Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | H1₹1.1 LAdmitted-Fee/PreQual/Technical/Finance | H1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | H2₹1.1 L−₹2,542.50 (2.27%)Admitted-Fee/PreQual/Technical/Finance | H2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | H3₹90,852.01−₹21,018 (18.8%)Admitted-Fee/PreQual/Technical/Finance | H3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.1 L
EMD Value
₹2,260
Closing Date
20 Aug 2026, 6:55 pmClosed
Executive Engineer REW Pulwama
Executive Engineer REW Pulwama
RDDDC2627114260 Constt. of culvert near H/O Ab. Majeed Bhat at Bonibagh Murran
2026_RDPR_318248_27
e- NIT No. 71/2026-27 Dated 28-07-2026
Open Tender
Civil Works
Percentage
Pulwama
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Pulwama
₹2,260
21 Aug 2026
28 Jul 2026
21 Aug 2026
28 Jul 2026
20 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing RCC work manually /by mechanical means including stacking of steel bars and disposal of unserviceable materail within 50m lead as per direction of engineer in charge | 2.58 | cum | 2,516.85 | ₹6,493.47 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 | 1.36 | cum | 5,733.6 | ₹7,797.7 |
| 3 | Placing of plum in concrete | 0.34 | cum | 1,300 | ₹442 |
| 4 | Providing and laying in position of reinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. 1:1.5:3 | 3.72 | cum | 7,788.4 | ₹28,972.85 |
| 5 | Steel Reinforcement for RCC Work including straightening, cutting, bending and placing in position complete job | 409.2 | sqm | 123.2 | ₹50,413.44 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 11.15 | sqm | 286.35 | ₹3,192.8 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for slab. | 13.99 | sqm | 718.2 | ₹10,047.62 |
| 8 | carriage of sand/ agg avg lead 12km by MT | 5.08 | cum | 301.6 | ₹1,532.13 |
| 9 | Provision for Photographs and Signboard and other unforseen items. And dewatering and diversion of kull during the execution of work | 1 | Nos | 4,108 | ₹4,108 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.91 MB
BOQ_1047470.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .