| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC VILL P O AMJAI BARDHAMAN BARDHAMAN 713203 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713203 | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.9 L+₹16 (<0.01%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹3.0 L+₹8,645 (3.01%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹3.4 L
EMD Value
₹4,300
Closing Date
28 Jun 2024, 11:00 amClosed
AREA ENGINEER EnM, JHANJRA AREA
OFFICE OF THE GENERAL MANAGER, JHANJRA AREA, PO-LAUDOHA, BO, DIST. - PASCHIM BARDHAMAN, PIN-713385
Strengthening of 19XD Tandem belt conveyor by fabrication of fixed unit of loop take up, installing gear coupling, also strengthening of 65L belt conveyor by installation of discharge drum of 65L belt conveyor at 3n4 Incline, J.P.Colly.
2024_ECL_310644_1
ECL/GM/JNR/EnM/A2/24-25/37 dated 12.06.2024
Open Tender
Miscellaneous Works
Item Rate
30 days
JHANJRA UNDERGROUND
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,300
16 Sept 2024
17 Jun 2024
29 Jun 2024
17 Jun 2024
28 Jun 2024
18 Jun 2024
17 Jun 2024 - 24 Jun 2024
Amount
Necessary cleaning near drive head area of 19XD Tandem belt.
Dismantling-pulling of out of order gear coupling complete from gear box & drive drum shaft after removing of gear box.
Loading, transportation & unloading of complete gear coupling set(from surface), DA- oxygen cylinder(from 74BL/-9D), chain pulley block(from 74BL/-9D), mechanical puller from 11D/72L in R-VIIA seam to site partly manually and partly with help of haulages.
Fitting-hammering-grinding-filling of gear coupling complete on gear box & drive drum shaft.
fitting-alignment of gear box-drive drum-motor and trial run of the belt conveyor.
Transport of loop take up(fixed) drum, channels, angles, girders and plates of required size from surface to site at 19XD/46L by haulages and about 60 mtrs. Manually
Transport of drill panel, drill and drill cable from LHCM2 face by haulages and about 60 mtrs. Manually
Making nessecary arrangements for clamping two sides of belt(19XD(T)), loosening of tension of belt and pulling out of both fixed drum and pressure drum from fixed unit
Fabrication of channels, angles, plates and girders for replacing of worn out parts of loop take up (fixed)unit (ISMB-200 & 250 joist, ISMC-150 & 125 Channel, IAS-90*90*8 & 65*65*6 angle, Ms plate-20 mm thick) at site
Regrouting of loop take up unit after making nessecary holes
Placing of both fixed drum and pressure drum on fixed unit, lapping of belting, making of joint by mato fastener, removal of clamp from both sides, giving nessecary tension to belt and trial run
Transport of drill panel, drill and drill cable to LHCM2 face by haulages and about 60 mtrs.
Manually and transport of changed pressure drum to surface Transportation of 100mtr good conditioned 1000mm wide PVC belting from surface and placing this belting at 19XD belt.
Changing of 100m worn out belt at 19XD belt, proper tensioning, jointing of 19XD belt, removing two clamps from belting, test run of this 19XD belt & necessary checking- rectification.
Transport of one no 1000mm dischargedrum for changing in 65L belt
Changing of the damaged drum by replacing it with the transported drum
Supply of DA Cylinder
Supply of Oxygen Cylinder
Total impact of GST for the purpose of CTC
K R ENTERPRISE
N.K. ENTERPRISE
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .