| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.0 L
EMD Value
₹2,000
Closing Date
1 Aug 2022, 4:00 pmClosed
SE EDC-I RAEBARELI
SE EDC-I RAEBARELI
WORK MENTIONED IN BOQ
2022_MVVNL_716710_1
71/EDC-I,R/2022-23
Open Tender
Electrical Works
Item Wise
15 days
UNDER EDD-I RAEBARELI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EX ENGINEER C AND MC RAEBARELI
₹2,000
Yes
10 Aug 2022
23 Jul 2022
2 Aug 2022
23 Jul 2022
1 Aug 2022
23 Jul 2022
Amount
CARTAGE OF STORE ITEMS FORM ESC, RAEBARELI TO DUMP SITE AND DUMP SITE TO WORK SITE ALONG WITH LOADING, UN-LOADING AND PROPER STACKING
11 KV PILFER RESISTANCE METERING CUIBICAL WITH CABLE TERMINATION KIT Ctr. 10/5A
8.5 Mtr. Long PCC Pole
11 Mtr . Long ST Pole
loose line material including ACSR weasel conductor Mtr.125.00, ACSR Dog conductor Mtr.20.00, 11KV XLPE CABLE OF SIZE 3x70mm2 Mtr. 5.00, ABC 3X50MM2 200.00MM2 and other remaning items.
Cortage of following T/F
25KVA T/F
63KVA T/F
Errection
Errection of 8.5Mtr PCC Pole including digging of Pits & fitting of accessories.
Errection of D/P by 11 Mtr Long ST Pole including digging of Pits & fitting of accessories.
Errection of D/P by 8.5 Mtr Long PCC Pole including digging of Pits & fitting of accessories.
Grouting of Poles as per RESSPO norms with grouting materials.
Earthing of poles as per RESSPO norms.
Digging of pits, fixing nozzling & grouting of stay rods as per RESSPO norms including grouting materials.
Laying, stringing & sagging of 3Ø3wire 11 kv line by ACSR weasel conductor including all associated works & making clearance of road with joints/jumpers & binding on insulators as required as per RESSPO norms.
Mounting of 25 KVA transformer on D/P including all associated works as required.
Mounting of 63 KVA transformer on D/P including all associated works as required.
Laying of ABC of size 3x50mm. complete in all respect as per RESSPO norms
Cortage of receive back materila from work site to JE's store / ESC Tripula Raebareli.
Mounting/Installation of New 11 Pilfer Proof Metering Quibical Ratio 10/5A . Complete in all respect as per RESSPO norms.
Mounting of outdoor CT and PT Combined Unit on Pole (CTR. 10/5A)
Mounting/Errection of 11KV TPMO Set.Complete in all respect as per RESSPO norms
M/S SUBHASH TRADERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .