| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹39.9 CrAdmitted-Finance | +7.66% | ₹39.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹47.4 Cr+₹7.5 Cr (18.8%)Admitted-Finance | +27.90% | ₹47.4 Cr+₹7.5 Cr (18.8%) | L2 | Admitted-Finance |
| 3 | L3₹50.1 Cr+₹10.1 Cr (25.4%)Admitted-Finance | +35.00% | ₹50.1 Cr+₹10.1 Cr (25.4%) | L3 | Admitted-Finance |
| 4 | L4₹53.1 Cr+₹13.2 Cr (33.0%)Admitted-Finance 1 513 VIDHYADHAR NAGAR JAIPUR 302039 RAJASTHAN | JAIPUR | RAJASTHAN | 302039 | +43.20% | ₹53.1 Cr+₹13.2 Cr (33.0%) | L4 | Admitted-Finance |
| 5 | L5₹54.9 Cr+₹15.0 Cr (37.6%)Admitted-Finance | +48.11% | ₹54.9 Cr+₹15.0 Cr (37.6%) | L5 | Admitted-Finance |
Tender Value
₹37.1 Cr
EMD Value
₹74.2 L
Closing Date
25 May 2026, 6:00 pmClosed
GM RSRDC LTD JAIPUR
GM RSRDC LTD SETU BHAWAN, JHALANA DOONGARI, JAIPUR
Renewal and Strengthening of Kishangarh Bass Khairthal Bansur Kotputli Road (MDR 25) from Km. 0/00 to 62/00
2026_RSRDC_555645_1
RSRDCC NIT 058/2026-27 Dated 01.05.2026 Sl No 1
Open Tender
Civil Works - Roads
Percentage
365 days
Kishangarh Bass Khairthal Bansur Kotputli Road
PLEASE REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹11,800
PD RSRDC UNIT ALWAR THROUGH NEFT/RTGS/IMPS/BG
₹74.2 L
PD RSRDC UNIT ALWAR
10 Jun 2026
4 May 2026
26 May 2026
4 May 2026
25 May 2026
15 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass,bushes,shrubs,saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceablematerials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150mm in thickness as per MoRTH Specification Clause 201. by mechanical means in area of non thorny jungle | 31 | P.Hect. | 10,374 | ₹3,21,594 |
| 2 | Dismantling of flexible pavements and disposal of dismantled materials uptoa lead of 100 m, stacking serviceable and unserviceable materials
separately as per MoRTH Specification Clause 202 by mechanical means.Bituminous courses & Granular courses | 2,100 | P.Cum | 69 | ₹1,44,900 |
| 3 | Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means. for Grading-I Material | 5,859 | P.Cum | 773 | ₹45,29,007 |
| 4 | Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means. for Grading-III Material | 29,295 | P.Cum | 738 | ₹2,16,19,710 |
| 5 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406. by mechanical mean with all lead. | 5,670 | P.Cum | 1,044 | ₹59,19,480 |
| 6 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 | 22,050 | P. Sqm | 28 | ₹6,17,400 |
| 7 | Providing and applying tack coat with Bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 to 0.40 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per MoRTH Specification Clause 503 and IRC-16-2008 | 8,27,610 | P. Sqm | 13.5 | ₹1,11,72,735 |
| 8 | Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tones per hour using crushed aggregates of specified grading, premixed with bituminous binder minimum @ 4.0 & 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH Specifications Clause 505 complete in all respects. Bitumen (VG-30) Grading - II (26.50 mm nominal size) | 24,829 | P.Cum | 6,260 | ₹15,54,29,540 |
| 9 | Milling of distress bitumenous layer upto 70mm depth in a single pass with suitable milling machine (capable of milling @ 200&300 sqm of area per hr) fitted with loading conveyer of loading the filled material directly on the trucks i/c hauling and stock pilling the reclaiming to bring to required specification to reuse with the approval of engineer - in - charge for safe disposal; with all leads and lifts complete in all respect as directly by Engineer - in- charge.*Note : The unutilized quality of reclaimed bituminous mix material shall be recovered. | 2,61,170 | P.sqm | 22 | ₹57,45,740 |
| 10 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder minimum @ 5.2 & 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH Specifications Clause 507 complete in all respects for Grading - II ( 13 mm Nominal Size ) Bitumen (VG-30) | 12,415 | P.Cum | 7,241 | ₹8,98,97,015 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.35 MB
Various_Act_Circulars_Orders_Notification30.pdf
Tender Documents • 0.86 MB
BOQ_989473.xls
BOQ • 0.32 MB
BankDetailsNIT58kbk.pdf
Tender Documents • 0.34 MB
SBDRoadKBK.pdf
Tender Documents • 1.14 MB
EngineeringcostKBKroad19052026.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .