Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC First Lowest |
| 2 | L2₹1.5 Cr+₹2.2 L (1.50%)Rejected-AOC | ₹1.5 Cr+₹2.2 L (1.50%) | L2 | Rejected-AOC Second Lowest |
| 3 | L3₹1.6 Cr+₹17.8 L (12.1%)Rejected-AOC | ₹1.6 Cr+₹17.8 L (12.1%) | L3 | Rejected-AOC Third Lowest |
| Sl No | Description | Qty | Unit | T.M. BUILDERS L3 | ASAN JAFFER ALI L2 | MJD BUILDERS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sites and raming of bottoms at the site, etc., complete complying with standard specification and as directed by the departmental officers.
a. for Footing Depth upto 2.40m | 693 | m3 | 380.91 ₹2,63,970.63 | 379 ₹2,62,647 | 373 ₹2,58,489 Lowest |
| 2.00 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.
A). Upto 2.40m Depth. | 17 | m3 | 204.07 ₹3,469.19 | 203 ₹3,451 | 200 ₹3,400 Lowest |
| 3.00 | Supplying and filling of Cement & Wet Mix Mecadam 1:10 for foundation and basement to stabilize the soil . The Cement Wet Mix is laid in 15 cm Layers for 30 cm depth followed by thoroughly mechanically ramming using plate vibrators. | 81.5 | m3 | 3,257.89 ₹2,65,518.04 | 3,242 ₹2,64,223 | 3,194 ₹2,60,311 Lowest |
| 4.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 159 | m3 | 436.13 ₹69,344.67 | 434 ₹69,006 | 428 ₹68,052 Lowest |
| 5.00 | Supplying and filling in foundation, basement, etc with conveyed earth in layers of not more than 150mm thick layers well watered, rammed with surface vibrator and consolidated including conveyance charges etc. complete complying with standard specification and as directed by the departmental officers. | 83 | Cum | 550.08 ₹45,656.64 | 547 ₹45,401 | 539 ₹44,737 Lowest |
| 6.00 | Supplying and filling in foundation, basement, etc with filling stone dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 59 | m3 | 328.78 ₹19,398.02 | 327 ₹19,293 | 322 ₹18,998 Lowest |
| 7.00 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 11 | m3 | 1,892.93 ₹20,822.23 | 1,883 ₹20,713 | 1,856 ₹20,416 Lowest |
| 8.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 35 | m3 | 5,651.7 ₹1,97,809.5 | 5,624 ₹1,96,840 | 5,541 ₹1,93,935 Lowest |
| 9.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for flooring including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 43.5 | m3 | 5,651.7 ₹2,45,848.95 | 5,625 ₹2,44,687.5 | 5,542 ₹2,41,077 Lowest |
| 10.00Brick work in Cement Mortar 1: 5 (One cement and five crushed stone sand) using best quality Burnt Clay Brick of size 8 3/4" x 4 1/4" x 2 3/4" with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | ||||||
Tender Value
₹1.5 Cr
EMD Value
₹82,700
Closing Date
4 Mar 2026, 3:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer, PWD., Buildings Construction and Maintenance Circle, Tirunelveli
Upgradation of Gunapadam Department Laboratory building for Government Siddha College in the Campus of Gents Hostel at Vannarpettai in Tirunelveli District.
2026_PWD_667064_1
41(2) SE/2025-26 dated 23.02.2026
Open Tender
Civil Works - Buildings
Lump-sum
150 days
Tirunelveli vannarpettai
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹82,700
3 Jul 2026
26 Feb 2026
5 Mar 2026
26 Feb 2026
4 Mar 2026
26 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sites and raming of bottoms at the site, etc., complete complying with standard specification and as directed by the departmental officers.
a. for Footing Depth upto 2.40m | 693 | m3 | 369.82 | ₹2,56,285.26 |
| 2 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.
A). Upto 2.40m Depth. | 17 | m3 | 198.13 | ₹3,368.21 |
| 3 | Supplying and filling of Cement & Wet Mix Mecadam 1:10 for foundation and basement to stabilize the soil . The Cement Wet Mix is laid in 15 cm Layers for 30 cm depth followed by thoroughly mechanically ramming using plate vibrators. | - | m3 | 3,163 | - |
| 4 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | - | m3 | 423.43 | - |
| 5 | Supplying and filling in foundation, basement, etc with conveyed earth in layers of not more than 150mm thick layers well watered, rammed with surface vibrator and consolidated including conveyance charges etc. complete complying with standard specification and as directed by the departmental officers. | - | Cum | 534.06 | - |
| 6 | Supplying and filling in foundation, basement, etc with filling stone dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 59 | m3 | 319.2 | ₹18,832.8 |
| 7 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 11 | m3 | 1,837.8 | ₹20,215.8 |
| 8 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 35 | m3 | 5,487.09 | ₹1,92,048.15 |
| 9 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for flooring including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 43.5 | m3 | 5,487.09 | ₹2,38,688.42 |
| 10Brick work in Cement Mortar 1: 5 (One cement and five crushed stone sand) using best quality Burnt Clay Brick of size 8 3/4" x 4 1/4" x 2 3/4" with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_801341.xls
BOQ • 0.38 MB
tenderconditionwithplan.pdf
Tender Documents • 1.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .