| 1 | L1₹4.0 CrAdmitted-Finance | ₹4.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.2 Cr+₹21.5 L (5.41%)Admitted-Finance | ₹4.2 Cr+₹21.5 L (5.41%) | L2 | Admitted-Finance |
| 3 | L3₹4.2 Cr+₹26.0 L (6.54%)Admitted-Finance NOT SPECIFIED | ₹4.2 Cr+₹26.0 L (6.54%) | L3 | Admitted-Finance |
| 4 | L4₹4.8 Cr+₹80.0 L (20.1%)Admitted-Finance SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | ₹4.8 Cr+₹80.0 L (20.1%) | L4 | Admitted-Finance |
| 5 | L5₹4.9 Cr+₹91.0 L (22.9%)Admitted-Finance | ₹4.9 Cr+₹91.0 L (22.9%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | United Sales Corporation L3 | devan enterprises L7 | Lucky Enterprises L6 | Shree Ayyappa Engineering L4 | Sai Ram Builders L5 | SPAAN Infratech L1 | Lite Systems Indus Pvt Ltd L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Schedule 'A' Part-I (BUILDINGS AND STRUCTURES) This Schedule (contains under mentioned Sl item No. 1.01) is not prepriced by MES and the prepriced rate indicated in Col - 5 as ₹0.00 indicates this fact only. The tenderer is required to quote their rates in Col 6. | ||||||||||
| 1.01 | Construction of Operator cum storage room alongwith attached toilet including all fittings and fixtures complete all as specified and as shown on drawings. | 2 | EACH BLOCK | 8,00,000 ₹16,00,000 | 9,86,800 ₹19,73,600 | 7,40,000 ₹14,80,000 | 15,00,000 ₹30,00,000 | 4,00,000 ₹8,00,000 | 3,50,000 ₹7,00,000 Lowest | 4,50,000 ₹9,00,000 |
| 2.00 | Lump sum price worked out by the Contractor for “B/R WORK SERVICES FOR DATA CENTRE FACILITY" as listed in Schedule ‘A’ Part - II representing __________ % __________________ percent Above / Below the lump sum price of `16,19,282.95 inserted by the MES in Schedule ‘A’ Part - II | 1 | LUMPSUM | 16,19,282.95 ₹16,19,282.95 | 18,98,000 ₹18,98,000 | 16,95,078 ₹16,95,078 | 17,81,212 ₹17,81,212 | 19,10,700 ₹19,10,700 | 16,00,000 ₹16,00,000 | 9,90,000 ₹9,90,000 Lowest |
| 3.00 | Lump sum price worked out by the Contractor for “B/R PORTION (02 Nos COVER SHEDS) SITE" as listed in Schedule ‘A’ Part - III representing __________ % __________________ percent Above / Below the lump sum price of `20,87,349.10 inserted by the MES in Schedule ‘A’ Part - III | 1 | LUMPSUM | 20,87,349.1 ₹20,87,349.1 | 20,80,000 ₹20,80,000 | 17,72,736 ₹17,72,736 | 21,12,500 ₹21,12,500 | 24,65,000 ₹24,65,000 | 20,00,000 ₹20,00,000 | 16,60,000 ₹16,60,000 Lowest |
| 4.00 | Lump sum price worked out by the Contractor for “EXCAVATION AND EARTHWORK" as listed in Schedule ‘A’ Part - IV representing __________ % _________________________ percent Above / Below the lump sum price of `42,173.13 inserted by the MES in Schedule ‘A’ Part - IV | 1 | LUMPSUM | 42,173.13 ₹42,173.13 | 38,900 ₹38,900 | 32,985 ₹32,985 Lowest | 52,150 ₹52,150 | 48,000 ₹48,000 | 42,000 ₹42,000 | 41,000 ₹41,000 |
| 5.00 | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part - V representing __________ % _______________________ percent Above / Below the lump sum price of `10,65,969.00 inserted by the MES in Schedule ‘A’ Part - V | 1 | LUMPSUM | 10,74,723 ₹10,74,723 | 12,89,650 ₹12,89,650 | 14,51,621 ₹14,51,621 | 10,84,442.9 ₹10,84,442.9 | 10,70,000 ₹10,70,000 | 13,77,448 ₹13,77,448 | 10,49,000 ₹10,49,000 Lowest |
| 6.00 | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part - VI representing __________ % ____________ percent Above / Below the lump sum price of ₹33,783.45 inserted by the MES in Schedule ‘A’ Part - VI | 1 | LUMPSUM | 50,000 ₹50,000 | 28,500 ₹28,500 Lowest | 31,940 ₹31,940 | 41,980 ₹41,980 | 45,000 ₹45,000 | 45,000 ₹45,000 | 33,780 ₹33,780 |
| 7.00 | Lump sum price worked out by the Contractor for “ROAD / PATH / CULVERT / HARDSTANDING” as listed in Schedule ‘A’ Part - VII representing ________ % ____________ percent Above / Below the lump sum price of ₹5,00,073.51 inserted by the MES in Schedule ‘A’ Part - VII | 1 | LUMPSUM | 5,25,000 ₹5,25,000 | 6,23,600 ₹6,23,600 | 5,00,135 ₹5,00,135 | 4,92,800 ₹4,92,800 | 6,25,000 ₹6,25,000 | 6,50,000 ₹6,50,000 | 4,10,000 ₹4,10,000 Lowest |
| 8.00 | Lump sum price worked out by the Contractor for “SEWAGE DISPOSAL” as listed in Schedule ‘A’ Part - VIII representing _______ % _________________ percent Above / Below the lump sum price of `1,18,847.22 inserted by the MES in Schedule ‘A’ Part - VIII | 1 | LUMPSUM | 1,25,000 ₹1,25,000 | 1,65,000 ₹1,65,000 | 1,38,144 ₹1,38,144 | 1,37,500 ₹1,37,500 | 1,20,000 ₹1,20,000 | 1,55,500 ₹1,55,500 | 1,00,000 ₹1,00,000 Lowest |
| 9.00 | Lump sum price worked out by the Contractor for “EXTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part - IX representing __________ % _________________ percent Above / Below the lump sum price of ₹9,47,499.00 inserted by the MES in Schedule ‘A’ Part - IX | 1 | LUMPSUM | 11,85,000 ₹11,85,000 | 13,65,800 ₹13,65,800 | 17,90,092 ₹17,90,092 | 10,42,248 ₹10,42,248 Lowest | 11,08,600 ₹11,08,600 | 11,27,800 ₹11,27,800 | 12,87,000 ₹12,87,000 |
Tender Value
₹4.4 Cr
EMD Value
₹5.2 L
Closing Date
17 Aug 2026, 6:55 pmClosed
CHIEF ENGINEER RND SECUNDERABAD
CHIEF ENGINEER RND SECUNDERABAD OPP JUBILEE BUS STATION PICKET SECUNDERABAD 500003
PROVISION OF DG SETS AND ELECTRICAL ACCESSORIES FOR DATA CENTRE FACILITY AT CABS BANGALORE
2026_MES_765544_2
82678
Open Tender
Electrical and Maintenance Works
Lump-sum
300 days
EAST BANGALORE
Class A category b(i) and b(ii)
8 documents required · 8 mandatory
₹2,000
GARRISON ENGINEER I RND EAST BANGALORE
₹5.2 L
Yes
28 Aug 2026
27 Jul 2026
19 Aug 2026
27 Jul 2026
17 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule 'A' Part-I (BUILDINGS AND STRUCTURES) This Schedule (contains under mentioned Sl item No. 1.01) is not prepriced by MES and the prepriced rate indicated in Col - 5 as ₹0.00 indicates this fact only. The tenderer is required to quote their rates in Col 6. | |||||
| 1.01 | Construction of Operator cum storage room alongwith attached toilet including all fittings and fixtures complete all as specified and as shown on drawings. | 2 | EACH BLOCK | - | - |
| - | Lump sum price worked out by the Contractor for “B/R WORK SERVICES FOR DATA CENTRE FACILITY" as listed in Schedule ‘A’ Part - II representing __________ % __________________ percent Above / Below the lump sum price of `16,19,282.95 inserted by the MES in Schedule ‘A’ Part - II | 1 | LUMPSUM | 16,19,282.95 | ₹16,19,282.95 |
| - | Lump sum price worked out by the Contractor for “B/R PORTION (02 Nos COVER SHEDS) SITE" as listed in Schedule ‘A’ Part - III representing __________ % __________________ percent Above / Below the lump sum price of `20,87,349.10 inserted by the MES in Schedule ‘A’ Part - III | 1 | LUMPSUM | 20,87,349.1 | ₹20,87,349.1 |
| - | Lump sum price worked out by the Contractor for “EXCAVATION AND EARTHWORK" as listed in Schedule ‘A’ Part - IV representing __________ % _________________________ percent Above / Below the lump sum price of `42,173.13 inserted by the MES in Schedule ‘A’ Part - IV | 1 | LUMPSUM | 42,173.13 | ₹42,173.13 |
| - | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part - V representing __________ % _______________________ percent Above / Below the lump sum price of `10,65,969.00 inserted by the MES in Schedule ‘A’ Part - V | 1 | LUMPSUM | 10,65,969 | ₹10,65,969 |
| - | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part - VI representing __________ % ____________ percent Above / Below the lump sum price of ₹33,783.45 inserted by the MES in Schedule ‘A’ Part - VI | 1 | LUMPSUM | 33,783.45 | ₹33,783.45 |
| - | Lump sum price worked out by the Contractor for “ROAD / PATH / CULVERT / HARDSTANDING” as listed in Schedule ‘A’ Part - VII representing ________ % ____________ percent Above / Below the lump sum price of ₹5,00,073.51 inserted by the MES in Schedule ‘A’ Part - VII | 1 | LUMPSUM | 5,00,073.51 | ₹5,00,073.51 |
| - | Lump sum price worked out by the Contractor for “SEWAGE DISPOSAL” as listed in Schedule ‘A’ Part - VIII representing _______ % _________________ percent Above / Below the lump sum price of `1,18,847.22 inserted by the MES in Schedule ‘A’ Part - VIII | 1 | LUMPSUM | 1,18,847.22 | ₹1,18,847.22 |
| - | Lump sum price worked out by the Contractor for “EXTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part - IX representing __________ % _________________ percent Above / Below the lump sum price of ₹9,47,499.00 inserted by the MES in Schedule ‘A’ Part - IX | 1 | LUMPSUM | 9,47,499 | ₹9,47,499 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_875075.xls
BOQ • 0.66 MB
82678Tender.pdf
Tender Documents • 1.92 MB
Prepriced_Schedules_82678.pdf
Additional Documents • 0.47 MB
drawings_02 SP_BAN__1517_01 2026 Sht No 01 OF 02..pdf
Additional Documents • 0.10 MB
drawings_03 SP_BAN__1517_01 2026 Sht No 02 OF 02..pdf
Additional Documents • 0.10 MB
drawings_04 SP_BAN__1517_02 2026 Sht No 01 OF 02..pdf
Additional Documents • 0.09 MB
drawings_05 SP_BAN__1517_02 2026 Sht No 02 OF 02..pdf
Additional Documents • 0.10 MB
drawings_LC_BAN_58_2026 SHT No 1R OF 1.pdf
Additional Documents • 0.12 MB
drawings_WD_BAN_AR_535_01_2026 SHT No 1R OF 2.pdf
Additional Documents • 0.13 MB
drawings_WD_BAN_AR_535_01_2026 SHT No 2R OF 2.pdf
Additional Documents • 0.18 MB
drawings_WD_BAN_STR_535_01_2026 SHT No 1R OF 1.pdf
Additional Documents • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .