Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹5.3 L
EMD Value
₹10,640
Closing Date
21 Sept 2026, 6:00 pmClosed
ADPC SMSA PALI
ADARSH NAGAR, PALI
(5) Remanining work of Major Repair Work at Existing KGBV Hostel at KGBV Khetrali Block Bali
2026_RCSCE_597330_5
Nit 03 Civil 2026-27 District Level
Open Tender
Civil Works
Percentage
Pali
Please Refer Bid Document
7 documents required · 7 mandatory
₹1,000
Yes
ADPC SMSA PALI/ MD RISL PALI
₹10,640
Yes
3 Oct 2026
14 Sept 2026
22 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part A ( Building Work) Based on BSR PWD 2013 Circle pali
Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meters lead. | 21.02 | cum | 61 | ₹1,282.22 |
| 2 | Desmantling of floring with car including stacking of servceable material and diposal of unserviceable material with in 50 Mtr. Lead for Cement concrete flooring. | 163.25 | cum | 61 | ₹9,958.25 |
| 3 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster incl. disposal of rubbish to the dumping ground within 50mtr lead | 58.21 | cum | 9.11 | ₹530.29 |
| 4 | Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter.
All kinds of soils | 22.5 | cum | 138 | ₹3,105 |
| 5 | Providing and laying in position cement concrete including curing compaction etc. of specified grade excluding the cost of centering and shuttering =All up to plinth leve 1:4:8 (1Cement :4 Course Sand :8 Graded stone aggregate 40 mm nominal size | 24.84 | cum | 2,522 | ₹62,646.48 |
| 6 | Random Rubble stone masonary for foundation and plinth in Cement Sand Mortar above 30 Cm. thick wall in : Cement Mortar 1:6 (1-Cement:6-Sand). | 5.25 | cum | 2,649 | ₹13,907.25 |
| 7 | Brick masonary in foundation and plinth with bricks of class designation 75 mm in : Cement lime mortar 1:1:6 (1-Cement:1-lime putty:6-coarse sand) Add extra over item No. 5.1 for brick work in superstructure up to third storey. | 2.35 | cum | 3,457 | ₹8,123.95 |
| 8 | Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. 20 mm thick. | 114.81 | cum | 142 | ₹16,303.02 |
| 9 | Random rubble dry stone Kharanja under floor. | 20.37 | cum | 600 | ₹12,222 |
| 10 | Brick work in partition in super structure up to third storey 7 Cm. thick (brick on edges) using bricks of class designation 75 with nominal hoop rainforcement (2 Nos 6mm MS bar) at every fourth course in Cement mortar 1:4 (1-Cement:4-coarse sand). | 38.22 | cum | 366 | ₹13,988.52 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.97 MB
Tendernotice_2.pdf
PDF • 0.11 MB
Tendernotice_3.pdf
PDF • 0.53 MB
Tendernotice_4.pdf
PDF • 9.61 MB
BOQ_1059368.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .