Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.1 LAdmitted-Fee/PreQual/Technical/Finance | -31.92% | ₹8.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹8.3 L+₹21,612.64 (2.67%)Admitted-Fee/PreQual/Technical/Finance | -30.10% | ₹8.3 L+₹21,612.64 (2.67%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹8.6 L+₹54,506.61 (6.74%)Admitted-Fee/PreQual/Technical/Finance | -27.33% | ₹8.6 L+₹54,506.61 (6.74%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹9.0 L+₹94,169.38 (11.6%)Admitted-Fee/PreQual/Technical/Finance | -23.99% | ₹9.0 L+₹94,169.38 (11.6%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹9.7 L+₹1.6 L (20.0%)Admitted-Fee/PreQual/Technical/Finance | -18.33% | ₹9.7 L+₹1.6 L (20.0%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹11.9 L
EMD Value
₹23,760
Closing Date
21 Jul 2026, 6:00 pmClosed
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISION SMC REGAL LANE LAL CHOWK
Construction of cement concrete lane ph IInd from land of Mohd Sadeeq kuthoo up to shamshan ghat including Culvert at Taj colony Harwan. Ward 01
2026_HAUDD_315318_1
SHORT Term NOTICE INVITING ETENDER No. 10 of 2026-2027 Dated 09.07.2026 RRWD SMC
Open Tender
Civil Works
Percentage
90 days
Culvert at Taj colony Harwan. Ward 01
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹603
FA/CAO AC NO 0216010200000007
₹23,760
26 Jul 2026
9 Jul 2026
22 Jul 2026
10 Jul 2026
21 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing and removal of the rubbish upto a distance of 50m outside the periphery of the area cleared. | 5 | No | 553 | ₹2,765 |
| 2 | Diversion of water during execution of work including dewatering all complete | 1 | LS | 10,000 | ₹10,000 |
| 3 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in- charge 1:3:6 or richer mix (i/c equivalent design mix) | 19.36 | Cum | 1,725.2 | ₹33,399.87 |
| 4 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed all kinds of soil 50 meter beyond 1 m from cutting edge. | 41.1 | Cum | 479.35 | ₹19,701.29 |
| 5 | Providing & laying stone soiling hand packed tightly including all carriages of material complete upto site of work. | 51.68 | Cum | 850 | ₹43,928 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 38.83 | Cum | 5,202.9 | ₹2,02,028.61 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 80.64 | Cum | 6,591.25 | ₹5,31,518.4 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centering, shuttering, finishing and reinforcement with 1:1½:3 (1 cement: 1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | 3.2 | Cum | 9,821.85 | ₹31,429.92 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 318.99 | Kg | 123.2 | ₹39,299.57 |
| 10 | Centring and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 126.95 | Sqm | 286.35 | ₹36,352.13 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_1022422.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .