Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC | ₹9.9 L | L1 | Accepted-AOC Aoc issue |
| 2 | L2₹10.0 L+₹4,975.99 (0.50%)Rejected-Finance | ₹10.0 L+₹4,975.99 (0.50%) | L2 | Rejected-Finance L2 Bidder |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance NOT AVAILABLE | FARIDABAD | HARYANA | 121004 | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹10.0 L
EMD Value
₹99,520
Closing Date
25 Apr 2026, 3:00 pmClosed
Chief Engineer, KNN
Chief Engineer office, KNN, Motijheel
Beautification of Parashuram Vatika chauraha (near palika stadium) in ward-15 McRobertganj zone-4.
2026_NNKAN_1139793_1
892/AA-4/25-26
Open Tender
Civil Works
Percentage
45 days
ward-15 McRobertganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹99,520
17 Jun 2026
21 Apr 2026
25 Apr 2026
21 Apr 2026
25 Apr 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of cement concrete or brick or granolithic floors including base concrete and including stacking of materials as directed by engg. i/c. within a distance of 60mtr. | - | sqm | - | - |
| 2 | Dismentaling of B.O.E. soling/interlocking tiles including stacking of sevicable material and disposal of unsevicable material within a lead of 50m as per deirection of EI/C (Labour only) | - | sqm | - | - |
| 3 | Providing and laying in position cement concrete of specified grade 1:4:8 (1 cement: 4 coarse sand (zone-III): 8 graded stone aggregate 40 mm nominal | - | cum | - | - |
| 4 | Reinforced cement concrete work in beam, suspended floors, roofs having slope up to 15" landing, bolconies, shelves, chajjas, lintels , bands, plain, window sills, stair | - | cum | - | - |
| 5 | Centering & shuttering including strutting, propping, suspanded, floors, roofs, landing, balconies etc all com. | - | sqm | - | - |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all completeupto plinth level. | - | kg | - | - |
| 7 | Brick work with common burnt clay (non modular) bricks of class-150 in foundation and plinth in cement mortar 1:4 (1 cement: 4 | - | cum | - | - |
| 8 | 12mm cement plaster of mix: (1 cement: 4 coarse sand) | - | sqm | - | - |
| 9 | Kota stone slab flooring over 1 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of slab, including rubbing and polishing complete with base | - | sqm | - | - |
| 10 | Providing and laying in position cement cocrete of specified grade excluding the cost of centering and shuttering - All work up to the plinth level in 1:1.5:3 (1 cement: 1.5 coarse sand (zone-iii): 3 graded stone | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2128273.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.23 MB
BOQ_2128273.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .