Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.5 LAdmitted-Finance | -25.00% | ₹5.5 L | L1 | Admitted-Finance |
| 2 | L2₹5.9 L+₹43,973.36 (8.01%)Admitted-Finance GROUND FLOOR NEAR 50 FEET ROAD KRISHNA NAGAR GAMRI 7B DARA KALAN KURUKSHETRA | KURUKSHETRA | KURUKSHETRA | HARYANA | -18.99% | ₹5.9 L+₹43,973.36 (8.01%) | L2 | Admitted-Finance |
| 3 | L3₹6.9 L+₹1.4 L (25.6%)Admitted-Finance MAIN STREET MAIN STREET GONDER 35 132024 | GONDER | KARNAL | HARYANA | 132024 | -5.77% | ₹6.9 L+₹1.4 L (25.6%) | L3 | Admitted-Finance |
| 4 | L4₹7.2 L+₹1.8 L (32.0%)Admitted-Finance BALTANA HOUSE NO 202 HARMILAP NAGAR PHASE 1 SAS NAGAR PUNJAB 140604 | SAS NAGAR | SAS NAGAR | PUNJAB | 140604 | -1.00% | ₹7.2 L+₹1.8 L (32.0%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹7.3 L
EMD Value
₹14,650
Closing Date
7 Aug 2026, 10:00 amClosed
Arvind
DIV 2 Panchkula
Providing and fixing of MS pipe 300 mm id, MS Flanges 300mm, cement concrete block size 1.0mx1.0mx1.0m, hiring of hydra, JCB and genset at Sector 29, PKUC near Shiv Mandir complete in all respect and all other works contingent thereto (A/mtc o
2026_HBC_537635_1
20261FC68A75 D6C7 4268 919A 63BC60BF8F8B270HSV
Open Tender
Civil Works
Works
60 days
Panchkula
2 documents required · 2 mandatory
₹500
₹14,650
Yes
21 Aug 2026
30 Jul 2026
7 Aug 2026
30 Jul 2026
7 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [1.PM015] PM015. Hire and running charges of light crane | 12 | Per day | 7,323 | ₹87,876 |
| 2 | [1.PM124] PM124. Generator 250 KVA | 25 | Hours | 3,215 | ₹80,375 |
| 3 | [13.45]Welding by gas or electric plant including transportation of plant at site etc. complete. | 3,016.32 | cm | 3 | ₹9,048.96 |
| 4 | [2.RM113] RM113. Nuts and bolts | 80 | Kg. | 54 | ₹4,320 |
| 5 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil | 110 | cum | 78 | ₹8,580 |
| 6 | [6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | 8 | cum | 3,975 | ₹31,800 |
| 7 | [6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete | 32 | Sqm | 156 | ₹4,992 |
| 8 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more | 87 | Kg. | 66 | ₹5,742 |
| 9 | Providing and fixing of MS Flange 300mm complete in the all respect and Entire satisfaction of EIC complete in all respect | 23 | Each | 1,932 | ₹44,436 |
| 10 | Providing and fixing of MS pipe 300mm complete in the all respect and Entire satisfaction of EIC complete in all respect | 100 | Metre | 4,545 | ₹4,54,500 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_616792.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .