| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance B 3 NEW COLONY KHATIPURA JHOTWARA JAIPUR 302012 | JAIPUR | RAJASTHAN | 302012 | -36.11% | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 CrAdmitted-Finance | -27.99% | ₹1.4 Cr | L2 | Admitted-Finance |
Tender Value
₹1.9 Cr
EMD Value
₹3.8 L
Closing Date
11 May 2026, 6:00 pmClosed
EE 14
JDA Jaipur
Patch repair works in zone 14 area, JDA Jaipur for the year 2026-27 (Under ARC)
2026_JDAJP_555493_1
EE-14/02/2026-27
Open Tender
Civil Works
365 days
EE 14 Area
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Online (JDA Portal)
₹3.8 L
Yes
15 May 2026
2 May 2026
15 May 2026
2 May 2026
11 May 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in Cutting in Soil
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | - | Cum | 31 | - |
| 2 | Carriage of material from quarry/crusher to work site including loading, unloading and stacking all complete. Earth, Sand, Lime, Morrum manure or sludge with all lead and lift. | - | Cum | 79.55 | - |
| 3 | Granular Sub-base with Well Graded Material (Table 400.1)
By Mix in Place Method
Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRD Specification Clause 401.
For Grading I Material | - | Cum | 512 | - |
| 4 | Granular Sub-base with Well Graded Material (Table 400.1)
By Mix in Place Method
Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRD Specification Clause 401.
For Grading II Material | - | Cum | 482 | - |
| 5 | Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and MoRD Specification Clause 406. By
Mechanical Means with 1 km lead | - | Cum | 1,147 | - |
| 6 | Prime Coat
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 | - | Sqm | 31 | - |
| 7 | Tack Coat
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per MoRTH Specification Clause 503. | - | Sqm | 9.6 | - |
| 8 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MoRTH Specification Clause 503. | - | Sqm | 11 | - |
| 9 | Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tones per hour using crushed aggregates of specified grading, premixed with bituminous binder minimum @ 4.0 & 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH Specifications Clause 505 complete in all respects. Bitumen (VG-30).
Grading - II (26.50 mm (Nominal Size)) | - | P.MT | 2,969 | - |
| 10 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder minimum @ 5.2 & 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH Specifications Clause 507 complete in all respects for Grading-II(13 mm nominal size) Bitumen (VG-30) | - | P.MT | 3,360 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
Doc2PatchARCEE14.pdf
Tender Documents • 3.82 MB
BOQ_989198.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid