Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.0 LAccepted-AOC C 46 OPP SECTOR 4 SURYA VIHAR GURUGRAM HARYANA | 2025 | 1 | Accepted-AOC AOC | |
| 2 | 2₹11.4 L+₹1.4 L (13.6%)Rejected-Finance MAIN SHEETLA MATA ROAD GURGAON SHOP NO 5 MAIN SHEETLA MATA ROAD NEAR FEDEX COURIER GURGAON 122001 | GURGAON | GURUGRAM | HARYANA | 122001 | 2 | Rejected-Finance 2 |
| Sl No | Description | Qty | Unit | Hitech techno Services L2 | THE DAT GREENS COOPERATIVE L AND C SOCIETY LIMITED L1 |
|---|---|---|---|---|---|
| 2.00Erection of GI pole,Street light fitting and Supply and erection of LT cable other contingent item there on at Hero Honda road to Central Park road under limit of MCG. | |||||
| 3.00 | Supply and erection of 2.5 sqmm 3 core unard FRLS PVC insulated ISI Marked copper conductor cable complete as per entire satisfication of engineer in charge.Make RR / Havells / Polycab/Grandley. 2.5 Sq. mm 3 Core Cable. | 400 | Metre | 100 ₹40,000 Lowest | 112 ₹44,800 |
| 4.00 | Providing trench less cuttting by Hydraulic Drilling Device boring/ Manual OR through some suitable alternate method with insertion of HDPE Pipe including supply, Delivery of HDPE pipe at work site and laying of 50mm internal diameter HDPE pipe inside road for road corssing of cable by Hydraulic Drilling Device without opening of the road top surface, laid at a depth of at least 900mm below the road surface from the feeding point to the feeder pillar box in median (OR) from feeder pillar to respective street light pole including cost of all accessories for road crossing for laying of cables.. | 100 | Metre | 200 ₹20,000 Lowest | 200 ₹20,000 Lowest |
| 5.00 | Operation and Maintenance of 1and2 year free of cost | 1 | Each | 1 ₹1 Lowest | - |
| 6.00 | Supply and erection of Sword type single Arm GI bracket with Big Ball on top and small Ball Complete in all respect including nut and bolts required for installation with suitable size of GI pole. | 36 | Each | 2,800 ₹1,00,800 | 2,500 ₹90,000 Lowest |
| 7.00 | Instatllation of Dismantled old pole including the cost of labour and transportation (store to site) required to complete the job in all respect upto the entire satisfaction of engineer-in-charge of the work. | 36 | Each | 1,440 ₹51,840 | 500 ₹18,000 Lowest |
| 8.00 | Erection Testing and commissioning of Three phase CCMS panel petty material required for installation of ccms panel i.e clamp,nut and bolts,thimble ,wire etc complete in all material required for installation on PCC pole or Pedstal. complete in all material required for installation on PCC pole or Pedstal. | 1 | Each | 2,050 ₹2,050 | 1,000 ₹1,000 Lowest |
| 9.00 | Providing and fixing of 4G/5G Sim Card and recharse fees per month for street lights CCMS panel Compelte in all respect required for proper operation of CCMS panel. 500 Nos x 60 | 48 | Each | 77 ₹3,696 Lowest | 77 ₹3,696 Lowest |
| 10.00 | Operation and Maintenance of 3rd Year @ 6% of Capital Cost.... | 1 | Each | 10,000 ₹10,000 Lowest | - |
| 11.00 | Operation and Maintenance of 4th Year @ 7% of Capital Cost..... | 1 | Each | 12,000 ₹12,000 Lowest | - |
Tender Value
₹13.5 L
EMD Value
₹27,046
Closing Date
28 May 2026, 12:00 pmClosed
SACHIN YADAV
Municipal Corporation Gurugram
Erection of GI pole,Street light fitting and Supply and erection of LT cable other contingent item there on at Hero Honda road to Central Park road under limit of MCG.
2026_HRY_523112_1
20262E575471 C594 4A08 AE1D 8ECE4C36B0BD285ULB
Open Tender
Civil Works
Works
90 days
Gurugram
Erection of GI pole,Street light fitting and Supply and erection of LT cable other contingent item there on at Hero Honda road to Central Park road under limit of MCG.
2 documents required · 2 mandatory
₹1,180
Yes
₹27,046
Yes
5 Jun 2026
20 May 2026
28 May 2026
20 May 2026
28 May 2026
20 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Erection of GI pole,Street light fitting and Supply and erection of LT cable other contingent item there on at Hero Honda road to Central Park road under limit of MCG. | - | - | - | - |
| 3 | Supply and erection of 2.5 sqmm 3 core unard FRLS PVC insulated ISI Marked copper conductor cable complete as per entire satisfication of engineer in charge.Make RR / Havells / Polycab/Grandley. 2.5 Sq. mm 3 Core Cable. | 400 | Metre | - | - |
| 4 | Providing trench less cuttting by Hydraulic Drilling Device boring/ Manual OR through some suitable alternate method with insertion of HDPE Pipe including supply, Delivery of HDPE pipe at work site and laying of 50mm internal diameter HDPE pipe inside road for road corssing of cable by Hydraulic Drilling Device without opening of the road top surface, laid at a depth of at least 900mm below the road surface from the feeding point to the feeder pillar box in median (OR) from feeder pillar to respective street light pole including cost of all accessories for road crossing for laying of cables.. | 100 | Metre | - | - |
| 5 | Operation and Maintenance of 1and2 year free of cost | 1 | Each | - | - |
| 6 | Supply and erection of Sword type single Arm GI bracket with Big Ball on top and small Ball Complete in all respect including nut and bolts required for installation with suitable size of GI pole. | 36 | Each | - | - |
| 7 | Instatllation of Dismantled old pole including the cost of labour and transportation (store to site) required to complete the job in all respect upto the entire satisfaction of engineer-in-charge of the work. | 36 | Each | - | - |
| 8 | Erection Testing and commissioning of Three phase CCMS panel petty material required for installation of ccms panel i.e clamp,nut and bolts,thimble ,wire etc complete in all material required for installation on PCC pole or Pedstal. complete in all material required for installation on PCC pole or Pedstal. | 1 | Each | - | - |
| 9 | Providing and fixing of 4G/5G Sim Card and recharse fees per month for street lights CCMS panel Compelte in all respect required for proper operation of CCMS panel. 500 Nos x 60 | 48 | Each | - | - |
| 10 | Operation and Maintenance of 3rd Year @ 6% of Capital Cost.... | 1 | Each | - | - |
| 11 | Operation and Maintenance of 4th Year @ 7% of Capital Cost..... | 1 | Each | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_602043.xls
BOQ • 0.27 MB
AD0162932.pdf
Additional Documents • 0.97 MB
OT0162932.pdf
Other Document • 0.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .