Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 309 403 B12 COMMERCIAL POINT 79 LENIN SARANI TALTALA KOLKATA WEST BENGAL 700013 | KOLKATA | WEST BENGAL | 700013 | Admitted-Finance |
| 4 | Admitted-Finance GARHWA | LATEHAR | JHARKHAND | 822112 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
15 Sept 2023, 6:00 pmClosed
Plant Manager, Dimapur
LPG Bottling Plant Dimapur 7th Mile Model Village Chumukedima PO-Chumukedema, Nagaland-797103
Engineering, Procurement, Construction (EPC) inclusive of 1-Year Comprehensive Operation Maintenance (O and M) of 29.0 KWp On-Grid Roof Mounted Captive Solar Power Project at IndianOil Corporation Limited at LPG Bottling Plant, Dimapur Dist.-Chumuke
2023_NEISO_170740_1
7B06/LPG0/2023-24/SOLAR
Limited
Lump Sum TurnKey
Works
90 days
LPG BP
Please refer tender document
2 documents required · 2 mandatory
Exempted
19 Sept 2023
7 Sept 2023
18 Sept 2023
7 Sept 2023
15 Sept 2023
7 Sept 2023
7 Sept 2023 - 12 Sept 2023
Amount
Part - A1: Supply, Installation, Testing & Commissioning of High Efficient Solar Modules 445/ 450 Wp with 144 half cut Monocrystalline PERC Cells - IEC 61215 Ed2, IEC 61730, IEC 61701, IEC 62804 Ed.1, IEC 62716. Item includes Supply of Plant & Equipment including cable, Micro Inverter, other spares and allied Civil / Electrical Works related to Installation .
Part A1: Supply of Plant and equipment including Mandatory Spares : Supply of SPV module , Power Conditioning Unit(PCU), Cable, Balance of system(other than specified above) &spares as under 1. Drive for PCU as 5% of total population 2. MCCBs/MCB /AC & DC fuses as 5% of total population of each type 3. MC4 Connectors as 5% of total population 4. SPV Modules (0.5% of total population): for 29kWp Solar PV system at LPG Bottling Plant, Dimapur. Installation services, Civil works and Allied Works etc. installation services including design, Engineering, supply , Packing and forwarding , transportation , unloading ,storage , installation ,testing & Commissioning , Civil work and Allied wok etc including clearances from Statutory authorities.
PART-A2: Operation & Maintenance (O&M) of Solar Power Generating System for 1 Year after installation.
PART-B: (1) Operation & Maintenance (O&M) for 1st year after completion of part A i.e for 2nd Year after installation.
PART-B: (2) Operation and Maintenance (O&M) for 2nd year after completion of Part A i.e for 3rd year after Installation
Rudra Energy & Services
NATURETECH INFRASTRUCTURE PVT. LTD
OASYS INFOCOM PVT LTD
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .