| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-Finance AT JAYABADA WARD NO 08 P O P S DISTRICT JAGATSINGHPUR | PURI | ODISHA | 752120 | L1 | Accepted-Finance ok | |
| 2 | L2₹7.1 LSame as L1Accepted-Finance | L2 | Accepted-Finance ok | |
| 3 | Rejected-Technical | - | Rejected-Technical As per Proceeding | |
| 4 | Rejected-Technical AT WARD NO 21 P O JAGATSINGPUR DIST JAGATSINGPUR | JAGATSINGPUR | JAGATSINGPUR | ODISHA | - | Rejected-Technical As per Proceeding | |
| 5 | Rejected-Technical | - | Rejected-Technical As per Proceeding |
Tender Value
₹7.0 L
EMD Value
₹7,000
Closing Date
6 Jul 2026, 5:00 pmClosed
EXECUTIVE OFFICER JAGATSINGHPUR MUNICIPALITY
OFFICE OF THE JAGATSINGHPUR MUNICIPALITY
Construction of Bhagabat Ghara Community Center near Jagannath Temple at Ward No 09 of Jagatsinghpur Municipality
2026_ORULB_132780_14
JSPURM-EO-Tender-05/2026-27
Open Tender
Civil Works - Others
Percentage
120 days
Construction of Bhagabat Ghara Community Center ne
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
₹7,000
Yes
23 Oct 2026
25 Jun 2026
7 Jul 2026
25 Jun 2026
6 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in all kinds of soil including rough dressing and levelling the bed. | 14.84 | cum | 306.01 | ₹4,541.19 |
| 2 | Transporting the excavated materials by mechanical means with all cost, carriage etc, complete. (As per SOR 2022 Page No.163) | 14.84 | cum | 185.85 | ₹2,758.01 |
| 3 | Filling F&P with sand well watered and rammed. | 5.52 | cum | 524.26 | ₹2,893.92 |
| 4 | C:C: (1:3:6) using 4 cm. size H.G. C.B metal including the cost of all materials, labour carriage, royalty etc complete. | 5.15 | cum | 6,851.38 | ₹35,284.61 |
| 5 | R.C.C. work of M20 grade with 20 mm down grade chips (C.B.) including Hoisting & laying (Data for 15 cum) | 16.89 | cum | 6,938.45 | ₹1,17,190.42 |
| 6.1 | Rigid smooth centering and shuttering for R.C.C. works including false works and dismantlling them after casting including cost of materials complete in G.F. (ROOF SLAB) | 45.94 | sqm | 769.2 | ₹35,337.05 |
| 6.2 | Rigid smooth centering and shuttering for R.C.C. works including false works and dismantlling them after casting including cost of materials complete in G.F. (Foundation & Plinth) | 35.4 | sqm | 249.73 | ₹8,840.44 |
| 6.3 | Providing and fixing Centering and shuttering including strutting, propping etc. and removal of form the site after completion of respective work as the direction of engineer in charge. (Beam & Column) | 53.7 | sqm | 1,219.7 | ₹65,497.89 |
| 6.4 | Providing and fixing Centering and shuttering including strutting, propping etc. and removal of form the site after completion of respective work as the direction of engineer in charge. (Lintels) | 10.8 | sqm | 577.75 | ₹6,239.7 |
| 7 | Labour charges for cutting, bending, binding and tying the grill including the cost of M.S. rod. | 14.75 | qntl | 8,901.27 | ₹1,31,293.73 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
finance_597754.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.47 MB
BOQ_597754.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .