Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.7 LAccepted-AOC | ₹5.7 L | 1 | Accepted-AOC AOC |
| 2 | 2₹5.8 L+₹5,087.87 (0.89%)Rejected-Finance JHEEL VPO JHEEL TEHSIL UCHANA JIND HARYANA 126116 | JHEEL | JIND | HARYANA | 126116 | ₹5.8 L+₹5,087.87 (0.89%) | 2 | Rejected-Finance Higher Rate |
| 3 | 3₹5.8 L+₹6,280.34 (1.10%)Rejected-Finance SHIVAM COMPLEX RATIA ROAD TOHANA 125120 | FATEHABAD | HARYANA | 125120 | ₹5.8 L+₹6,280.34 (1.10%) | 3 | Rejected-Finance Higher Rate |
| 4 | 4₹6.0 L+₹22,179.92 (3.87%)Rejected-Finance NA | PALWAL | HARYANA | 121004 | ₹6.0 L+₹22,179.92 (3.87%) | 4 | Rejected-Finance Higher Rate |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Technically Qualified |
Tender Value
₹7.9 L
EMD Value
₹15,899
Closing Date
24 Aug 2026, 3:00 pmClosed
Pankaj Kumar
Municipal Council Tohana
Construction of street From Damkora Road to H/O Jaspal Singh police in ward no. 20 MC Tohana
2026_HRY_541188_1
20264CABE51D C58D 494A AF7F 792B90771ECB274ULB
Open Tender
Civil Works
Works
180 days
Tohana
2 documents required · 2 mandatory
₹1,000
₹15,899
Yes
17 Sept 2026
17 Aug 2026
24 Aug 2026
17 Aug 2026
24 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.100.1]Cement Concrete 1:8:16 Flooring 1. Cement Concrete 1:8:16 with Over burnt (Jhama) Brick Aggregate: 90 mm to 40 mm size in foundation and plinth. [Through Rate] | - | cum | - | - |
| 2 | [10.7]Providing and laying of conglomerate floor 50mm thick cement concrete topping 1:2:4 [Through Rate] | - | Sqm | - | - |
| 3 | [11.11.2]12 mm cement plaster finished with a floating coat of neat cement of mix : 2. 1:4 (1 cement: 4 fine sand) [Through Rate] | - | Sqm | - | - |
| 4 | [17.23.1]Water Bound Macadam Grading - II 1. Water Bound Macadam (63mm to 45 mm) Grading I with screening Type “A” (13.2 mm aggregates) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate] | - | cum | - | - |
| 5 | [17.5.3]Compacting Original Ground 3. Compaction of Earthwork
Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [Through Rate] | - | Sqm | - | - |
| 6 | [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate] | - | Sqm | - | - |
| 7 | [17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate] | - | Sqm | - | - |
| 8 | [3.1.1]By Mechanical Transport including loading, unloading and stacking 1. Lime, moorum, building rubbish [5km] | - | cum | - | - |
| 9 | [4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate] | - | cum | - | - |
| 10 | [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate] | - | cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_620575.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .