Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.7 LAccepted-AOC | L1 | Accepted-AOC Low Rate | |
| 2 | L2₹63.7 L+₹9.0 L (16.5%)Rejected-Finance | L2 | Rejected-Finance High Rate | |
| 3 | L3₹64.2 L+₹9.5 L (17.4%)Rejected-Finance | L3 | Rejected-Finance High Rate | |
| 4 | Rejected-Technical | - | Rejected-Technical Non-responsive |
Tender Value
Refer Docs
EMD Value
₹5.4 L
Closing Date
25 Nov 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE, Kanpur Circle, PWD, Kanpur
SE, Kanpur Circle, PWD, Kanpur
Construction work of Fatehpur Roshnai to Mahadeva Kuti Road (Including 05 year maintenance)
2025_CEKNP_1092010_1
6110C/131C-KV/2025 Dt. 06.11.2025
Open Tender
Civil Works - Roads
Percentage
120 days
Kanpur Dehat
Please refer tender documents
2 documents required · 2 mandatory
₹3,635
₹5.4 L
Yes
SE, Kanpur Circle, PWD, Kanpur
11 Feb 2026
19 Nov 2025
25 Nov 2025
19 Nov 2025
25 Nov 2025
19 Nov 2025
21 Nov 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with all lifts upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1 and 300.2 with lead up to 1000m as per technical specification clause 301.5 | 4,340 | cum | 88 | ₹3,81,920 |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density as per MORD specification 401 | 723 | cum | 3,020 | ₹21,83,460 |
| 3 | Providing, laying and spreading material on a prepared base, cement @ 4%by weight to the spread material manually, mix in place with Rotavator and compacting with the Road Roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. | 585 | cum | 3,800 | ₹22,23,000 |
| 4 | Tack Coat (i) Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.Clause 503. MORD | 4,875 | sqm | 17 | ₹82,875 |
| 5 | 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508.
Case - II By Mechanical Means(HMP 30/40) (I) Bitumen VG-10 | 4,875 | sqm | 165 | ₹8,04,375 |
| 6 | Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Case - III : Type C By Mechanical Means(HMP 30/40) (I) Bitumen VG-10 | 4,875 | sqm | 55 | ₹2,68,125 |
| 7 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.. | 1,890 | cum | 78 | ₹1,47,420 |
| 8 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 26 | cum | 20 | ₹520 |
| 9 | Providing concrete (1:3:6) for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. (MORD Ch.11 Ref.800-1200) | 4.5 | cum | 5,900 | ₹26,550 |
| 10 | Brick masonry work (1 cement : 4 coarse sand) cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 (MORD Ch.11 Ref.12-600-1200) | 12 | cum | 6,650 | ₹79,800 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_2006341.xls
BOQ • 0.33 MB
T2of6110Road2.pdf
Tender Documents • 1.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .