| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.0 LAdmitted-Finance HIG 11 GOURAV VIHAR HOUSING BORD COLONY MADHUBAN PARADIP JAGATSINGHAPUR ODISHA 754142 UDYAM OD 12 0001260 | JAGATSINGHAPUR | ODISHA | 754142 | ₹48.0 L | L1 | Admitted-Finance |
| 2 | L2₹50.9 L+₹2.9 L (6.14%)Admitted-Finance | ₹50.9 L+₹2.9 L (6.14%) | L2 | Admitted-Finance |
| 3 | L3₹51.1 L+₹3.1 L (6.51%)Admitted-Finance | ₹51.1 L+₹3.1 L (6.51%) | L3 | Admitted-Finance |
| 4 | L4₹51.1 L+₹3.1 L (6.54%)Admitted-Finance | ₹51.1 L+₹3.1 L (6.54%) | L4 | Admitted-Finance |
| 5 | L5₹51.3 L+₹3.3 L (6.90%)Admitted-Finance | ₹51.3 L+₹3.3 L (6.90%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RECKON INFRASTRUCTURE L3 | BASUDEV CONSTRUCTION L10 | AM CONSTRUCTION AND ENGINEERING L1 | Skater Infratech India Pvt. Ltd. L4 | M/s. P N Construction L6 | M/S BHAIRAB CHARAN SWAIN L8 | Nilamani Swain L7 | Padmanav Lenka L5 | LAXMIDHAR ROUT L9 | Jagannath Barik L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all kinds of soil from the existing ground level in foundation trenches & levelling, ramming as per requirement etc with all leads and lift disposing the excavated material within a lead of 5 km at locations as directed, dewatering etc with supply of all labour, materials, T&P, hire & running charges of all machineries, Port entry fees, all taxes etc all complete as per direction of Engineer in charge.(Excluding GST) | 1,859.55 | Each Cum | 100 ₹1,85,955 | 100 ₹1,85,955 | 90 ₹1,67,359.5 Lowest | 120 ₹2,23,146 | 300 ₹5,57,865 | 240 ₹4,46,292 | 120 ₹2,23,146 | 125 ₹2,32,443.75 | 207 ₹3,84,926.85 | 120 ₹2,23,146 |
| 2.00 | Dewatering by engaging 5HP diesel pump sets including supply of diesel pump, suction & delivery pipe, foot valve, fuel, operation, hire & running charges of pump, operator, transportation, labour, T&P etc all complete as directed by the Engineer-in-charge. (Excluding GST) | 30 | Each Hr | 20 ₹600 | 55 ₹1,650 | 40 ₹1,200 | 5.89 ₹176.7 Lowest | 100 ₹3,000 | 165 ₹4,950 | 60 ₹1,800 | 55 ₹1,650 | 306 ₹9,180 | 20 ₹600 |
| 3.00 | Supplying, mixing, transporting, laying in proper level and grade Cement Concrete 1:3:6 (1 Cement : 3Coarse Sand : 6 hard granite graded chips of 40mm & down metal, hoisting, laying in layers, by use of vibrator, finished smooth to the exposed surface, to proper level & gradient curing etc. with supply of all materials, labour, T&P, hire & running charges of all machineries, transportation charges,, etc. all complete as directed by the Engineer-in-charge. (Excluding cost of centering & shuttering).(Excluding GST). | 80.5 | Each Cum | 3,300 ₹2,65,650 | 3,900 ₹3,13,950 | 3,000 ₹2,41,500 Lowest | 3,989 ₹3,21,114.5 | 3,500 ₹2,81,750 | 5,100 ₹4,10,550 | 4,300 ₹3,46,150 | 4,000 ₹3,22,000 | 4,320 ₹3,47,760 | 3,800 ₹3,05,900 |
| 4.00 | RCC work of proportion 1:1.5:3 (1 Cement :1.5 coarse sand : 3 Chips) grade using crusher broken hard granite aggregate of 20mm & down size of approved quality, mixing, transporting, hoisting, laying in layers, consolidating by mechanical vibrator, finished smooth to the exposed surface to proper grade with supply of all materials, labour, T&P, excluding cost of GST, , all transportation charges, engagement hire & running charges of all machineries,testing charge etc. complete as directed by the Engineer-in-charge (But excluding cost of binding wire, cost of Steel & labour charges for cutting, bending, binding, placing of reinforcement and cost of centering & shuttering). | 316.4 | Each Cum | 5,200 ₹16,45,280 | 5,500 ₹17,40,200 | 5,200 ₹16,45,280 | 6,789 ₹21,48,039.6 | 4,800 ₹15,18,720 Lowest | 5,900 ₹18,66,760 | 5,900 ₹18,66,760 | 5,800 ₹18,35,120 | 6,570 ₹20,78,748 | 5,800 ₹18,35,120 |
| 5.00Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank,bullah of approved quality for R.C.C. structures and deshuttering and removing the same after dueperiod with supply of all materials, labour, T&P, taxes, royalties, tollage, etc. all complete but excluding GST as directed by Engineer-in -charge | |||||||||||||
| 5.10 | R.C.C. foundation and footing bases of columns mass concrete & pre
cast slab etc | 246.45 | Each Sqm | 300 ₹73,935 | 500 ₹1,23,225 | 300 ₹73,935 | 89 ₹21,934.05 Lowest | 500 ₹1,23,225 | 340 ₹83,793 | 105 ₹25,877.25 | 400 ₹98,580 | 405 ₹99,812.25 | 100 ₹24,645 |
| 5.20 | RCC wall & fins | 2,044 | Each Sqm | 500 ₹10,22,000 | 700 ₹14,30,800 | 380 ₹7,76,720 | 350.89 ₹7,17,219.16 | 400 ₹8,17,600 | 340 ₹6,94,960 Lowest | 470 ₹9,60,680 | 450 ₹9,19,800 | 405 ₹8,27,820 | 500 ₹10,22,000 |
| 6.00 | Supply Tor/TMT steel of Fe 500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour,materials, transportation charges, T&P, taxes, etc. all completebut excluding GST as per the direction of Engineer-in-charge. NB: No payment shall be made for extra weight than theoretical co-efficient. | 268.94 | Each Qtl | 6,500 ₹17,48,110 | 6,800 ₹18,28,792 | 6,500 ₹17,48,110 | 6,089 ₹16,37,575.66 | 6,700 ₹18,01,898 | 6,250 ₹16,80,875 | 6,700 ₹18,01,898 | 6,000 ₹16,13,640 Lowest | 6,300 ₹16,94,322 | 6,000 ₹16,13,640 Lowest |
| 7.00 | Refilling with excavated earth (excluding boulder, rubbish, debris, iron ore, coal and other deleterious materials etc.) in foundation etc. in layers not exceeding 20Cm. thickness, consolidating by watering and ramming with supply all labour, T&P, equipments, all taxes,etc. complete as directed by the Engineer-in-charge.( excluding cost of GST) | 619.85 | Each Cum | 250 ₹1,54,962.5 | 350 ₹2,16,947.5 | 210 ₹1,30,168.5 | 50.89 ₹31,544.17 Lowest | 150 ₹92,977.5 | 155 ₹96,076.75 | 75 ₹46,488.75 | 150 ₹92,977.5 | 90 ₹55,786.5 | 90 ₹55,786.5 |
| 8.00 | Engagement of unskilled labour for lifting of cables , cutting of tree branches and other huddles , repairing of damafed G.I pipe lines and electrical cables as and where required, depositing the same at designated place with supply of all taxes,T&P but exceeding GST etc. all complete as directed by Engineer-in-Charge. | 20 | Each manday | 600 ₹12,000 | 600 ₹12,000 | 600 ₹12,000 | 450.89 ₹9,017.8 | 500 ₹10,000 | 730 ₹14,600 | 430 ₹8,600 Lowest | 550 ₹11,000 | 640.08 ₹12,801.6 | 500 ₹10,000 |
Tender Value
₹68.9 L
EMD Value
₹1.4 L
Closing Date
11 Aug 2025, 5:00 pmClosed
S K SAMAL, EE, BCD, PPA
S K SAMAL, EE, BCD, PPA
Construction of R.C.C. drain connecting to existing drains backside temple of Sandhakud basti to new NRL drain
2025_MoS_869825_1
CE/BC/ACCTS-06/2025/284
Open Tender
Civil Works
Works
180 days
Paradip
Refer Tender Document and e-TCN
5 documents required · 5 mandatory
₹3,000
Yes
As per Tender Document and e-TCN
₹1.4 L
Yes
28 Oct 2025
21 Jul 2025
14 Aug 2025
21 Jul 2025
11 Aug 2025
21 Jul 2025
Amount
Earth work excavation in all kinds of soil from the existing ground level in foundation trenches & levelling, ramming as per requirement etc with all leads and lift disposing the excavated material within a lead of 5 km at locations as directed, dewatering etc with supply of all labour, materials, T&P, hire & running charges of all machineries, Port entry fees, all taxes etc all complete as per direction of Engineer in charge.(Excluding GST)
Dewatering by engaging 5HP diesel pump sets including supply of diesel pump, suction & delivery pipe, foot valve, fuel, operation, hire & running charges of pump, operator, transportation, labour, T&P etc all complete as directed by the Engineer-in-charge. (Excluding GST)
Supplying, mixing, transporting, laying in proper level and grade Cement Concrete 1:3:6 (1 Cement : 3Coarse Sand : 6 hard granite graded chips of 40mm & down metal, hoisting, laying in layers, by use of vibrator, finished smooth to the exposed surface, to proper level & gradient curing etc. with supply of all materials, labour, T&P, hire & running charges of all machineries, transportation charges,, etc. all complete as directed by the Engineer-in-charge. (Excluding cost of centering & shuttering).(Excluding GST).
RCC work of proportion 1:1.5:3 (1 Cement :1.5 coarse sand : 3 Chips) grade using crusher broken hard granite aggregate of 20mm & down size of approved quality, mixing, transporting, hoisting, laying in layers, consolidating by mechanical vibrator, finished smooth to the exposed surface to proper grade with supply of all materials, labour, T&P, excluding cost of GST, , all transportation charges, engagement hire & running charges of all machineries,testing charge etc. complete as directed by the Engineer-in-charge (But excluding cost of binding wire, cost of Steel & labour charges for cutting, bending, binding, placing of reinforcement and cost of centering & shuttering).
Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank,bullah of approved quality for R.C.C. structures and deshuttering and removing the same after dueperiod with supply of all materials, labour, T&P, taxes, royalties, tollage, etc. all complete but excluding GST as directed by Engineer-in -charge
R.C.C. foundation and footing bases of columns mass concrete & pre cast slab etc
RCC wall & fins
Supply Tor/TMT steel of Fe 500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour,materials, transportation charges, T&P, taxes, etc. all completebut excluding GST as per the direction of Engineer-in-charge. NB: No payment shall be made for extra weight than theoretical co-efficient.
Refilling with excavated earth (excluding boulder, rubbish, debris, iron ore, coal and other deleterious materials etc.) in foundation etc. in layers not exceeding 20Cm. thickness, consolidating by watering and ramming with supply all labour, T&P, equipments, all taxes,etc. complete as directed by the Engineer-in-charge.( excluding cost of GST)
Engagement of unskilled labour for lifting of cables , cutting of tree branches and other huddles , repairing of damafed G.I pipe lines and electrical cables as and where required, depositing the same at designated place with supply of all taxes,T&P but exceeding GST etc. all complete as directed by Engineer-in-Charge.
Jagannath Barik (BID ID -3264360)
RECKON INFRASTRUCTURE (BID ID -3260197)
Skater Infratech India Pvt. Ltd. (BID ID -3263142)
Padmanav Lenka (BID ID -3264497)
M/s. P N Construction (BID ID -3264099)
Nilamani Swain (BID ID -3264474)
M/S BHAIRAB CHARAN SWAIN (BID ID -3264337)
LAXMIDHAR ROUT (BID ID -3264258)
BASUDEV CONSTRUCTION (BID ID -3262297)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .