Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC VPO MOHINDIPUR NEAR KALI MATA KI MURTI | ₹1.6 L | L1 | Accepted-AOC wa |
| 2 | L2₹1.7 L+₹3,253 (2.01%)Rejected-AOC VILLAGE CHUNDIPUR 132001 | KARNAL | HARYANA | 132001 | ₹1.7 L+₹3,253 (2.01%) | L2 | Rejected-AOC wna |
Tender Value
₹1.6 L
EMD Value
₹3,240
Closing Date
12 Mar 2026, 3:00 pmClosed
DHARAM VIR
DIV Karnal
K-4 A/mtc of EPHS in various Sector UE Karnal
2026_HBC_506897_1
2026E6DBCDA9 F240 4BC1 904D 197F1533BF90240HSV
Open Tender
Civil Works
Works
30 days
Karnal
2 documents required · 2 mandatory
₹250
₹3,240
Yes
30 Apr 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
12 Mar 2026
7 Mar 2026
[1.PM026] PM026. Tractor with trolley
[11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand)
[6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
[6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete
[6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars
[7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_585651.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .