| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.0 CrAdmitted-Finance BANK COLONY ROAD PISKA MORE PISKA PANDRA RANCHI | RANCHI | RANCHI | JHARKHAND | L1 | Admitted-Finance | |
| 2 | L2₹16.7 Cr+₹1.8 Cr (11.9%)Admitted-Finance 6 OM COMPLEX BHUJ BHACHAU BYPASS DABDA ROAD ANJAR KUTCH 370110 | ANJAR | KUTCH | GUJARAT | 370110 | L2 | Admitted-Finance | |
| 3 | Rejected-Technical | - | Rejected-Technical Non Responsive | |
| 4 | Rejected-Technical | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | M/s Ganga Construction L1 | VELJI RATNA SORATHIA INFRA PVT. LTD L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation for strucutres Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Ordinary soil
Mechanical Means
Depth upto 3 m | 3,421.49 | Cum | 56.25 ₹1,92,465.66 Lowest | 63 ₹2,15,553.87 |
| 2.00 | Excavation for strucutres Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Ordinary Rock ( not requiring blasting)
Mechanical Means | 2,656.81 | cum | 312.42 ₹8,30,051.21 Lowest | 350 ₹9,29,883.5 |
| 3.00 | Excavation for strucutres Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Hard Rock ( blasting prohibited )
Mechanical Means | 341.32 | Cum | 404.94 ₹1,38,212.76 Lowest | 450 ₹1,53,594 |
| 4.00 | Plain/Reinfoced Cement concrete in open foundation complete as per drawing and technical specifications.PCC Grade M15 PCC Grade M15 using batching plant & Concrete pump | 172.97 | Cum | 4,454.08 ₹7,70,404.47 Lowest | 5,000 ₹8,64,830 |
| 5.00 | Levelling Course for Pile cap Providing and laying of PCC M15 levelling course 100 mm thick below the pile cap.PCC Grade M15 using batching plant & Concrete pump | 41.08 | Cum | 4,320.51 ₹1,77,486.4 Lowest | 4,800 ₹1,97,184 |
| 6.00 | Filling Annular space Around Footing in Rock
PCC-M 15 nominal mix. | 23.03 | Cum | 4,654.29 ₹1,07,188.4 Lowest | 5,100 ₹1,17,453 |
| 7.00 | Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications.RCC Grade M30
RCC Grade M30 using batching plant,transit mixer & Concrete pump | 241.16 | Cum | 5,369.48 ₹12,94,903.51 Lowest | 6,000 ₹14,46,960 |
| 8.00 | Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification
RCC Grade M30
RCC Grade M30 using batching plant & Concrete pump | 696.76 | Cum | 5,288.63 ₹36,84,905 Lowest | 5,900 ₹41,10,884 |
| 9.00 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. | 166.29 | MT | 86,192.79 ₹1,43,32,999.61 Lowest | 96,500 ₹1,60,46,985 |
| 10.00 | Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.Pile diameter-1200 mm | 637.2 | M | 9,207.78 ₹58,67,194.99 Lowest | 10,300 ₹65,63,160 |
Tender Value
₹15.3 Cr
EMD Value
₹15.3 L
Closing Date
11 May 2026, 12:00 pmClosed
Executive Engineer, RCD, Road Division, Simdega
Executive Engineer, RCD, Road division, Simdega
Construction of a High-Level Bridge over the Palmara River at Chainage 3.00 km Span 11 x 24.8 m on the Biru Ramrekha Dham road, under Road Division Simdega.
2026_CECOM_113162_1
RCD/SIMDEGA/01/2026-27
Open Tender
Civil Works
Item Rate
900 days
Palamara Biru
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹15.3 L
30 Sept 2026
27 Apr 2026
13 May 2026
27 Apr 2026
11 May 2026
27 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for strucutres Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Ordinary soil
Mechanical Means
Depth upto 3 m | 3,421.49 | Cum | - | - |
| 2 | Excavation for strucutres Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Ordinary Rock ( not requiring blasting)
Mechanical Means | 2,656.81 | cum | - | - |
| 3 | Excavation for strucutres Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Hard Rock ( blasting prohibited )
Mechanical Means | 341.32 | Cum | - | - |
| 4 | Plain/Reinfoced Cement concrete in open foundation complete as per drawing and technical specifications.PCC Grade M15 PCC Grade M15 using batching plant & Concrete pump | 0.4 | Cum | - | - |
| 5 | Levelling Course for Pile cap Providing and laying of PCC M15 levelling course 100 mm thick below the pile cap.PCC Grade M15 using batching plant & Concrete pump | 41.08 | Cum | - | - |
| 6 | Filling Annular space Around Footing in Rock
PCC-M 15 nominal mix. | 23.03 | Cum | - | - |
| 7 | Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications.RCC Grade M30
RCC Grade M30 using batching plant,transit mixer & Concrete pump | 241.16 | Cum | - | - |
| 8 | Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification
RCC Grade M30
RCC Grade M30 using batching plant & Concrete pump | 696.76 | Cum | - | - |
| 9 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. | 166.29 | MT | - | - |
| 10 | Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.Pile diameter-1200 mm | 637.2 | M | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
SBD.pdf
Tender Documents • 13.51 MB
BOQ_152792.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .