| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-Finance | L1 | Accepted-Finance 1st Lowest Bidder | |
| 2 | L2₹1.5 L+₹13,635 (10.1%)Rejected-Finance | L2 | Rejected-Finance 2nd Lowest Bidder | |
| 3 | L3₹1.5 L+₹16,695 (12.4%)Rejected-Finance | L3 | Rejected-Finance 3rd Lowest Bidder | |
| 4 | L4₹1.5 L+₹19,625 (14.6%)Rejected-Finance | L4 | Rejected-Finance 4th Lowest Bidder |
Tender Value
₹1.5 L
EMD Value
₹2,000
Closing Date
13 Feb 2020, 6:00 pmClosed
SE, ETC, Gorakhpur
Office of Superintending Engineer, Electricity Transmission Circle, UPPTCL, 132KV S/S Mohaddipur Old, Gorakhpur
WORK OF TIGHTENING SAGGING OF CONDUCTOR OF LT LINE OF 132KV SUB-STATION MOHADDIPUR OLD UNDER ETD-I, GORAKHPUR
2020_UPTCL_426592_1
Short Term E-Tender No. 116-ETC(G)/2019-20
Open Tender
Electrical Works
Item Rate
90 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE, ETC, Gorakhpur
₹2,000
2 Mar 2020
23 Jan 2020
14 Feb 2020
23 Jan 2020
13 Feb 2020
23 Jan 2020
Amount
Tightening of loose Conductor of LT (0.4 KV) throughout Colony at 132 KV S/s Mohaddipur , Gorakhpur .
Opening and reconnecting of service mains connection .
Dismentaling of LT Line Conductor (all - 5 wire)
Stringing and Straightening of Tublar / Rail Pole of LT Line .
Providing and Fixing of bracket clamp in place of damage bracket clamp .
Providing and Fixing of Schukle insulator in place of damage insulator .
Stringing of LT Line conductor (all 5 wire) .
Providing of Phase spacer suitable for 440 V-3 phase 5 wire LT Line .
Spray Painting of tublar / Rail pole with one coat of Red Oxide primer and two coat of standard make light gray / Aluminium 608-4 synthetic enamel paint 1st quality after cleaning the rust and dust surface including cost of all materials , labour and T&P as per technical specification .
Cutting of tree branches and other unwanted tree near 1.5 Meter to the line and making the clearness between line and tree.
Tightening of loose Conductor of LT (0.4 KV) throughout Colony at 132 KV S/s Shatrughanpur , Gorakhpur .
Opening and reconnecting of service mains connection .
Dismentaling of LT Line Conductor (all - 5 wire)
Stringing and Straightening of Tublar / Rail Pole of LT Line .
Providing and Fixing of bracket clamp in place of damage bracket clamp .
Providing and Fixing of Schukle insulator in place of damage insulator .
Stringing of LT Line conductor (all 5 wire) .
Providing of Phase spacer suitable for 440 V-3 phase 5 wire LT Line .
Spray Painting of tublar / Rail pole with one coat of Red Oxide primer and two coat of standard make light gray / Aluminium 608-4 synthetic enamel paint 1st quality after cleaning the rust and dust surface including cost of all materials , labour and T&P as per technical specification .
Cutting of tree branches and other unwanted tree near 1.5 Meter to the line and making the clearness between line and tree.
Harshit Enterprises
Sri Balaji Associates
V.P.Associates
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .