Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-Finance | L1 | Accepted-Finance First Lowest quoted amount | |
| 2 | L2₹3.0 L+₹544.46 (0.18%)Accepted-Finance | L2 | Accepted-Finance Second Lowest quoted amount |
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
7 Mar 2025, 5:00 pmClosed
Commissioner, Madhuranthagam Municipality
Commissioner, Madhuranthagam Municipality
Contruction of Strom Water Drain and Pipe Line Arrangements to Ward No.03 Bhagavathsingh Street in Madhuranthagam Municipality
2025_MAWS_530676_1
368/2025/E1
Open Tender
Civil Works
Item Rate
Madhuranthagam Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,000
10 Mar 2025
7 Mar 2025
7 Mar 2025
7 Mar 2025
7 Mar 2025
7 Mar 2025
Amount
Labour charges for CC road cutting for pipe line laying as per the departmental instruction. As per standarded specification.
Earth work excavation for foundation, septic tank etc., in all soil sand sub- soils (vide SI No:50+62) and to full depth as may be directed except in hard rock requiring blasting inclusive of shoring, shuttering, bailing out water wherever necessary refilling the foundation with excavated earth other than sandy soil in layers of not more than 15 cm thick well rammed and depositing the surplus earth with in the compound in place shown by the departmental officers within an initial lead and lift and clearing and levelling the site etc.,complete - 1 M 3
Cement Concrete 1:4:8(One Cement,four sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
Supplying and errecting centering for plane surfaces such as RCC slab,beam etc.,including strutting upto 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm for boarding laid over country wood (silver Oak) joists of size 10cm X 6.5cm spaced at 90cm centres and supported by casurina props of size 10 - 13cm dia spaced at 75cm centres including necessary cross bracings\ etc., complete complying with standard specifications. - 10 m 2
Plain Cement concrete 1:2:4 (one cement three sand and six aggregate )using 20mm gauge machine broken hard granite stone jelly including cost and conveyence of all other matreials at work at site and all other labour charges for laying, finishing , curing etc., complete.
Plastering with cement mortar 1:4 (One Part of Cement and Four part of Plastering Sand (P- Sand)) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.
Supplying and delivery of following Un Plasticized PVC Pipes For Potable Water Supply As Per IS 4985 /2000 P.V.C. pipes with ISI marking including cost of all charges etc completed. 10 KSC
Supplying and delivery of following P.V.C. Specials with ISI marking including cost of all charges etc complete (as per 2022-2023) TWAD, as per IS 4985
Coupling
Elbow
Lowering PVC/ DWSC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste.
Refilling with excavated soil (other than sand) complying with the standard specification for filling in foundation and basement
Provision for GST 18%
S.Umashankar (BID ID -1265682)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_631764.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .