| 1 | L1₹12.4 CrAdmitted-Finance NO 5 NMK COLONY 1ST CROSS TRICHY 620020 | TRICHY | TRICHY | TAMIL NADU | 620020 | ₹12.4 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SAKTHIVEL L1 |
|---|---|---|---|---|
| 1.00Line works | ||||
| 1.10 | Clearing scrub jungle including cost of clearing away the site with all labour, lead, lift , T&P etc complete. | 29,394 | sqm | 5 ₹1.5 L |
| 2.00 | Conducting check survey,pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead lift etc complete. | 66 | Loc | 1,100 ₹72,600 |
| 3.00 | Levelling the site for forming approach road by using earth mooving equipment including lead, lift,etc., complete. | 60 | Hr | 1,300 ₹78,000 |
| 4.00 | Supplying, collection and stacking, spreading of well gravel for approach road including cost and conveyance of gravel and all labour charges lead, lift etc., complete. | 7,820 | Cum | 700 ₹54.7 L |
| 5.00 | Forming coffer dam for divertion of water with sand bags during the construction of pile foundation including cost of all materials labour, lead, lift etc., complete. | 900 | Cum | 3,800 ₹34.2 L |
| 6.00 | Transport of piling and boring equipments such as boring rig, winches, motors, bentonite pump, shells, boiler casing pipe, etc., to location by pulling into river using crane including transport and hire charges etc., complete. | 5 | LOC | 52,565 ₹2.6 L |
| 7.00 | Setting of pilling and boring equipement, tripod with all accessories and tools at each pile location based on the sequence of operation approved by the Engineer incharge at site irrespective of the location and distance of the boring rig for 500 mm dia pile including mobilisation and demobilisation after comletion of pilling works etc., complete. | 60 | No | 14,000 ₹8.4 L |
| 8.00 | Supplying, fabrication of 6mm M.S. sheet for making into circular casing shape to the required dia including welding, placing in position and driving into bore hole including cost of all materilas and MS plate, all labour charges etc., complete. 500 mm dia Pile | 1,188 | RM | 15,000 ₹1.8 Cr |
| 9.00 | Earthwork excavation in In hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil . | 4,116 | cum | 250 ₹10.3 L |
Tender Value
₹10.0 Cr
EMD Value
₹10.0 L
Closing Date
28 Nov 2022, 2:00 pmClosed
CE/TP-II/Trichy
The Chief Engineer, Transmission Projects II, Periyamilaguparai, Near Collectorate, Trichy - 1.
Erection of 110KV DC line on DC tower for making LILO of existing 110KV poyyur- Sathamangalam-Thatchankurichi feeder at the proposed upgradation of Thiruvaiyar 110 KV SS.
2022_EB_258480_1
CE/TP-II/TRY/C-28/22-23
Open Tender
Civil Works
210 days
Thiruvaiyaru
As per Tender Specification
4 documents required · 4 mandatory
₹0
₹10.0 L
Yes
9 Dec 2022
26 Oct 2022
29 Nov 2022
26 Oct 2022
28 Nov 2022
26 Oct 2022
Amount
Line works
Clearing scrub jungle including cost of clearing away the site with all labour, lead, lift , T&P etc complete.
Conducting check survey,pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead lift etc complete.
Levelling the site for forming approach road by using earth mooving equipment including lead, lift,etc., complete.
Supplying, collection and stacking, spreading of well gravel for approach road including cost and conveyance of gravel and all labour charges lead, lift etc., complete.
Forming coffer dam for divertion of water with sand bags during the construction of pile foundation including cost of all materials labour, lead, lift etc., complete.
Transport of piling and boring equipments such as boring rig, winches, motors, bentonite pump, shells, boiler casing pipe, etc., to location by pulling into river using crane including transport and hire charges etc., complete.
Setting of pilling and boring equipement, tripod with all accessories and tools at each pile location based on the sequence of operation approved by the Engineer incharge at site irrespective of the location and distance of the boring rig for 500 mm dia pile including mobilisation and demobilisation after comletion of pilling works etc., complete.
Supplying, fabrication of 6mm M.S. sheet for making into circular casing shape to the required dia including welding, placing in position and driving into bore hole including cost of all materilas and MS plate, all labour charges etc., complete. 500 mm dia Pile
Earthwork excavation in In hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil .
Supply and fixing of stub and clead,template including assembling of template setting of stub ,cleat and dismantling of template and shifting the template from loc to loc and reassembling including cost of template , all labour, T&P , lead, lift , fabrication charges etc complete. as per approved drawing, BOM and specification.
KCR tower
HCR tower
GCR tower
QD Tower
PCC1:2:4 using 20mm metal for foundation for tower concrete with out form work including cost of all materials, lead, lift , etc complete .
PCC1:2:4 using 20mm metal for foundation tower concrete with steel frustum box and chimney box work including cost of all materials, lead, lift , etc complete .
RCC 1:1.5:3 grade using 20mm (machine crushed) metal for foundation using mixture machine with steel frustum box including cost of all materials, labour lead, lift, etc., complete. But excliding cost for steel reinforcement .
RCC 1:1.5:3 grade using 20mm (machine crushed) metal for chimney concrete using mixture machine with steel chimney box including cost of all materials, labour lead, litf, etc., complete. But excliding cost fo steel reinforcement .
Boring and concreting of vertical reinforced concrete pile of 500 mm dia. upto required depth from tip of the in all clauses of soil using pile augurs for boring using Bentonite slurry and filling the bore with RCC M30 concrete using 20 mm machine crushed metal and a maximum water cement ratio not exceeding 0.50 with admixtures of CONCARE or equivalant make 1.2 lit. per cum. of concrete, as per specification including cost of all materials, labour, lead, lift etc., complete (But excluding cost of steel reinforcement).
Chipping and dismantling of pile concrete from bed level to cutoff level of pile to met sound concrete and clearing the dismantled concrete from pile location including cost of all labour charges etc., complete.
PCC 1:4:8 using 40 mm HBG metal for base course for Pile cap and tie beam including cost and conveyance of all materials, labour, lead, lift etc., complete.
RCC M25 using 12 to 20 mm HBG metal for pile cap and for Tie beam with steel shuttering and steel form work as per drawing including cost and conveyance of all materials, labour, lead, lft etc., complete but excluding cost of steel reinforcement.
RCC M25 using 20 mm HBG metal for Piers for tower legs with steel shuttering and steel form work as per drawing including cost and conveyance of all materials, labour, lead, lift etc., complete but excluding cost of steel reinforcement.
Supplying & Providing MS/RTS steel reinforcement including cost of steel rodreinforcement , binding wire including cost of all materials,labour, lead and lift etc., complete.
PCC 1:2:4 using 20 mm HBG metal for the protection arrangements around the pile cap and Tie beam with steel form work as per drawing including cost and conveyance of all materials, labour, lead, lift etc., complete but excluding cost of steel reinforcement.during flood.
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete.
Providing pipe type earthing for each tower location including extra excavation in foundation pits of towers for fixing 3m long 25mm dia GI "B" class earthpipe and GI wire 2.40m long with legs on both terminals for connecting the GI pipe with tower leg ,refilling with excavated earth mixed with solt and charcoal as per standard specification including all cost of 25 mm GI B class pipe as per IS fabrication of legs for connection arrangement materials,transport, all labours, leads, lifts etc complete.
Providing earthing arrangements for terminal tower including necessary excavation for fixing 3m long 50mm dia GI "B" class pipe,60cm dia with 5cm shell thick of RCC collar and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of materials lead lift etc complete as per standard specifications.
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges,labour, fuel, oil, transport etc complete.
Providing dewatering using 10 HP diesel pump with 40mm dia filter point suction pipe to a depth not less than 5m including drilling of 10 Nos. filter points well for each pit and connecting to main pipe fpr dewatering including mobilisation,delivery pipe should not be less than 50m,labour charges ,lead lift etc complete
Providing shoring and shuttering in foundation using wooden planks and scantling including all cost of materials, labour, lead, lift etc complete.
Supply,fabrication and Labour charges for fixing of 25mm GI rod with MS flat of size 60x6mm for anchorage fixed in the pier vertically @ 30cm c/c to the required length for ladder purpose in correct position including labour ,cutting etc., complete as per the drawing and std.specification
Supply, transport and Erection of GI tower/extension angles including cost of T &P,labour, lead, lift etc complete.as per approved drawing , BOM and specification . MS tower parts.
Supply, transport and Erection of GI tower/extension angles including cost of T &P,labour, lead, lift etc complete.as per approved drawing , BOM and specification . HT tower parts.
Labour charges for hoisting of 7 units of 90 KN single suspension Disc insulators with necessary hardware fittings for panther and U bolt including all cost of labour,lead, lift, T & P etc complete.
With PA rod for panther
Without PA rod for panther
Labour charges for hoisting of 8 units of 120 KN single Tension Disc insulators with necessary hardware fittings for panther including all cost of labour,lead, lift, T & P etc complete.
Labour charges for stringing of 6 Nos of ACSR Panther conductor including cost of loading & unloading transporting , sorting out of drums according to drum schedule providing trusseles ,paying out, jointing,rough sagging, tensioning, clipping, providing vibration dambers at tension locationsand all accessories including jumber connections, cost of T&P ,moving the drum to work spot all labour ,lead, lift, etc complete in all respects .
Continuous span
Single Span With out LC
Single Span With LC
Transport of 7/3.55mm earthwire , paying out, jointing, rough sagging, tensioning, including giving jumber connection including Supply of all Hardware Fittings ,transport charges, loading unloading,major and minor t&Ps, lead lift etc complete.
Multi span without LC
Single Span without L.C
Single Span with L.C
PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials, labour, lead, lift,etc complete .
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials,labour,lead,lift etc complete.
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials,labour, lead lift etc complete
Supplying and fixing of number plates, danger board,phase plate including all cost of materials,labour transport,lead, lift,etc complete.
Supply,fabrication and fixing of name board with 18 gauge plate including cost of materials, labour for writing name of the line etc complete .
Labour charges for removal of trees
Large tree
Small tree
Providing temporary guys wherever necessary including excavation, burying out of anchor for staywire, tightening, dismantling the same after completion of works including cost of all materials,lead,lift,labour etc complete.
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead ,lift etc complete.
Providing trussels for major and minor road crossing including cost of all materials, labour, lead lift etc. Complete.
Supply,Transport and fixing of PG clamp for panther with jumper provisions for loop arrangements as per the instructions of site engineer including all cost of labour,lead, lift, T & P etc complete if necessary.
Supplying and fixing RCC well Ring for required sizes as per direction of site engineer at site including cost of all materials lead, lift, labours, etc, complete
Releasing and lowering of existing 3 nos panther conductor and restringing the conductor with required sag into the newly erected tower including all labour lead, lift T & P etc complete (under LC )
Releasing and lowering of existing 1 no Earth wire and restringing the conductor with required sag into the newly erected tower including all labour lead, lift T & P etc complete.(under LC )
SGST & CGST (If applicable quote the value, if not enter '0')
IGST (If applicable quote the value, if not enter '0')
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_305663.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid