Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.5 LAccepted-Finance | ₹22.5 L | L1 | Accepted-Finance Qualified for Lottery |
| 2 | L1₹22.5 LAccepted-Finance | ₹22.5 L | L1 | Accepted-Finance Qualified for Lottery |
| 3 | L2₹23.8 L+₹1.3 L (5.55%)Rejected-Finance | ₹23.8 L+₹1.3 L (5.55%) | L2 | Rejected-Finance Qualified for Lottery |
| 4 | L3₹25.0 L+₹2.5 L (11.1%)Rejected-Finance | ₹25.0 L+₹2.5 L (11.1%) | L3 | Rejected-Finance Not Qualified for Lottery |
| 5 | L3₹25.0 L+₹2.5 L (11.1%)Rejected-Finance | ₹25.0 L+₹2.5 L (11.1%) | L3 | Rejected-Finance Not Qualified for Lottery |
Tender Value
₹25.0 L
EMD Value
₹25,011
Closing Date
28 Jul 2026, 5:00 pmClosed
PA, ITDA, Nilagiri
O/O- PA, ITDA, Nilagiri, Baleshwar
Const. of CC road at UN College Sora under Sora Block.
2026_STSCD_135722_4
ITDANGR-02/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
60 days
ITDA, Nilagiri
C and B
2 documents required · 2 mandatory
₹6,000
₹25,011
Yes
22 Sept 2026
14 Jul 2026
29 Jul 2026
14 Jul 2026
28 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil within 50m. initial lead & 1.5m. initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth & levelling the bed as per the direction of the Engineer-in-charge. | - | cum | - | - |
| 2 | Supplying, filling in foundation and plinth with sand,2 watered and rammed including cost, conveyance & royality and all taxces of materials cost of all labour with T & P etc completee. | 0.2 | cum | 1 | ₹0.2 |
| 3 | Cement concrete in (1:3:6) prop. by using 4cm size H.G.metal including cost, conveyance & royality etc. complete. | - | cum | - | - |
| 4 | Cement Concrete 1:2:4 with 12mm HG chips for CC road pavement | 0.2 | sqm | - | - |
| 5 | Fly Ash Brick work 1:6 mortar 10"x5"x3" | 1 | cum | - | - |
| 6 | Rigid and smooth centering & shuttering for RCC Work | 0.4 | sqm | - | - |
stage.html
html • 0.18 MB
tech_eval.pdf
fin_eval.pdf
finance_601380.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
BOQ_601380.xls
BOQ • 0.45 MB
4.pdf
Tender Documents • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .