Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical DOMJUR NEAR SITALA MANDIR GHOSHPARA FOKOR DOKAN DOMJUR HOWRAH 711405 | HOWRAH | WEST BENGAL | 711405 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical 3 1 120 ANANDA PALIT ROAD ADJACENT AREA IN WARD NO 55 | KOLKATA | WEST BENGAL | 700001 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹4.9 L
EMD Value
₹9,800
Closing Date
5 Aug 2026, 11:00 amClosed
EE(C),BR-II
79,BIDHAN SARANI
DEPLOYMENT OF HIRED LORRY FOR P.R WORKS/REMOVING ROAD SIDE RUBBISH/TRANSPORTATION OF ROAD REPAIRING MATERIALS ETC IN BR-II (DAY AND NIGHT) UNDER C.M.E ( C ) DEPTT.(FOR WARD NO-10,11,12,15,16)
2026_KMC_1034488_1
KMC/EEC/Br-II/PRO/1/26-27/3rd CALL
Open Tender
CIVIL WORKS
Item Rate
365 days
WARD-10 11 12 15 16
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹9,800
7 Aug 2026
28 Jul 2026
7 Aug 2026
28 Jul 2026
5 Aug 2026
28 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | Laying and Jointing PVC Pipe. Heading | - | - | - | - |
| 1.2 | COST FOR CARRYING HOT MIXTURE PER M.T(FOR A DISTANCE UPTO 1 K M)(FOR DAY SHIFT) | 0.18 | MT | 100 | ₹18.4 |
| 2.1 | COST FOR CARRYING HOT MIXTURE PER M.T(FOR A DISTANCE UPTO 1 K M)(FOR NIGHT SHIFT) | 0.18 | MT | 100 | ₹18.4 |
| 3.1 | COST FOR CARRYING HOT MIXTURE PER M.T(FOR A DISTANCE ABOVE 1&UPTO 3 K M)(FOR DAY SHIFT) | 0.18 | MT | 10 | ₹1.84 |
| 4 | COST FOR CARRYING HOT MIXTURE PER M.T(FOR A DISTANCE ABOVE 1&UPTO 3 K M)(FOR NIGHTN SHIFT | 0.18 | MT | 10 | ₹1.84 |
| 5 | COST FOR CARRYING HOT MIXTURE PER M.T(FOR A DISTANCE ABOVE 3&UPTO 6 K M)(FOR DAY SHIFT) | - | MT | 10 | - |
| 6 | COST FOR CARRYING HOT MIXTURE PER M.T(FOR A DISTANCE ABOVE 3&UPTO 6 K M)(FOR NIGHT SHIFT) | - | MT | 10 | - |
| 7 | COST FOR CARRYING HOT MIXTURE PER M.T(FOR A DISTANCE ABOVE 6&UPTO 20 K M)(FOR DAY SHIFT | - | MT | 10 | - |
| 8 | COST FOR CARRYING HOT MIXTURE PER M.T(FOR A DISTANCE ABOVE 6&UPTO 20 K M)(FOR NIGHT SHIFT) | - | MT | 10 | - |
| 9 | COST FOR CARRYING OTHER ROAD REPAIRING MATERIALS PER M.T(FOR A DISTANCE UPTO 1 K M)(FOR DAY SHIFT | - | MT | 10 | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
civil.pdf
Additional Documents • 4.88 MB
BOQ_2540902.xls
BOQ • 0.23 MB
form.pdf
Tender Documents • 0.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .