Tender Value
₹79.0 L
EMD Value
₹1.6 L
Closing Date
20 May 2026, 4:00 pmClosed
SE RED MEERUT CIRCLE MEERUT
Apar Ayukt Udhyog Campus Sooraj Kund Road Meerut
Pallavpuram Phase-I and Phase-2 ko jodne wali sadak par palhara chople se appu enclave tak road ka puneh nirman karya
2026_REDUP_1148084_5
17/SE/Tavrit/26-27/Dt-04-04-26
Open Tender
Civil Works - Roads
Percentage
180 days
Meerut
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹1.6 L
SE RED MEERUT CIRCLE MEERUT
27 Jul 2026
14 May 2026
21 May 2026
14 May 2026
20 May 2026
14 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | TACK COAT @ .25KG/SQM -- Providing and applying tack coat with Bitumen emulsion (VG-10) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 4,471.3 | Sqm | 14.44 | ₹64,565.57 |
| 2 | Dence Graded Bituminous Macadam (DBM)@4.5% -- Providing and laying dence grade bituminous macdanam with 100-120 TPH batch type hot mix plant producing an avreage output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituninous binder @ 4.0 to 4.5 % by weight of total mix and filler, transporting the hot mix to work site, laying with hydrostatic paver finisher with sensor control to the required grade level and alignment rolling with smooth wheeled vibratory and tendem rollers to achieve the desired compection as per Morth spefication clause No. 507. complete in all respects | 258.6 | Cum | 8,597.5 | ₹22,23,313.5 |
| 3 | TACK COAT @ .25KG/SQMP-- PProviding and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 4,471.3 | Cum | 14.44 | ₹64,565.57 |
| 4 | Bitumen Concrete @ 5.40 %--- Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an avreage output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituninous binder @ 5.4 to 5.6 % of mix an filler, transporting the hot mix to work site, laying with hydrostatic paver finisher with sensor control to the required grade level and alignment rolling with smooth wheeled vibratory and tendem rollers to achieve the desired compection as per Morth spefication clause No. 509. complete in all respects | 134.14 | CUM | 10,450.71 | ₹14,01,858.24 |
| 5 | Providing and laying of hot applied thermoplastic ---- compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. Rates are inclusive of all taxes, royalty, VAT etc. all T&P/machine material and labour required for proper completion of work (Excluding GST) As per SI.No. 7 | 165.9 | Sqm | 798 | ₹1,32,388.2 |
| 6 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 261.28 | Cum | 2,451 | ₹6,40,397.28 |
| 7 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. | 195.96 | Cum | 3,177.75 | ₹6,22,711.89 |
| 8 | M -150 Brick work in 1:4 (one cement and four course sand) mortar in Foundation and plinth including supply of all materials, labour, Tools & plants etc, required for proper completion workas per | 66.87 | Cum | 6,156 | ₹4,11,651.72 |
| 9 | 12 mm thick plaster with cement and coarse sand of 1.25 fineness modules in 1:4 over brick work minimum thickness not to be less then 1cm including supply of all materials, labour, Tools & plants etc, required for proper completion workas . As per clauses | 290.72 | Sqm | 172.14 | ₹50,044.54 |
| 10 | Cement Concrete with 2 cm gauge approved stone grit, C/Sand & Cement in the Proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc, required for proper completion workas as per S | 14.54 | Cum | 6,346 | ₹92,270.84 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.24 MB
BOQ_2148707.xls
BOQ • 0.29 MB
SE-SBD-15.pdf
Tender Documents • 6.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .