Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-AOC | ₹10.9 L Quoted ₹9.3 L | L1 | Accepted-AOC 1st Lowest amount |
| 2 | L2₹9.3 LRejected-Finance 0 | ₹9.3 L | L2 | Rejected-Finance 2nd Lowest amount |
| 3 | L3₹9.4 LRejected-Finance | ₹9.4 L | L3 | Rejected-Finance 3rd Lowest amount |
Tender Value
₹10.9 L
EMD Value
₹92,663
Closing Date
12 May 2026, 3:00 pmClosed
E.O.
NPP Jaunpur
Civil work 5
2026_DOLBU_1143163_5
190/8-Nirman
Open Tender
Civil Works
NPP Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,594
E.O.
₹92,663
29 Jun 2026
29 Apr 2026
12 May 2026
29 Apr 2026
12 May 2026
29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth up to a distance of 30m. from the foundation trenches including all T&P. Sl no.-251 | 225 | Cum | 189 | ₹42,525 |
| 2 | Providing and laying in Cement concrete 1:4:8 (1Cement:4 find sand 8 graded brick ballast 40mm nominal size) and curing complete, including cost of formwork in foundation and floors. SI No.-275 | 30 | Cum | 4,746.1 | ₹1,42,383 |
| 3 | Supply and laying 1200mm dia RCC pipe np3 including collares jointed mixture of cement mortor including all complete | 60 | Rmt | 8,850 | ₹5,31,000 |
| 4 | Barracading arragment woprk all item bamboo balli including all complete | 15 | nos | 1,000 | ₹15,000 |
| 5 | Sand filling in base of sewer pipe np3 including all complete | 22.5 | sqm | 850 | ₹19,125 |
| 6 | Construction of brick masonary R.C.C. Hume pipe 1.56m internal dia at and 0.90 dia at top in cement mortar 1:4 in side cement plaster in 1:3 in foundation including all complete | 4 | nos | 26,000 | ₹1,04,000 |
| 7 | Earth work filling with 4.00km caratage including all complete. | 90 | Cum | 259.9 | ₹23,391 |
| 8 | Disposal of malaba out site of munciple limit including of site cleaning all complete | 168.75 | Cum | 177.8 | ₹30,003.75 |
| 9 | Construction of padustrial board of size 1.20x0.75m all complete. | 1 | nos | 19,200 | ₹19,200 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.12 MB
BOQ_2135163.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid