| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.9 L+₹1,057.01 (0.10%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | vadivel L2 | RGT INFRAA L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with in initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B Core wall | 16.38 | cum | 124.5 ₹2,039.31 | 122 ₹1,998.36 Lowest |
| 2.00 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 73.71 | cum | 5,113.64 ₹3,76,926.4 | 5,111.25 ₹3,76,750.24 Lowest |
| 3.00 | Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete | 62.11 | cum | 6,498.64 ₹4,03,630.53 | 6,496.05 ₹4,03,469.67 Lowest |
| 4.00 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete core wall | 172.9 | sqm | 172.97 ₹29,906.51 | 170.05 ₹29,401.65 Lowest |
| 5.00 | Provision for Bitumen pad including all Charges etc., complete | 12.94 | cum | 480 ₹6,211.2 | 479 ₹6,198.26 Lowest |
| 6.00 | Construction of Deck slab | 1 | cum | 1,02,573 ₹1,02,573 Lowest | 1,02,573 ₹1,02,573 Lowest |
| 7.00 | GST 18% | 1 | No | 1,65,831.65 ₹1,65,831.65 | 1,65,670.41 ₹1,65,670.41 Lowest |
Tender Value
Refer Docs
EMD Value
₹11,000
Closing Date
31 Jul 2025, 5:00 pmClosed
Block Development officer, walajah
Block Development office, walajah
Providing CC Pavement in Seenivasa Nagar H/O Thengal Panchayat in Walajah Block (182)
2025_RDTN_586437_1
A2/1170/2025
Open Tender
Civil Works
Works
30 days
Block Development office, Walajah
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹11,000
16 Sept 2025
28 Jul 2025
31 Jul 2025
28 Jul 2025
31 Jul 2025
28 Jul 2025
Amount
Earth work excavation and depositing on bank with in initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B Core wall
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete core wall
Provision for Bitumen pad including all Charges etc., complete
Construction of Deck slab
vadivel (BID ID -1417525)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_700504.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .