Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAccepted-AOC | L1 | Accepted-AOC lowest amount quoted | |
| 2 | L2₹12.8 L+₹97,927.39 (8.28%)Rejected-Finance | L2 | Rejected-Finance Lowest amount quoted by L1 | |
| 3 | L3₹12.9 L+₹1.0 L (8.68%)Rejected-Finance | L3 | Rejected-Finance Lowest amount quoted by L1 | |
| 4 | L4₹12.9 L+₹1.1 L (8.98%)Rejected-Finance | L4 | Rejected-Finance Lowest amount quoted by L1 | |
| 5 | L5₹13.6 L+₹1.8 L (15.2%)Rejected-Finance SATARA JILA SATARA 415002 | SATARA | MAHARASHTRA | 415002 | L5 | Rejected-Finance Lowest amount quoted by L1 |
Tender Value
₹17.6 L
EMD Value
₹17,620
Closing Date
9 Nov 2023, 4:00 pmClosed
City Engineer
City Engineer
Proposed Patch work on Existing Bituminous Road from Aman Hotel to MajrewadiZillaParishad School
2023_SMC_959289_1
CW/CE/77/2023-24
Open Tender
Civil Works
Percentage
30 days
Solapur
Refer Tender Document
3 documents required · 3 mandatory
₹600
₹17,620
8 Jan 2024
2 Nov 2023
10 Nov 2023
2 Nov 2023
9 Nov 2023
2 Nov 2023
eProcurement System Government of Maharashtra Created By: Laxman Chalwadi Created Date/Time: 07-Dec-2023 02:42 PM Tender Title: Proposed Patch work on Existing Bituminous Road from Aman Hotel to MajrewadiZillaParishad School Tender ID: 2023_SMC_959289_1
Tender Inviting Authority: City Engineer,SMC
Name of Work: Proposed Patch work on Existing Bituminous Road from Aman Hotel to MajrewadiZillaParishad School
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 yash construction(GSTN-27AJWPK6662M1Z7) 1761284.000 -14.800 1500613.968 Fifteen Lakh Six Hundred and Thirteen
2.00 GOVINDRAJ CONSTRUCTION(GSTN-27AQWPP9067A1Z8) 1761284.000 -2.990 1708621.608 Seventeen Lakh Eight Thousand Six Hundred and Twenty One
3.00 Pankaj Dilip Pawar(GSTN-27CVHPP0557R1ZR) 1761284.000 -3.999 1690850.253 Sixteen Lakh Ninty Thousand Eight Hundred and Fifty
4.00 VIRAKSHI CONSTRUCTION(GSTN-27AIOPM9206A1ZA) 1761284.000 2.700 1808838.668 Eighteen Lakh Eight Thousand Eight Hundred and Thirty Eight
5.00 DHARMRAJ CONSTRUCTIONS(GSTN-NA) 1761284.000 -27.270 1280981.853 Tweleve Lakh Eighty Thousand Nine Hundred and Eighty One
6.00 JMD CONSTRUCTION(GSTN-NA) 1761284.000 -15.650 1485643.054 Fourteen Lakh Eighty Five Thousand Six Hundred and Fourty Three
7.00 Abrar Iftekhar Ahmed Belif(GSTN-NA) 1761284.000 -32.830 1183054.463 Eleven Lakh Eighty Three Thousand Fifty Four
8.00 Ganesh Bharat Narote(GSTN-NA) 1761284.000 -27.000 1285737.320 Tweleve Lakh Eighty Five Thousand Seven Hundred and Thirty Seven
9.00 SAGAR VIJAYKUMAR SHINGE(GSTN-NA) 1761284.000 -26.800 1289259.888 Tweleve Lakh Eighty Nine Thousand Two Hundred and Fifty Nine
10.00 CHOUDHARI MUQEEM A.RAZZAQUE(GSTN-NA) 1761284.000 -0.750 1748074.370 Seventeen Lakh Fourty Eight Thousand Seventy Four
11.00 Anushka Construction(GSTN-NA) 1761284.000 -22.600 1363233.816 Thirteen Lakh Sixty Three Thousand Two Hundred and Thirty Three
Lowest Amount Quoted BY: Abrar Iftekhar Ahmed Belif(1183054.463)
BOQ Summary Details Tender Title: Proposed Patch work on Existing Bituminous Road from Aman Hotel to MajrewadiZillaParishad School Tender ID: 2023_SMC_959289_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Abrar Iftekhar Ahmed Belif 1183054.463 L1
2 DHARMRAJ CONSTRUCTIONS 1280981.853 L2
3 Ganesh Bharat Narote 1285737.320 L3
4 SAGAR VIJAYKUMAR SHINGE 1289259.888 L4
5 Anushka Construction 1363233.816 L5
6 JMD CONSTRUCTION 1485643.054 L6
7 yash construction 1500613.968 L7
8 Pankaj Dilip Pawar 1690850.253 L8
9 GOVINDRAJ CONSTRUCTION 1708621.608 L9
10 CHOUDHARI MUQEEM A.RAZZAQUE 1748074.370 L10
11 VIRAKSHI CONSTRUCTION 1808838.668 L11
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .