Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.2 LAccepted-Finance | ₹36.2 L | L1 | Accepted-Finance L1 |
| 2 | L2₹41.6 LAccepted-Finance | ₹41.6 L | L2 | Accepted-Finance L2 |
| 3 | L3₹42.0 LAccepted-Finance | ₹42.0 L | L3 | Accepted-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Schedule IInd to VIth not uploaded, bank certificate affidavit regarding annexure Ist, macihanry and equipment own or own lease not uploaded with bid |
Tender Value
₹44.3 L
EMD Value
₹88,640
Closing Date
11 May 2026, 12:00 pmClosed
DCF Udaipur
Van Bhawan Parisar Chetak Circle Udaipur
MJSA2.0 Construction of 5 Anicut and WHS
2026_FORES_554723_1
01/2026-27
Open Tender
Civil Works
Range Ogana
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Secretary, RREIS
₹88,640
Yes
19 May 2026
28 Apr 2026
11 May 2026
28 Apr 2026
11 May 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | 10 से 15 सेभी. गहयाई का डागफेलरिंग कामय (जीकेएन 2025 आईटभ निं. 6 डी) | 527 | Nos | 2.56 | ₹1,349.12 |
| 1.02 | जंगल की सफाई | 2,688.76 | Nos | 2.86 | ₹7,689.85 |
| 1.03 | जे.सी.फी भशीन / ट्रैक्टय भम स्रेऩय द्वाया लभट्टी खुदाई कामय खोदी गई लभट्टी को 15 सेभी ऩयत भें दफाना एविं फण्ड का सेक्शन (काट ऺेत्रपर भें) / प्रोपाईर सिंधारयत कयना भम चढाना एविं उतायना प्रायलबक रीड 250 भीटय एविं लरफ्ट 3 भीटय तक
(अ) सख्त लभट्टी चचकनी लभट्टी (जीकेएन 2025 आईटभ निं. 196 फी ऩेज निं. | 211.15 | Nos | 68.52 | ₹14,468 |
| 1.04 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de- watering wherever required complete in all respect. BSR WRD 2023, CHAPTER 5TH item no. (2)
(II) Disintigrated or soft rock or compacted murrum (%) BSR WRD 2023, item no 2(a), chapter 5th | 422.29 | Nos | 161 | ₹67,988.69 |
| 1.05 | Hard rock requiring blasting (%) BSR WRD 2023, item no 2(b), chapter 5th | 422.29 | Nos | 242 | ₹1,02,194.18 |
| 1.06 | 1:4:8 वाईब्रटर व मिक्सर का उपयोग नही करने पर 3 प्रतिशत की कटोती की जावेगी। | 145.28 | Nos | 4,250.95 | ₹6,17,578.02 |
| 1.07 | 15 सेमी मोटाई के पत्थर का खरंजा | 190.8 | Nos | 495.01 | ₹94,447.91 |
| 1.08 | एनीकट हेतु पत्थर की चिनाई सीमेंट-बजरी मसाले में। | 612.62 | Nos | 3,298.22 | ₹20,20,555.54 |
| 1.09 | एनीकट हेतु पत्थर की चिनाई सीमेंट-बजरी मसाले में। | 313.49 | Nos | 3,298.22 | ₹10,33,958.99 |
| 1.1 | सीमेंट कंक्रीट 1 सीमेंट : 2 बजरी : 4 पत्थर एग्रीगेट अनुपात में 12 मिमी नामीय माप की एग्रीगेट के साथ डालना,कूटना तथा तराई आदि सहित । | 39.44 | Nos | 5,161.2 | ₹2,03,557.73 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_987985.xls
BOQ • 0.39 MB
bid.pdf
Tender Documents • 7.36 MB
Download all tender documents and submit your bid