Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.7 LAdmitted-Finance | -2.00% | ₹5.7 L | L1 | Admitted-Finance |
| 2 | L2₹6.4 L+₹69,843.94 (12.2%)Admitted-Finance | +10.00% | ₹6.4 L+₹69,843.94 (12.2%) | L2 | Admitted-Finance |
| 3 | L3₹7.0 L+₹1.3 L (22.4%)Admitted-Finance | +20.00% | ₹7.0 L+₹1.3 L (22.4%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical KANCHALHKOOT | KANNAUJ | UTTAR PRADESH | 209720 | - | - | - | Not Admitted-Fee/PreQual/Technical Others-E STAMP IS USED IN VARIOUS OTHER WORKS |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-REGISTRATION CARD UPLOADED NOT READABLE BLURRED |
Tender Value
₹5.9 L
EMD Value
₹11,880
Closing Date
24 Aug 2026, 5:00 pmClosed
Er. Fayaz Ahmed Sheikh
Executive Engineer REW Ramban
As per NIT
2026_RDPR_320350_10
eNIT 21.2 of REW Ramban under head (ABDP/BDC/APDP/Tribal) Block GundiDharam and Gool for 2026-27
Open Tender
Civil Works
Percentage
30 days
Ramban
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer REW Ramban
₹11,880
5 Sept 2026
10 Aug 2026
25 Aug 2026
10 Aug 2026
24 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the road including removing vegetation and inequalities not exceeding 15cm in depth, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soils. | - | Sqm | 24.12 | - |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soils. | - | Cum | 577.9 | - |
| 3 | Providing and laying in position stones in horizontal position including cost of stones | 1 | Cum | 1,205 | ₹1,203.8 |
| 4 | Providing/Laying in position cement concrete of specified grade in 1:3:6 mix (1cement:3sand:6stone agg) with 20mm nominal size aggregates including curing | 1 | Cum | 5,733.6 | ₹5,727.87 |
| 5 | Providing and laying in position stones in concrete small size boulders including cost of stones | - | Cum | 855 | - |
| 6 | Providing/Laying in 900mm dia non-pressure NP3 medium class RCC pipes including collar/spigot jointed with stiff mixture of cement mortar in 1:2 mix including testing of joints completed | - | Rm | 3,951.65 | - |
| 7 | Providing and laying in position Dry stone Masonary with hard stones in foundation and plinth without bond stones | - | Cum | 2,744.35 | - |
| 8 | Carriage of Cement and Steel | - | Ton | 854 | - |
| 9 | Carriage of Sand | - | Cum | 2,167 | - |
| 10 | Carriage of aggregates | 1 | Cum | 1,063 | ₹1,061.94 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.50 MB
BOQ_1064745.xls
BOQ • 0.28 MB
corrigendum21point2.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .