Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.4 L+₹12,402.04 (9.61%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
9 Oct 2026, 4:00 pmClosed
xenrew kathua
xenrewkathua
Constt of t/road from Ropul to Upper Kalna via School Hospital W.No.07, Pyt. Dhanu Parole Block Duggain
2026_RDPR_326903_1
e-NIT No.252/REW/K of 2026-27 Dated 03/10/2026 3rd call
Open Tender
Civil Works
Percentage
90 days
Duggain
sbd
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹4,000
15 Oct 2026
3 Oct 2026
10 Oct 2026
3 Oct 2026
9 Oct 2026
3 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | |||||
| 1.1 | All kind of soil 80% | 357 | Cum | 187.3 | ₹66,866.1 |
| 1.2 | Ordinary rock 10% | 44.63 | Cum | 392.8 | ₹17,530.66 |
| 1.3 | Hard rock 10% | 44.63 | Cum | 1,128.75 | ₹50,376.11 |
| 2 | Providing and laying in position dry stone aggregarte. All work upto plinth level with(stone aggregate of 40mm nominal size ) including spreading, compacting, and consolidation in all respect | 4.5 | Cum | 1,700 | ₹7,650 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 30% boulder | 10.15 | Cum | 4,294.9 | ₹43,593.24 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 8 | Cum | 286.35 | ₹2,290.8 |
| 5 | Carriage of Sand and Bajri Avg. distance 25.0 Km by M.T | 16 | Cum | 465.14 | ₹7,442.24 |
| 6 | Carriage of Stone Avg. distance 15.0 Km by M.T | 2 | Cum | 405.31 | ₹810.62 |
| 7 | Carriage of Cement Avg. distance 10.0 Km by M.T | 2 | M.T | 236.58 | ₹473.16 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.93 MB
BOQ_1105783.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .