Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 8 1 B DIAMOND HARBOUR ROAD KOLKATA 700027 | KOLKATA | KOLKATA | WEST BENGAL | 700027 | Admitted-Finance |
| 3 | Admitted-Finance PLOT NO 26 26 A ROZ KA MEO INDUSTRIAL AREA PHASE 1 SOHNA HARYANA GURGAON HARYANA 122103 | GURUGRAM | HARYANA | 122103 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
7 Dec 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
MRS. SANGITTA GHULIANI,SR.GM
EIL GURUGRAM HARYANA
COOLING TOWER AND CWTP (CT-1 AND 2) for Panipat Refinery Expansion Project
2021_REFHQ_141732_1
SG/B269-474-PB-T-8700/24
Open Tender
Lump Sum TurnKey
Works
600 days
AS PER TENDER DOCUMENT
Please refer Tender documents.
6 documents required · 6 mandatory
Exempted
Webex
31 Mar 2022
5 Oct 2021
8 Dec 2021
5 Oct 2021
7 Dec 2021
4 Nov 2021
19 Oct 2021
180 days
FORM-SP-0
PART-A: Total Lump-sum Price on trunkey basis for cooling towers CT-01 (7+1 Cells) and CT-II A PNCP Area (2 Cells) with each cell capacity 4000m3/hr & cooling water Treatment plant & its associated facilities on lumpsum trunkey basis with single point responsibility including but not limited to Project Management, Planning , Scheduling, Monitoring, design & detailed engineering, , Supply including -procurement services of all equipment/Materials, Third Party Inspection of all material required for fabrication and Transportation including chlorine-di-oxide and chemical dosing system for Cooling WAter Treatment Plant. This also includes Chemicals,consumables, , chlorine dioxide , lubricants etc required for commissioning, Trial Run, PGTRand for six months of operation after commissioning of Cooling Tower and Cooling Water Treatment plant. Supply of manpower for Monitoring , running and maintenance of Chemical dosing system and its associated facilities for six months and one month of trial run of cooling tower after commissioning . Supply of commissioning and mandatory spares, Providing training Owner's personnel, supply of special tools, tackles , consumables, arrangement of Third pary inspection, Transportation, , receipt , accounting, storing & Preservation of materials,including allother activities incidental to procurement and supply,construction(including excavation of Rock , if any), Fabrication, Erection, Installation, testing, Mechanical Completion, Precommissioning, Commissioning and conducting PGTR, Test Run, for complete cooling tower system(including CWTP) including any balance field engineering as per the provisions of Bidding document . Supply of all labour , amterials, tools& tackles, providing construction aids,and all safety devices for construction.all complete as per the bidding document direction of Engineer In Charge.
PART-B: Total Lump-sum Price on trunkey basis for cooling towers CT-02 (8+1 Cells) with each cell capacity 4000m3/hr & cooling water Treatment plant & its associated facilities on lumpsum trunkey basis with single point responsibility including but not limited to Project Management, Planning , Scheduling, Monitoring, design & detailed engineering, , Supply including -procurement services of all equipment/Materials, Third Party Inspection of all material required for fabrication and Transportation including chlorine-di-oxide and chemical dosing system for Cooling WAter Treatment Plant. This also includes Chemicals,consumables, , chlorine dioxide , lubricants etc required for commissioning, Trial Run, PGTRand for six months of operation after commissioning of Cooling Tower and Cooling Water Treatment plant. Supply of manpower for Monitoring , running and maintenance of Chemical dosing system and its associated facilities for six months and one month of trial run of cooling tower after commissioning . Supply of commissioning and mandatory spares, Providing training Owner's personnel, supply of special tools, tackles , consumables, arrangement of Third pary inspection, Transportation, , receipt , accounting, storing & Preservation of materials,including allother activities incidental to procurement and supply,construction(including excavation of Rock , if any), Fabrication, Erection, Installation, testing, Mechanical Completion, Precommissioning, Commissioning and conducting PGTR, Test Run, for complete cooling tower system(including CWTP) including any balance field engineering as per the provisions of Bidding document . Supply of all labour , amterials, tools& tackles, providing construction aids,and all safety devices for construction.all complete as per the bidding document direction of Engineer In Charge.
Description of Work / Item(s)
FORM-SP-1
PART-A: Lumpsum price for supply portion of CT-01 (7+1 Cells) and CT-II A PNCP Area (2 Cells) for completion of scope of work as per Bidding Document.
PART-B: Lumpsum price for supply portion of CT-02 (8+1 Cells) for completion of scope of work as per Bidding Document.
Description of Work / Item(s)
FORM-SP-2
Lump-Sum Price for Design and Detailed Engineering of Cooling Towers and Cooling Water Treatment Plant for CT-01 (7+1 Cells) FOR PART-A
Lump-Sum Price for Construction/ Installations of Cooling Towers and Cooling Water Treatment Plant for CT-01 (7+1 Cells) FOR PART-A
Lump-Sum Price for Start Up, Precommissioning and Commissioning activities of Cooling Towers and Cooling Water Treatment Plant for CT-01 (7+1 Cells) FOR PART-A
Lump-Sum Price for PGTR and monitoring, running & maintenance of Chemical dosing system and its associated facilities as per scope of work for CT-01 (7+1 Cells) FOR PART-A
Lump-Sum Price for Design and Detailed Engineering of Cooling Towers and Cooling Water Treatment Plant for CT-II A PNCP Area (2 Cells) FOR PART-A
Lump-Sum Price for Construction/ Installations of Cooling Towers and Cooling Water Treatment Plant for CT-II A PNCP Area (2 Cells) FOR PART-A
Lump-Sum Price for Start Up, Precommissioning and Commissioning activities of Cooling Towers and Cooling Water Treatment Plant for CT-II A PNCP Area (2 Cells) FOR PART-A
Lump-Sum Price for PGTR and monitoring, running & maintenance of Chemical dosing system and its associated facilities as per scope of work for CT-II A PNCP Area (2 Cells) FOR PART-A
TOTAL Design and Detailed Engineering (1.01 + 1.05) IN INDIAN CURRENCY FOR PART-A
TOTAL CONSTRUCTION (including Installations, Start Up, Pre-commissioning and Commissioning activities and PGTR and monitoring, running & maintenance of Chemical dosing system and its associated facilities as per scope of work) (1.02 + 1.03 + 1.04 + 1.06 + 1.07+ 1.08) IN INDIAN CURRENCY FOR PART-A
Lump-Sum Price for Design and Detailed Engineering of Cooling Towers and Cooling Water Treatment Plant for CT-02 (8+1 Cells) FOR PART-B
Lump-Sum Price for Construction/ Installations of Cooling Towers and Cooling Water Treatment Plant for CT-02 (8+1 Cells) FOR PART-B
Lump-Sum Price for Start Up, Precommissioning and Commissioning activities of Cooling Towers and Cooling Water Treatment Plant for CT-02 (8+1 Cells) FOR PART-B
Lump-Sum Price for PGTR and monitoring, running & maintenance of Chemical dosing system and its associated facilities as per scope of work for CT-02 (8+1 Cells) FOR PART-B
TOTAL Design and Detailed Engineering (2.01) IN INDIAN CURRENCY FOR PART-B
TOTAL CONSTRUCTION (including Installations, Start Up, Pre-commissioning and Commissioning activities and PGTR and monitoring, running & maintenance of Chemical dosing system and its associated facilities as per scope of work) (2.02+ 2.03+ 2.04) FOR PART-B
Description of Work / Item(s)
GST on supply of Goods (part break up of SP-1)
Basic Customs Duty & other import duties on Supply of Imported Goods other than those mentioned below (Foreign Component of SP-1)
SWS on Duties quoted at S.no. 2.1
IGST / (CGST+SGST) on (Foreign component of SP-1 + (Duties at Sr. 2.1 and 2.2 above)
GST on supply of services (part- breakup of SP-2 calculated based on percentage quoted in SP-5)
Description of Work / Item(s)
Schedule of Lumpsum Price for RECOMMENDED SPARES FOR TWO YEARS OPERATION AND MAINTENANCE of CT-01 (7+1 Cells) and CT-II A PNCP Area (2 Cells) as per Bidding Document for PART-A.
Schedule of Lumpsum Price for RECOMMENDED SPARES FOR TWO YEARS OPERATION AND MAINTENANCE of CT-02 (8+1 Cells) as per Bidding Document for PART-B.
Description of Work / Item(s)
GUARANTEED UTILITIES FOR COOLING TOWER PACKAGE AS PER BIDDING DOCUMENT AND SUBSEQUENT AMENDMENT, IF ANY
GUARANTEED POWER CONSUMPTION FOR COOLING TOWER FANS PER CELL for CT -1(7+1 Cells) and CT-IIA (2 nos cells) and for equipment identified in Loading Criteria Chapter of Tender.
GUARANTEED POWER CONSUMPTION FOR COOLING TOWER FANS PER CELL for CT#2 (8+1 cells) and for equipment identified in Loading Criteria Chapter of Tender.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .