| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹3.0 LAccepted-Finance 1 NO MOHISHILA COLONY DAKSHIN PARA ASANSOL 3 PASCHIM BARDHAMAN 713303 | PASCHIM BARDHAMAN | WEST BENGAL | 713303 | l1 | Accepted-Finance l1 | |
| 2 | l2₹3.0 L+₹4,466.58 (1.50%)Rejected-Finance GANRAPOTA BONGAON NORTH 24 PGS PIN 743251 | BONGAON | NORTH 24 PARGANAS | WEST BENGAL | 743251 | l2 | Rejected-Finance l2 | |
| 3 | l3₹3.0 L+₹6,104.33 (2.05%)Rejected-Finance | l3 | Rejected-Finance l3 |
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
24 Sept 2026, 12:00 pmClosed
EE C BR_VIII
172/5,R.B. AVE KOL-29
RESTORATION OF PAVER.BLOCK AND IPS FOOTPATH DISTURBED BY DIIFFERENT PU AGENCIES AND NATURAL WEAR AND TEAR AT 34/A, 50/1, PRATAPADITYA RD, 27/B, 37/1C, N.B 1ST LN, 200/S, 184A, S.P.M RD, 45C T.G RD, 9/F, P.PLACE ETC IN WD 088
2026_KMC_1041766_1
KMC/EEC/VIII/088/007/26-27/D
Open Tender
CIVIL WORKS
Percentage
60 days
IN WARD NO 88
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6,000
29 Sept 2026
15 Sept 2026
26 Sept 2026
15 Sept 2026
24 Sept 2026
15 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth up to 150 mm. | 351.99 | SQM | 14.4 | ₹5,068.66 |
| 2 | TAKING OUT AND RELAYING OF EXISTING INTERLOCKING PAVER BLOCK IN FOOTPATH OR PASSAGES ETC. OVER 20-40 MM TH. MEDIUM YELLOW SAND BED WITH TRUE TO LINE LEVELLING, PROPER COMPACTION WITH VIBRATOR ETC. WITH JOINING WITH KERB/EDGE TO BE MADE WITH CEMENT CONCRETE (1:2:4) ETC. AS PER THE DIRECTION OF THE ENGINEER IN CHARGE INCLUDING COST OF TAKING OUT AND USING 20% NEW SAND AND ALL MATERIALS, LABOUR ETC.COMPLETE | 351.9 | SQM | 108 | ₹38,005.42 |
| 3 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 351.84 | SQM | 24 | ₹8,444.16 |
| 4 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (b) For Medium Sand | 8.8 | M3 | 1,275.29 | ₹11,222.55 |
| 5 | ORDINARY CEMENT CONCRETE (MIX 1:3:6 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES. | 28.59 | M3 | 4,458 | ₹1,27,454.22 |
| 6 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 1.Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed. | 149 | SQM | 10 | ₹1,490 |
| 7 | Labour for laying single brick flat soling including ramming and dressing bed to proper level and filling joints with powdered earth. | 111.75 | SQM | 40 | ₹4,470 |
| 8 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( 3rd Corrigenda & addenda dated 04.06.2018) | 37.25 | SQM | 361 | ₹13,447.25 |
| 9 | 35mm thick Cement Concrete Pavement (1:2:4) in floor/footpath etc. with graded stone chips 11.2mm down,properly leveled with 3mm thick screen on top by cement slurry [email protected] cement per Sqm. Rounding off corners, chequering as required including taking necessary protective measure complete in Gr.floor/footpath. | 149 | SQM | 244 | ₹36,356 |
| 10 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone. ( Ref :Rate based on PWD Current SOR. [PWD(B)2017,p-303]) | 58 | MTR | 8.17 | ₹473.86 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.74 MB
BOQ_2557619.xls
BOQ • 0.35 MB
civil_oid_compressed.pdf
Additional Documents • 1.12 MB
TF.pdf
Tender Documents • 1.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .