Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹201.3 CrAdmitted-Finance PLOT NO 3 YOGANAND CO OP HOUSING SOCIETY BEHIND BIJAN HOSPITAL NEAR MALPANNI HOSPITAL VIGHA MALA CANADA CORNER COLLEGE ROAD NASHIK | NASHIK | NASHIK | MAHARASHTRA | L1 | Admitted-Finance | |
| 2 | L2₹227.2 Cr+₹25.9 Cr (12.9%)Admitted-Finance BLDG NO 8 BEHIND BOMBAY STOCK EXCHANGE RAJABHADUR MANSION AMBALAL DOSHI MARG 2ND FLOOR VILLAGE TOWN FORT CITY MUMBAI | L2 | Admitted-Finance |
Tender Value
₹67.0 Cr
EMD Value
₹67.0 L
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Chief Engineer MSIDC
Chief engineer ,B13, 13th floor, Bakhtawar building
Construction of Darshan path, Toilet block and area development works under Pilgrimage site development plan at Shri Trimbakeshwar Dist Nashik
2025_MSIDC_1241180_2
14
Open Tender
Civil Works
Item Rate
365 days
Tribakeshwar
Please refer Tender documents.
7 documents required · 7 mandatory
₹11,800
Yes
₹67.0 L
Yes
Chief engineer ,B13, 13th floor, Bakhtawar buildin
25 Dec 2025
6 Nov 2025
29 Nov 2025
6 Nov 2025
27 Nov 2025
6 Nov 2025
13 Nov 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting down trees including trunks and branches with girths above 30 cm. to 60 cm. and stacking the material neatly with all lifts and lead of 1000 m as directed and earth filling in the depression/pit if any. | 40 | Number | 207 | ₹8,280 |
| 2 | Cutting down trees including trunks and branches with girths above 60cm to 90cm and stacking the materials neatly with all lifts and lead of 1000m. as directed and earth filling in the depression/pit if any. | 5 | Number | 252 | ₹1,260 |
| 3 | Cutting down trees including trunks and branches with girths above 90 cm. to 180 cm. and stacking the material neatly with all lifts and lead of 1000 m as directed and earth filling in the depression/pit if any. | 5 | Number | 429 | ₹2,145 |
| 4 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift upto 1.5 metre) by Mechanical Means.. | 6,621.38 | Cubic Metre | 524 | ₹34,69,603.12 |
| 5 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum,
including removing the excavated material upto a distance of 50 metres beyond the buildingareaandstacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means | 2,047.92 | Cubic Metre | 514.8 | ₹10,54,269.22 |
| 6 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift upto 1.50 m) by Mechanical Means.. | 9,361.28 | Cubic Metre | 557.7 | ₹52,20,785.86 |
| 7 | Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift from 1.5 to 3.0 m.) by Mechanical Means. | 2,182.32 | Cubic Metre | 120 | ₹2,61,878.4 |
| 8 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting, dewatering etc. complete (lift upto 1.5 m) by Mechanical Means. | 7,551.53 | Cubic Metre | 2,160 | ₹1,63,11,304.8 |
| 9 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 meters beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/ murum, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift from 1.5 metre to 3.0 metre) by Mechanical Means. | 3,254.16 | Cubic Metre | 660 | ₹21,47,745.6 |
| 10 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper. | 8,017 | Square Metre | 107 | ₹8,57,819 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
Drawings.pdf
Tender Documents • 5.09 MB
BOQ_2141609.xls
BOQ • 0.66 MB
DTP.pdf
Tender Documents • 5.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .