Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-Finance MOHALLA MEWALAL TALAB PURAB TOLA BALRAMPUR U P | JHANSI | UTTAR PRADESH | 284001 | L1 | Accepted-Finance L1 | |
| 2 | L2₹2.0 L+₹44,062.78 (28.3%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | M/S RAJ KISHORE SHUKLA CONTRACTOR L1 | M/S SHIV JI INTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00Construction work of total 06 No. of remaining outlets on Madanpur Mr. under Utraula Pump Canal system. | |||||
| 1.01 | Earth work in excavation in foundation including digging and refilling the trenches with all lead & lift including cost of labour, T&P for proper completion of work as directed by Engineer-in-charge and as per I.D. specification. | 54.35 | Cum | 45 ₹2,445.66 Lowest | 92.65 ₹5,035.34 |
| 1.02 | Providing and laying in proper position Plain Cement Concrete in 1:3:6 (1 cement: 3 Hamirpur coarse sand of FM not less then 2.0 : 6 kabrai graded stone aggregate 20 to 40 mm size) including cost of all material, labour, T&p etc for proper completion of work as directed by Engineer-in-charge and as per drawing and I.D. specification. | 4.63 | Cum | 8,000 ₹37,008 Lowest | 9,927.84 ₹45,926.19 |
| 1.03 | Providing and laying in proper position reinforced Cement Concrete in 1:1.5:3 (1 cement: 1.5 Hamirpur coarse sand of FM not less then 2.0 : 3 kabrai graded stone aggregate 10 to 20 mm size) including cost of all material, labour, T&p etc for proper completion of work as directed by Engineer-in-charge and as per drawing and I.D. specification. | 5.05 | Cum | 9,000 ₹45,495 Lowest | 10,800.52 ₹54,596.63 |
| 1.04 | Providing and laying Steel in Reinforcement including cost of steel, carriage, bending, cutting placing in position and binding with steel binding wire etc. including cost of all materials, labour and T&P with all leads and lift for proper completion of work as directed by Engineer-in-charge and per drawing and I.D. specification. | 0.18 | MT | 70,000 ₹12,600 Lowest | 74,730.15 ₹13,451.43 |
| 1.05 | Centering and shuttering for P.C.C and R.C.C. work including cost of all materials, labour and T&P etc. with all leads and lifts/down for proper completion of work and as directed by Engineer-in-Charge as per I.D. specification. | 68.62 | Sqm | 320 ₹21,958.08 Lowest | 449.75 ₹30,861.4 |
| 1.06 | Supply and fixing HDPE Kulawa Pipe 160mm dia as per letest IS specification PE-100 : 6kg/Sqcm. including labour, T&P etc. required for proper completion of work and as directed by Engineer-in-Charge as per I.D. specification. | 37.62 | Rm | 500 ₹18,810 Lowest | 680.02 ₹25,582.35 |
| 1.07 | Earth work filling including lead upto 30M & lift upto 1.5M, excluding mechanical compaction but including manual compaction and dressing to profile. For road/canal/flood embankment upto 1.5M height. | 146.4 | Cum | 120 ₹17,568 Lowest | 167.31 ₹24,494.18 |
Tender Value
₹2.2 L
EMD Value
₹4,440
Closing Date
18 Sept 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
office Executive Engineer Saryu Nahar Khand-3, Balrampur
Construction work of total 06 No. of remaining outlets on Madanpur Mr. under Utraula Pump Canal system.
2026_UPIDC_1184520_13
02/E.E./2026-27
Open Tender
Civil Works - Canal
Item Rate
Siddharthnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹767
₹4,440
Yes
27 Nov 2026
11 Sept 2026
18 Sept 2026
11 Sept 2026
18 Sept 2026
11 Sept 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction work of total 06 No. of remaining outlets on Madanpur Mr. under Utraula Pump Canal system. | |||||
| 1.01 | Earth work in excavation in foundation including digging and refilling the trenches with all lead & lift including cost of labour, T&P for proper completion of work as directed by Engineer-in-charge and as per I.D. specification. | 54.35 | Cum | - | - |
| 1.02 | Providing and laying in proper position Plain Cement Concrete in 1:3:6 (1 cement: 3 Hamirpur coarse sand of FM not less then 2.0 : 6 kabrai graded stone aggregate 20 to 40 mm size) including cost of all material, labour, T&p etc for proper completion of work as directed by Engineer-in-charge and as per drawing and I.D. specification. | 4.63 | Cum | - | - |
| 1.03 | Providing and laying in proper position reinforced Cement Concrete in 1:1.5:3 (1 cement: 1.5 Hamirpur coarse sand of FM not less then 2.0 : 3 kabrai graded stone aggregate 10 to 20 mm size) including cost of all material, labour, T&p etc for proper completion of work as directed by Engineer-in-charge and as per drawing and I.D. specification. | 5.06 | Cum | - | - |
| 1.04 | Providing and laying Steel in Reinforcement including cost of steel, carriage, bending, cutting placing in position and binding with steel binding wire etc. including cost of all materials, labour and T&P with all leads and lift for proper completion of work as directed by Engineer-in-charge and per drawing and I.D. specification. | 0.18 | MT | - | - |
| 1.05 | Centering and shuttering for P.C.C and R.C.C. work including cost of all materials, labour and T&P etc. with all leads and lifts/down for proper completion of work and as directed by Engineer-in-Charge as per I.D. specification. | 68.62 | Sqm | - | - |
| 1.06 | Supply and fixing HDPE Kulawa Pipe 160mm dia as per letest IS specification PE-100 : 6kg/Sqcm. including labour, T&P etc. required for proper completion of work and as directed by Engineer-in-Charge as per I.D. specification. | 37.62 | Rm | - | - |
| 1.07 | Earth work filling including lead upto 30M & lift upto 1.5M, excluding mechanical compaction but including manual compaction and dressing to profile. For road/canal/flood embankment upto 1.5M height. | 146.4 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.01 MB
BOQ_2228528.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .