Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75.4 LAccepted-AOC | L1 | Accepted-AOC lowest Accepted | |
| 2 | L2₹73.8 L+₹6.5 L (9.68%)Rejected-Finance H NO 859 SANTEMOL RAIA SALCETE GOA | SOUTH GOA | GOA | 403103 | L2 | Rejected-Finance Rejected | |
| 3 | L3₹75.4 L+₹8.0 L (12.0%)Rejected-Finance PARIMAL NEAR ST JOSEPH CONVENT AQUEM ALTO MARGAO GOA 403001 | MARGAO | SOUTH GOA | GOA | 403001 | L3 | Rejected-Finance Rejected | |
| 4 | Rejected-Technical GOA | - | Rejected-Technical invalid document |
Tender Value
₹94.2 L
EMD Value
₹1.9 L
Closing Date
15 Dec 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
SCD Dte of Agriculture Tonca Caranzalem Goa
Strenthening of bund Morator Palvant Pursho Lena at Deussua in Salcete Taluka
2021_DAG_1709_1
Tech/F16/SCD/DA/21-22/e-08/695
Open Tender
Civil Works
Item Rate
240 days
Deussua salcette
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,000
₹1.9 L
4 Apr 2022
1 Dec 2021
17 Dec 2021
1 Dec 2021
15 Dec 2021
1 Dec 2021
90 days
Amount
Clearing jungle including up rooting of rank vegetation grass bush wood trees and sapling of girth upto 30 cm. measured at a height of 1 m above ground level & removal of rubbish upto a distance of 50 mt. outside the periphery of the area cleared. (if however, only grass is met with the area will be measured and paid for under item 4001).
Earthwork in excavation by mechanical/manual means in all type of strata comprising any of the materials such as soil, silt, sand, clay, gravel, moorum of all varieties, shingles, pebbles, all type of conglamerates, laterite rock, soft rock, ordinary rock, disintegrated or weathered rock, fissureg/shattered, decomposed rock, and all such other materials either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted including of chiselling, wedging etc. but blasting prohibited in all conditions such as dry, moist, saturated, submerged, foul conditions etc. including pumping or bailing out water/dewatering, including setting out construction of shoring and stuffing and bracing, removal of stump and other deleterious matter, dressing of sides and bottom, providing barricading, danger lighting, guarding etc. backfilling the excavated earth to the extent required and disposing of surplus excavated soil/rock at specified areas with all leads and lifts etc. as per specification and drawing and as directed by the Engineer-in-charge etc. complete.
Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving:(a) Upto 2.50 metre long pile.
Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured) (a) Upto 2.50 metre long pile.
Centering and shuttering including struttings, propping etc. and removal of formwork for : (a) Foundations, footings, bases for columns and mass concrete.
Providing & laying cement concrete 1: 1.5: 3 (1 cement: 1.5 coarse sand: 3 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto plinth level.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: (a) All works upto plinth level.
Laterite bouldermasonry in cement concrete 1;3;6 (1 cement, 3 coarse sand: 6 graded stone aggregate of 20 mm nominal size) in foundation.
Earthwork in Embankment with approved earth (Contractor earth)/moorum including spreading the earth in layers not exceeding 250mm. in depth, breaking clods, rolling each layer with half ton roller or wooden or steel hammer including filling up ground depression, dressing etc. complete with all lead and lift and as directed by Engineer-in-Charge.
Providing woodwork in frames of doors, windows, clerestory windows trusses & other frames wrought framed and fixed in positon. (d) Second class matti wood.
Painting 2 coats with oil type wood preservative of approved brand & manufacture on new work.
Shri Sidharth R. Xette Bandekar
Paresh G. Kamat & Associates
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .