Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹4.9 L Quoted ₹4.3 L | L1 | Accepted-AOC LOWEST TENDERER |
| 2 | L2₹4.4 LRejected-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹4.4 L | L2 | Rejected-AOC SECOND LOWEST TENDERER |
| 3 | L3₹5.2 LRejected-AOC | ₹5.2 L | L3 | Rejected-AOC THIRD LOWEST TENDERER |
| Sl No | Description | Qty | Unit | R SAMPATHKUMAR L2 | M.P.R. ASSOCIATES L3 | M SELVAM L1 |
|---|---|---|---|---|---|---|
| 1.00CIVIL WORK | ||||||
| 1.01 | Dismantling and clearing away and carefully stacking materials useful for re-use floor finish and dadooing walls in cement mortar with mosaic tiles, glazed tiles and cuddapah slab as directed by the departmental officers. | 24 | M3 | 260 ₹6,240 | 306.8 ₹7,363.20 | 250 ₹6,000 |
| 1.02 | Removing and Dismantling Clearing away the Partition works with in the campus Cost includes labours amd materials etc., complete complying with standard specification and as directed. | 255 | M2 | 90 ₹22,950 | 106.2 ₹27,081 | 80 ₹20,400 |
| 1.03 | Removing and Dismantling Clearing away the Wall Panelling with in the campus Cost includes labours amd materials etc., complete complying with standard specifications and as directed. | 251 | M2 | 125 ₹31,375 | 147.5 ₹37,022.50 | 120 ₹30,120 |
| 1.04 | Removing and Dismantling clearing away the False Ceiling with in the campus Cost includes labours and materials etc complete complying with standard specification and as directed
. | 545 | M2 | 110 ₹59,950 | 129.8 ₹70,741 | 100 ₹54,500 |
| 1.05 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete Beams of 15cm thickness in RCC 1:1.5:3 (one cement, One & Half crushed stone sand and three aggregates), using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of Beam, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed by the departmental officers. | 5 | M3 | 35,000 ₹1.8 L | 41,300 ₹2.1 L | 34,500 ₹1.7 L |
| 1.06 | Supplying and fixing Teakwood frame with scantling above 2m for doors including labour charges for wrought and put up and fixing holdfast in frame etc., complete complying with standard specification and as directed by the departmental officers. | 1.2 | M3 | 1,19,000 ₹1.4 L | 1,40,420 ₹1.7 L | 1,18,500 ₹1.4 L |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
13 Mar 2026, 2:00 pmClosed
EXECUTIVE ENGINEER
NO 9, CONRAN SMITH ROAD, GOPALAPURAM, CHENNAI - 60
Providing Teak Wood Frames and Precast Lintel beam in TNCSC Old Head Office Building in the work of Renovate 120 Years old TNCSC, head Office building with Modular Seating Arrangements at Kilpauk, Chennai -10
2026_TCSC_673120_1
46/CE/DB/DOE/063150/2025
Open Tender
Civil Works
30 days
KILPAUK
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹5,000
14 Mar 2026
11 Mar 2026
13 Mar 2026
11 Mar 2026
13 Mar 2026
11 Mar 2026
CIVIL WORK
Dismantling and clearing away and carefully stacking materials useful for re-use floor finish and dadooing walls in cement mortar with mosaic tiles, glazed tiles and cuddapah slab as directed by the departmental officers.
Removing and Dismantling Clearing away the Partition works with in the campus Cost includes labours amd materials etc., complete complying with standard specification and as directed.
Removing and Dismantling Clearing away the Wall Panelling with in the campus Cost includes labours amd materials etc., complete complying with standard specifications and as directed.
Removing and Dismantling clearing away the False Ceiling with in the campus Cost includes labours and materials etc complete complying with standard specification and as directed .
Manufacturing, supplying and fixing Precast Reinforced Cement Concrete Beams of 15cm thickness in RCC 1:1.5:3 (one cement, One & Half crushed stone sand and three aggregates), using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of Beam, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing Teakwood frame with scantling above 2m for doors including labour charges for wrought and put up and fixing holdfast in frame etc., complete complying with standard specification and as directed by the departmental officers.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_808963.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_808963.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid