| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance | -49.99% | ₹5.0 L | L1 | Admitted-Finance |
| 2 | L2₹5.7 L+₹69,888.45 (14.0%)Admitted-Finance | -43.00% | ₹5.7 L+₹69,888.45 (14.0%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
19 May 2026, 12:00 pmClosed
Executive Engineer
Executive Engineer PWD (RB) Division JMC Jammu
upgradation of lane and drain from master Pannu Ram toh/o Gori Shankar, Rohi Morh Lower Gadigarh ward 73 AC RS Pura
2026_HAUDD_309109_1
PWD(RB)DIVJMC/06 of 2026-27Dated 30-04-2026
Open Tender
Civil Works
Percentage
90 days
ward no 73
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD (RB) Division JMC Jammu
₹20,000
23 May 2026
30 Apr 2026
19 May 2026
30 Apr 2026
19 May 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:1 meter from cutting edge all kinds of soil. | 53.79 | Cum | 479.3 | ₹25,781.55 |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | 14.16 | Cum | 1,725.2 | ₹24,428.83 |
| 3 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with.1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 38.23 | Cum | 7,564.8 | ₹2,89,202.3 |
| 4 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8graded stone aggregate 40 mm nominal size) | 10.51 | Cum | 5,202.9 | ₹54,682.48 |
| 5 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5coarse sand : 10graded stone aggregate 40 mm nominal size) | 5.09 | Cum | 4,826.5 | ₹24,566.89 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 9.34 | Cum | 5,733.6 | ₹53,551.82 |
| 7 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate. | 19.16 | Sqm | 562.15 | ₹10,770.79 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size | 6.24 | Cum | 7,788.4 | ₹48,599.62 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 562 | kg | 123.2 | ₹69,238.4 |
| 10 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 480 | kg | 181.6 | ₹87,168 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_1000911.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .