrating, finishing to the exposed surface properly, curing, barricading the area etc with supply of all materials, labour, T&P, all taxes, Port entry fees, royalties, tollage, all transportation charges, all testing, cost for design mix, engagement, hire & running charges of all machineries, etc all completeas directd by EIC but excluding cost of binding wires, cost of steel, labour charges of bending and binding of steel, centering and shuttering charges and excluding GST. | 2,328 | Each Cum | 5,000 ₹1,16,40,000 Lowest | 6,500 ₹1,51,32,000 | 5,700 ₹1,32,69,600 | 6,500 ₹1,51,32,000 | 6,000 ₹1,39,68,000 | 5,988 ₹1,39,40,064 | 6,950 ₹1,61,79,600 | 5,900 ₹1,37,35,200 | 5,400 ₹1,25,71,200 |
| 4.00 | P.C.C(1:3:6) of using 20 mm. & down Crusher broken granite chips of approved quality in foundation & plinth including mixing hosting, transporting,laying to proper level & slope, consolidating, curing, watering charges etc. all complete including supply of all materials labour, T&P, taxes, tollage,royalties etc all complete as directed by EIC but excluding GST and centering, shuttering charges. | 505 | Each Cum | 3,500 ₹17,67,500 | 5,800 ₹29,29,000 | 3,200 ₹16,16,000 | 4,989 ₹25,19,445 | 3,700 ₹18,68,500 | 3,600 ₹18,18,000 | 4,200 ₹21,21,000 | 4,575 ₹23,10,375 | 3,000 ₹15,15,000 Lowest |
| 5.00 | Supply Tor/TMT steel manufactured by SAIL/TISCON/VIGAC Steel of Fe-500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in proper position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour, materials, transportation charges, T&P, taxes, etc. all complete but excluding GST as per the direction of Engineer-in-charge but excluding GST. (NB: Payment shall be made as per the co-efficient laid down in IS-1786. No wastages shall be paid.. | 2,328 | Each Qntl | 8,000 ₹1,86,24,000 | 8,000 ₹1,86,24,000 | 7,200 ₹1,67,61,600 | 6,500 ₹1,51,32,000 Lowest | 7,800 ₹1,81,58,400 | 6,700 ₹1,55,97,600 | 7,000 ₹1,62,96,000 | 7,000 ₹1,62,96,000 | 7,000 ₹1,62,96,000 |
| 6.00Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank of approved quality for R.C.C. structures and deshuttering and removing the same after due period with supply of all materials, labour, T&P, taxes, royalties, tollage, etc. all complete but excluding GST as directed by Engineer-in-charge | ||||||||||||
| 6.01 | Foundation & Plinth | 904.84 | Each sqm | 100 ₹90,484 | 350 ₹3,16,694 | 110 ₹99,532.4 | 180 ₹1,62,871.2 | 80 ₹72,387.2 Lowest | 185 ₹1,67,395.4 | 100 ₹90,484 | 170 ₹1,53,822.8 | 250 ₹2,26,210 |
| 6.02 | Wall and fins | 10,130.22 | Each sqm | 280 ₹28,36,461.6 | 350 ₹35,45,577 | 450 ₹45,58,599 | 310 ₹31,40,368.2 | 100 ₹10,13,022 Lowest | 185 ₹18,74,090.7 | 550 ₹55,71,621 | 218 ₹22,08,387.96 | 250 ₹25,32,555 |
| 6.03 | Roof Slab,chajja,drop | 566.82 | Each sqm | 320 ₹1,81,382.4 | 350 ₹1,98,387 | 350 ₹1,98,387 | 450 ₹2,55,069 | 100 ₹56,682 Lowest | 185 ₹1,04,861.7 | 550 ₹3,11,751 | 220 ₹1,24,700.4 | 250 ₹1,41,705 |
| 7.00 | Providing shoring & shuttering at foundation with form works made of steel shutters/ ply with required inclined supports for placing of the earth in required position and dismantling the same after completion of the toe wall including supply of all labour, materials, T&P, taxes, tollage, royalties, Port entry fees etc all complete excluding GST and as per direction of Engineer in charge. | 775.5 | Each sqm | 500 ₹3,87,750 | 400 ₹3,10,200 | 700 ₹5,42,850 | 300 ₹2,32,650 | 90 ₹69,795 Lowest | 150 ₹1,16,325 | 900 ₹6,97,950 | 189 ₹1,46,569.5 | 200 ₹1,55,100 |
Tender Value
₹5.7 Cr
EMD Value
₹11.4 L
Closing Date
28 Jul 2023, 5:15 pmClosed
J K MOHANTY,EE,HWD-III,PPA
J K MOHANTY,EE,HWD-III,PPA
Construction of approach road and drainage facility to new plot under development near outer bulb(BOT railway bulb located outside Gate no-1) from JSWPTPL tippler side
2023_MoS_761078_1
CE/HWD-III/ACCTS-02/23/327
Open Tender
Civil Works
Works
300 days
Paradip
Refer Tender Document and e-TCN
5 documents required · 5 mandatory
₹6,000
Yes
As per Tender Document and e-TCN
₹11.4 L
Yes
8 Sept 2023
10 Jul 2023
31 Jul 2023
10 Jul 2023
28 Jul 2023
10 Jul 2023
Amount
Dismantling and removing RCC columns, beams ,slab,staircase landing,lintels with supply of all labour T&P machineries ,staging,scafolding and removing the debrises with all leads and lifts Including transportation if necessary, and disposing the debrises at specified location cleaning the site properly with all taxex tollage ,royalties etc all complete as per direction of engineer incharge but excluding GST.
Earth work in all kind of soil with initial lead and lift including rough dressing to the bottom of the trench and disposing the excavated material at specified location by haed load or transport vehicles if necessary. with supply of all labour, transportation , T&P, taxes,tollage, royalites , port entry fees,ets all complete as per direction of engineer incharge but excluding cost of . GST.
Cement concrete of M-30 grade (using Crusher broken hard granite chips of 12 mm to 20 mm size of approved quality for R.C.C work), mixing in a Batching Plant, transporting the concrete by any approved means excluding form works, made out of ply /steel shutters, hoisting, laying in proper level, vibrating, finishing to the exposed surface properly, curing, barricading the area etc with supply of all materials, labour, T&P, all taxes, Port entry fees, royalties, tollage, all transportation charges, all testing, cost for design mix, engagement, hire & running charges of all machineries, etc all completeas directd by EIC but excluding cost of binding wires, cost of steel, labour charges of bending and binding of steel, centering and shuttering charges and excluding GST.
P.C.C(1:3:6) of using 20 mm. & down Crusher broken granite chips of approved quality in foundation & plinth including mixing hosting, transporting,laying to proper level & slope, consolidating, curing, watering charges etc. all complete including supply of all materials labour, T&P, taxes, tollage,royalties etc all complete as directed by EIC but excluding GST and centering, shuttering charges.
Supply Tor/TMT steel manufactured by SAIL/TISCON/VIGAC Steel of Fe-500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in proper position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour, materials, transportation charges, T&P, taxes, etc. all complete but excluding GST as per the direction of Engineer-in-charge but excluding GST. (NB: Payment shall be made as per the co-efficient laid down in IS-1786. No wastages shall be paid..
Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank of approved quality for R.C.C. structures and deshuttering and removing the same after due period with supply of all materials, labour, T&P, taxes, royalties, tollage, etc. all complete but excluding GST as directed by Engineer-in-charge
Foundation & Plinth
Wall and fins
Roof Slab,chajja,drop
Providing shoring & shuttering at foundation with form works made of steel shutters/ ply with required inclined supports for placing of the earth in required position and dismantling the same after completion of the toe wall including supply of all labour, materials, T&P, taxes, tollage, royalties, Port entry fees etc all complete excluding GST and as per direction of Engineer in charge.
Dewatering the stagnated seepage water from the excavated areas using 5 HP Diesel pump, discharging water to near by drains, basins and other approved points by sufficient length delivery pipe, including supply of all labour, T&P, all taxes, hire and running charges of pump, transportation of pumps from one location to other location, all POL, suction and delivery pipe, engagement of pump operator in all three shifts as and when required etc. complete excluding GST and as directed by Engineer in charge. NB : No idle hours shall be paid.
Filling with saline sand up to required level Including collecting, conveying by private trucks / dumpers with all lead and lifts, loading at one end and unloading at work site, spreading and laying in layers, watering, compacting by using VRR, dressing, leveling to required height, level and slope etc. with supply of all labour, materials, T&P, taxes, royalties, running & hire charges of VRR, trucks, dumpers, Port entry fees etc. complete excluding GST and as per direction of Engineer in charge. N.B:- 10% voids shall be deducted from the measured quantity of sand after compaction to arrive at the payable quantity.
Collecting, Conveying, Supplying and transportation of Quarry Dust of approved quality, conveying the same by private Trucks including loading, unloading, spreading quarry dust over the approved surface in suitable layers, compacting with VRR for both Dry & Wet rolling all complete including cost of all materials, labour, T&P, royalties, Taxes, hire & running charges of all equipments, Port entry fees, operator expenses cost of water, fuel, lubricants etc all complete excluding GST and as directed by the Engineer in charge.
Collecting, Conveying, Supplying & Spreading of IRC Grade-I metal of approved quality & filling the interstices with required Quarry Dust as per specification, laying the compacted Gr-I surface to required slope, compacting by VRR for both dry and wet rolling including supply of all materials, labour, T&P, transportation charges, hire & running charges of all equipments, water charges, royalties, Taxes, Port entry fees etc. all complete excluding GST and as directed by the Engineer in charge.
Collecting, Conveying, Supplying & Spreading of IRC Grade-II metal of approved quality & filling the interstices with required Quarry Dust as per specification, laying over the compacted Gr-I surface to required slope, compacting by VRR for both dry and wet rolling including supply of all materials, labour, T&P, transportation charges, hire & running charges of all equipments, water charges, royalties, Taxes, Port entry fees etc. all complete excluding GST and as directed by the Engineer in charge.
Collecting, Conveying, Supplying & Spreading of good laterite moorum of approved quality , laying over the compacted surface to required slope, compacting by VRR including supply of all materials, labour, T&P, transportation charges, hire & running charges of all equipments, royalties, Taxes, Port entry fees etc. all complete excluding GST and as directed by the Engineer in charge.
Engagement of fallowing machineries for back filling, cleaning of over burden earth shifting heavy concrete blocks,broken concrete structure,debrises and for clearing the area or for any other purpose including Port entry fees, hire & running charges, fuel, lubricants, T&P, all taxes, operation expenses etc. all complete excluding GST and as per direction of Engineer in charge. NB: No idle hours shall be paid.
EXCAVATOR OF 1 CUM BUCKET CAPACITY (JCB)
TRACTOR
Supply of labour for cleaning the site & other miscellaneous works at site including safety arrangements, port entry fees etc. all complete excluding GST and as directed by the Engineer-in-charge.
Un-Skilled Labourers(including gate pass)
CHITTA RANJAN SWAIN
M/S.Parikshita Chuli and Sons
M/S TRIBHUBAN DAS
Encee Rail Engineers and Fabricators Pvt Ltd
Ms Gangadhar Jena
NNS CONSTRUCTIONS AND ENGINEERING PRIVATE LIMITED
Bidyadhar Swain
PADMABATI INFRAPROJECTS PVT. LTD.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_800130.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .