Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC | L1 | Accepted-AOC 1ST LOWEST | |
| 2 | L2₹4.7 L+₹18,655 (4.15%)Rejected-Finance 3 1 120 ANANDA PALIT ROAD ADJACENT AREA IN WARD NO 55 | KOLKATA | WEST BENGAL | 700001 | L2 | Rejected-Finance FINANCIAL BID IS OPENED | |
| 3 | L3₹4.9 L+₹44,906.85 (9.99%)Rejected-Finance 303 B D H ROAD KOLKATA 700034 | KOLKATA | WEST BENGAL | 700034 | L3 | Rejected-Finance FINANCIAL BID IS OPENED |
Tender Value
₹4.5 L
EMD Value
₹9,000
Closing Date
11 Dec 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXE.ENG-IX
THE KOLKATA MUNICIPAL CORPORATION 11,BELVEDERE ROAD KOLKATA-700027
DEVELOPMENT OF PASSAGE BY PAVERLOCK AT 13/H/48 BRAUNFIELD ROW,KOBIKHET MASJID GALI AND SURROUNDING AREAS IN WARD- 79.(APAS/01/158/149/0004)
2025_KMC_950363_1
KMC/IX/079/2025-2026/APAS
Open Tender
CIVIL WORKS
Percentage
45 days
BR-IX
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹9,000
2 Mar 2026
15 Nov 2025
13 Dec 2025
15 Nov 2025
11 Dec 2025
15 Nov 2025
Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (i) In ordinary soil (Ref :PWD (Rds & Brdgs)-2018 It. No. 3.04 Page No.237)
BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion
Supplying and Laying in the specified pattern of Interlocking Concrete Block Pavements (ICBP) with concrete blocks (with Concrete grade as specified as per Table 1 of IS 15658 : 2006) manufactured from BIS licensee manufacturer, with spacer nib (Small protruding profiles on the vertical face of a paver block used as a device for keeping minimum joint gap in between the paving blocks, as per Cl. No 3.26 of IS: 15658)and of specified size and shape with aspect ratio (The ratio of length to thickness of a paver block, as per CL.No.3.3 of IS: 15658) as per Table 2 of IS :15658 with flexural strength/breaking load as per Annexure G of IS:15658.on the prepared base course of specified CBR as per Table 1 of IRC SP 63 (2018) or else as mentioned in design and drawing with a cushion of compacted bedding sand of 25-35 mm thick (grading of the bedding sand as per clanse 6.5.1 of IRC SP 63) and filling up the gaps in between paver blocks with joint filling sand (the grading of the joint filling sand will he us per clause 6.5.2 of IRC SP 63) and completing the edges with cut blocks as per Cl. No. 8.7 af IRC SP-63(2018) with proper confinement of bedding and joint filling sand, compaction levelling and filling up of the edge gap. 50mm thick (ii) Coloured Decorative (12th Corrigenda & addenda dated14.10.2020)
Raising gully pit cover and frame with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster with neat cement after dismantiling the existing setting and taking out and refixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. ( Ref :Rate based on PWD Current SOR, PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a), p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226, Adda., p-49&50, Date 04.06.2018, p-192 (it -15), p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) PWD(B) 2017 , p-189 (it -1) and 3rd corria. & and 3rd Corr. & Adda, page-52, p-303, p-269 (it -1) and 1st Corria & Adda, Page-4, Date 08.01.2018, page-12 (item -13))
Raising manhole cover and frame with CBW (1:4), 250mm thick up to 100mm high with 20mm thick sand and cement plaster including finishing with neat cement after cutting the asphaltum pavement and taking out and re-fixing the existing manhole cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. ( Ref :Rate based on PWD Current SOR, PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a), p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226, (it -15), p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) PWD(B) 2017 , p-189 (it -1) and 3rd corria. & Adda., p-49&50, Date 04.06.2018, p-192 and 3rd Corr. & Adda, page-52, p-303, p-269 (it -1) and 1st Corria & Adda, Page-4, Date 08.01.2018, page-12 (item -13))
Sub Total
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.46 MB
ROAD.pdf
Additional Documents • 2.42 MB
BOQ_2268413.xls
BOQ • 0.24 MB
TF_79_86.pdf
Tender Documents • 0.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .