Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 CrAdmitted-Finance | -4.10% | ₹2.6 Cr | L1 | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.7 Cr
EMD Value
₹5.3 L
Closing Date
30 Oct 2025, 4:00 pmClosed
Executive Engineer
Executive Engineer PWD RnB Division Doda
Construction of Community Hall at Panjdhara Dachhan
2025_PWDJK_293005_1
e-NIT No.20 of 2025-26 dated 23-10-2025
Open Tender
Civil Works
Percentage
540 days
marwah
Construction of Community Hall at Panjdhara Dachhan
2 documents required · 2 mandatory
₹6,000
Superintending Engineer PWD RnB Circle Doda-Kishtw
₹5.3 L
Superintending Engineer PWD RnB Circle Doda-Kishtw
18 Nov 2025
23 Oct 2025
31 Oct 2025
24 Oct 2025
30 Oct 2025
24 Oct 2025
27 Oct 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | Civil Work | - | - | - | - |
| - | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge | - | - | - | - |
| - | All kinds of soil : 90% | 2,780.5 | Cum | 187.3 | ₹5,20,787.65 |
| - | Ordinary Rock : 10% | 308.94 | Cum | 392.8 | ₹1,21,351.63 |
| - | Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. All kind of soil : | 250.01 | Cum | 89.75 | ₹22,438.4 |
| - | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc in layers not exceeding 20cm in depth consolidating each deposited layer by ramming and watering, lead upto 50Mt & lift upto 1.50M. | 561.98 | Cum | 218.4 | ₹1,22,736.43 |
| - | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 102.55 | Cum | 416.5 | ₹42,712.08 |
| - | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm bed of dry brick ballast 40mm nominal size well rammed and consolidated and grouted with fine sand including finishing the top smooth and curing complete | 61.73 | Cum | 572.8 | ₹35,358.94 |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level | - | - | - | - |
| - | 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 33.06 | Cum | 6,591.25 | ₹2,17,906.73 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.82 MB
BOQ_946077.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .