Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹12.9 LAccepted-AOC ANANTA OCP JAGANNATH AREA | ANUGUL | ODISHA | 759103 | ₹12.9 L Quoted ₹11.0 L | L-1 | Accepted-AOC L-1 |
Updated dates
Tender Value
₹18.5 L
EMD Value
₹23,100
Closing Date
6 Mar 2026, 5:00 pmClosed
STAFF OFFICER CIVIL MCL LAKHANPUR AREA
GM OFFICE MCL LAKHANPUR AREA
Cleaning of MDTP at Darlipali under I-L-B-L OCP in Lakhanpur Area
2026_MCL_353391_1
MCL/GM/LKPA/SOC/e-Tender /25-26/107 dt18.02.26
Open Tender
Civil Works - Others
180 days
GM OFFICE MCL LAKHANPUR AREA
As per NIT
3 documents required · 3 mandatory
₹23,100
12 Apr 2026
18 Feb 2026
9 Mar 2026
18 Feb 2026
6 Mar 2026
18 Feb 2026
18 Feb 2026 - 23 Feb 2026
WITH ITC AVAILABILITY
Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like.
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas(exceeding 30 cm in depth, 1.5m in width as well as 10 sqmon plan) including getting out and disposalof excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.All kinds of soil
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundationtrenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides andramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplusexcavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position excluding cement concrete of level: specified grade the cost ofcentering and shuttering - All work up to plinth 1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 20mm nominal size derived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses,plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinthlevel up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position andbinding all complete upto plinth level. Thermo echanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form forColumns, Pillars, Piers, Abutments, Posts and Struts
Fencing with R.C.C. post placed at required distance, embedded incement concrete blocks, every 15th post, last but one end post andcorner post hall be strutted on both sides and end post one sideonly, provided withorizontal lines and two diagonals of barbed wireweighing 9.38 kg per 100metres (minimum), between the two postsfitted and fixed with G.I. stapleson wooden plugs or G.I. binding wiretied to 6 mm bar nibs fixed whilecasting the post (cost of R.C.C.posts, struts, earth work and concrete to be paid for separately) :-Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire
White washing with lime to give an even shade: New work (three or more coats)
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.83 MB
Tendernotice_2.pdf
PDF • 2.28 MB
Tendernotice_3.pdf
PDF • 1.32 MB
BOQ_366178.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid