Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6,999Accepted-AOC | L1 | Accepted-AOC L1 bidder is quoted his rates very seriously unbalanced and not ready to do the work on his quoted rates, hence the EMD of the firm is forfeited and action taken as per approved DNIT. | |
| 2 | L2₹3.7 L+₹3.7 L (5221.4%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹49.5 L+₹49.4 L (70624.4%)Rejected-AOC 844 A 34 VIJAY NAGAR ROHTAK 124001 | ROHTAK | ROHTAK | HARYANA | 124001 | L3 | Rejected-AOC L3 | |
| 4 | L4₹5.5 L+₹5.4 L (7758.3%)Rejected-AOC MAIN HUDA MARKET PLOT NO 62 HOUSE NO 62 GROUND FLOOR MAIN HUDA MARKET SECTOR 10A 122001 | GURUGRAM | HARYANA | 122001 | L4 | Rejected-AOC L4 | |
| 5 | L5₹8 L+₹7.9 L (11330.2%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹11,320
Closing Date
9 Jan 2023, 5:00 pmClosed
ANKIT BHARDWAJ
Division FMDA
Detailed topographical and ground level survey of existing water supply pipelines from main boosting station to their respective SBS
2023_HRY_252417_1
202324D5B567 E1BC 48B1 AAEC B2C6ED9F6E561851002
Open Tender
Civil Works
Works
67 days
Faridabad (MC)
2 documents required · 2 mandatory
₹1,180
₹11,320
Yes
31 Jan 2023
3 Jan 2023
10 Jan 2023
3 Jan 2023
9 Jan 2023
3 Jan 2023
Amount
NS Item -Carryout detailed topography and ground survey of existing water pipeline along with following scope of works:- The scope of work includes:- 1. Complete survey and levels of ranneywells, MBS, IBS and the connecting pipeline at every 30 mtr. or at all burnt corner junctions etc. 2. The scope of work includes the topographical high precession DGPS survey and should include all the natural features, adjoining road levels, level of any drain, canal through which the pipe line passes and important land marks. 3. It includes the preparation of L section, Reduce level and bed level, top level of structure, pump chamber, all manholes, levels of suction and delivery pipe line, pumping machinery, levels of underground tanks, FSL etc. 4. Includes the preparation of drawings on Google Map, in AutoCAD to and other requirement as per the engineer in charge. 5. The L section and other detail as detail above should be prepared for each ranneywell line independently and also on a combined map. 6. It includes providing 5 sets of maps on A-Zero size, soft copy in AutoCAD, 5 sets each of independent pipe line. 7. The tentative length of all the 8 no. ranneywell lines is approx. 160 km and additional. However, the payment will be made as per, per km length area surveyed. 8. The scope of work includes the length of about 7 km from IBS Sector-45 upto Charmwood village.
Tayal Engineering
M/s Lakshay and Company
Manav Consultant and constructions
Ankush Consultant and Constructions
Jk Survey Associate
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .