Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹4.6 L
Closing Date
22 Sept 2026, 5:00 pmDue today
Executive Engineer
Executive Engineer, Cont Divn PWD Batala
Construction of High Level Bridge 3 Spans 10.00 M each effective) over Kahnuwan Swamp Drain Crossing new link road Phulra to Kiri Afgana upto Sugar mIll road of R.D. 0.115 in District Gurdaspur
2026_CEPW_174981_1
31dt03092026
Open Tender
Civil Works - Bridges
Lump-sum
270 days
MC Sri Hargobindpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹20,000
₹4.6 L
Yes
8 Sept 2026
8 Sept 2026
23 Sept 2026
8 Sept 2026
22 Sept 2026
8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction o fHigh Level Bridge (3 Spans = 10.00 M each effective) over Kahnuwan Swamp Drain Crossing new link road Phulra to Kiri Afgana upto Sugar mIll road of R.D. 0.115 in District Gurdaspur ' ' In pursuant to clause No.42.1 of GCC. The rate quoted by the contractor shall be deemed to be inclusive of all taxes/GST……… (reaming matter as original )……… Nothing extra will be paid on this account.
Due to implementation of GST, VAT be read as GST in the Bidding Document.
' Bidder's Undertakings : 1. We offer to execute the works described above and remedy any defects therein and carry out the maintenance of the works up to expiry of the defect liability period in conformity with the Conditions of Contract, Specification, Drawings, Contract Data including Scope of Work, Schedule of Payment, Schedule for Variation in Scope of Work, Any other conditions stated in the bid document annexed hereto and Addenda /Corrigenda thereof, for the sum (s) stated in the Table of QuotedRate(s)below.
2. We undertake, if our Bid is accepted, to commence the works as soon as is reasonably possible after the receipt of the Engineer’s notice to commence, and to complete the whole of the works comprised in the contract within the time limit stated in the bid document. Should we fail to commence the work in stipulated time period and as per conditions of the bid document, our bid security may be forfeited absolutely and we shall not have any right to claim its refund.
3. We agreeto abide by this Bid for the period of 120 days from the date fixed for receiving the same,and it shall remain binding upon us and may be accepted at any time before the expiration of thatperiod.
4. Unless and until a formal agreement is prepared and executed this Bid to gether with your written acceptance thereof, shall constitute a binding contract betweenus.
5. We understand that you are not bound to accept the lowest or any tender you mayreceive | 1 | No | 1 | ₹1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
SBD_Bridge.pdf
Tender Documents • 7.22 MB
BOQ_356081.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .