| 1.00IMPROVEMENTS TO THE ROAD FROM MRL 03 - PALLAKUPPAM TO POGALUR ROAD VIA THULUKHANKUTTAI.KM 0/000-4/700. | |||||
| 2.00 | Clearing and grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201 In area of thorny jungle | 5,063.47 | sqm | 9.81 ₹49,672.64 Lowest | 9.81 ₹49,672.64 Lowest |
| 3.00 | Scarifying the existing bituminous road surface to depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as pwr technical specification clause 301.4 | 5,860.5 | sqm | 12.7 ₹74,428.35 Lowest | 12.7 ₹74,428.35 Lowest |
| 4.00Excavation in soil using Hydraulic Excavator and Tippers with disposal upto 1000m. Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5m and lead upto 1000m as per Technical Specification Clause 302.3. | |||||
| 5.00 | km 0/000 -1/000 | 42.81 | cum | 45.37 ₹1,942.29 Lowest | 45.37 ₹1,942.29 Lowest |
| 6.00 | km 1/000-2/000 | 46.2 | cum | 45.37 ₹2,096.09 Lowest | 45.37 ₹2,096.09 Lowest |
| 7.00 | km 2/000-3/000 | 49.38 | cum | 45.37 ₹2,240.37 Lowest | 45.37 ₹2,240.37 Lowest |
| 8.00 | km 3/000-4/000 | 46.88 | cum | 45.37 ₹2,126.95 Lowest | 45.37 ₹2,126.95 Lowest |
| 9.00 | km 4/000-4/700 | 33.08 | cum | 45.37 ₹1,500.84 Lowest | 45.37 ₹1,500.84 Lowest |
| 10.00Construction of embankment with approval Materials deposited at site from road way cutting and excavation from drain and foundation of other structures graded and compacted to meat requirement of tables 300.1 and 300.2 asper technical specification clause 301.5 (Filling with cut Earth ) | |||||
Tender Value
Refer Docs
EMD Value
₹6.0 L
Closing Date
15 Feb 2021, 3:00 pmClosed
The Project Director
The Project Director, DRDA, Vellore
Vellore DISTRICT IMPROVEMENTS TO THE ROAD FROM MRL 03 - PALLAKUPPAM TO POGALUR ROAD VIA THULUKHANKUTTAI. in Pernambut block Package no 26-143 PMGSY III BATCH I Retender /2020-21
2021_RDTN_106181_1
TN26-143 Pernambut
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6.0 L
DRDA, Vellore
24 Feb 2021
30 Jan 2021
15 Feb 2021
30 Jan 2021
15 Feb 2021
30 Jan 2021
5 Feb 2021
Amount
IMPROVEMENTS TO THE ROAD FROM MRL 03 - PALLAKUPPAM TO POGALUR ROAD VIA THULUKHANKUTTAI.KM 0/000-4/700.
Clearing and grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201 In area of thorny jungle
Scarifying the existing bituminous road surface to depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as pwr technical specification clause 301.4
Excavation in soil using Hydraulic Excavator and Tippers with disposal upto 1000m. Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5m and lead upto 1000m as per Technical Specification Clause 302.3.
Construction of embankment with approval Materials deposited at site from road way cutting and excavation from drain and foundation of other structures graded and compacted to meat requirement of tables 300.1 and 300.2 asper technical specification clause 301.5 (Filling with cut Earth )
Construction of subgrade and earthen shoulders with approval Materials obtained from borrow pits with all lifts and leads, transporting to site ,spreading ,grading to required slope and compacted to meat requirement of tables and 300.2 with lead upto 1000m as per technical specification clause 303.1 (Using Borrow pit Earth )
Construction of embankment with approval Materials deposited at site from road way cutting and excavation from drain and foundation of other structures graded and compacted to meat requirement of tables 300.1 and 300.2 asper technical specification clause 301.5 (Gravel Shoulder)
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and applying Primer Coat with bitumen emulsion (SS –I) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85kg/ sqm using mechanical means as per Technical Specification Clause 502.
Providing and applying Tack Coat with bitumen emulsion (RS –I) using emulsion distributer at the rate of 0.275 kg per sqm on the prepared granular surface treated with primer& cleaned with Hydraulic broom sas per Technical specification clause 504
Providing and Laying Bituminous Macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 Premixed with bituminous binder, transported to site up to lead o 1000m laid over a previously prepared surface with Paver finisher to the required grade,level and alignment and rolled to achieve the desired compaction as per Technical specification clause 504.
Providing, laying and rolling of Open Graded Premix Carpet of 20mm thickness composed of 13.2mm to 5.6mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a 3 wheel 80-100KN static roller capacity, finished to required level and grades, to be followed by seal coat of Type-A as per Technical Specification Clause 508.
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type-A as per Technical Specification Clause 510.
Providing and applying Primer Coat with cationic bitumen emulsion (water based) modified with Nanotechnology based penetrative Reactive Water-soluble Organosilane material (forming water clear solution) qualifying as per the test, on prepared surface of granular base including cleaning of road surface and spraying prime coat-mix made using 100 part Cationic bitumen emulsion (Grade CSS-1) and 200 parts of Nanotechnology solution (1 kg Terraprime:200 litre water) at the rate of 1.35kg/ sqm using mechanical means as per Technical Specification Clause .
Providing and Laying Bituminous Macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 Premixed with bituminous binder, transported to site up to lead o 1000m laid over a previously prepared surface with Paver finisher to the required grade,level and alignment and rolled to achieve the desired compaction as per Technical specification clause 504.
Providing, laying and rolling of Open Graded Premix Carpet of 20mm thickness using Bituminous (penetration grade / modified bitumen) Binder with Nanotechnology based Organosilane Reactive aggregate modifier material qualifying as per the test at the rate of 1 kg per 1 ton of Binder. Providing, laying and rolling of 13.2mm to 5.6mm aggregates either using penetration grade bitumen or emulsion grade with Nanotechnology based material to required line ,grade and level to serve as wearing course on a previously prepaired base , including mixing in a suitable plant, laying and rolling with a 3 wheel 80-100KN static roller capacity, finished to required level and grades, to be followed by seal coat of Type-A or Type B or Type C as per Technical Specification Clause 508.(ref:Mord pg.no 5-24)
Providing and laying seal coat modified with Nanotechnology based Organosilane Reactive Aggregate modifier material qualifying as per the test at the rate 1 kg per 1 ton of Binder and sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type-A,Type-B and Type-C as per Technical Specification Clause 510.
provision of 15 nos rumble strips covered with premix bituminous carpet ,15 -20 mm high at center ,250 mm wide placed at 1m center to -center at approved location to control, marked with white strips of road marking paint .
providing and fixing name board
providing and fixing logo of PMGSY project
providing and fixing citizen information board of PMGSY project
providing and fixing maintainance information board of PMGSY project
providing and fixing of Retro reflectorised cautionary ,mandatory signs,with defination plate made out of high intensity grade prismatic sheeting conforming to IRC -67:2010 & ASTM D 4956-09 , Types IV specification and fixing over 1.5 mm thick aluminium sheet fixed on back support frame of 25 mm x25mmx3 mm mild steel angle and supported on the mild steel angle iron 75 mm x75 mm x 6mm firmly fixed to the ground by means properly designed foundation with M 15 grade cement concrete 45 cm x45 cm x60 cm below ground level ect complete including 7 years warranty for the retro reflective sheeting as per clause 6.9 of IRC 67-2010 specification ( as per MORT & spec. no 801)
90 cm Equilateral trainagle ( cautionary ) sign board
60 cm circular ( mandatory ) sign board
chevron sign 90 cm
Reflectors
Road marking with hot applied thermoplastic compound with reflectorising glass beard on bituminous surface
Kilometer Stone Reinforced Cement Concrete M15 grade kilometer stone /local stone of standard design as per IRC:8 fixing in position including painting and printing, etc., as per drawing and Technical Specification Clause 1703
(ii) Ordinary Kilometer Stone (Precast)
iii) 200m Stone (pre-cast)(HM stone)
iv ) Guard stone
CONSTRUCTION OF WEARING COAT AT CH.665 -1 No
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
CONSTRUCTION OF REVETMENT AT CH.1000 -100 m
Earth work excavation for foundation of structures up to 3 m depth as per drawing and Technical Specification Clause 1104 including setting out, construction of sharing and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and back filling in trenches with excavated suitable material.
Ch @ Km 1000 - 1100 LHS
Cement concrete 1:2.5:5 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Ch @ Km 1000 - 1100 LHS
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Ch @ Km 1000 - 1100 LHS
Supply and filling foundation basement with filling Gravel in layers not more than 15 cm thick well ramed wated and compacted complete complying with standrad specifications.
Ch @ Km 1000 - 1100 LHS
Providing and laying of pitching of slopes /laying of Apron with cement concrete blocks of size 300mm x300mmx 300mm as per Table 1300.1 cast-in-situ and made with nominal mix of M-15 grade cement concrete as per drawing and technical specifications Clause 1301
Ch @ Km 1000 - 1100 LHS
CONSTRUCTION OF 1.50 M SPAN RCC SLAB CULVERT AT CH.1887 -1 No
Dismantling of existing structures like culverts,bridges,retaining walls and other structure comprising of,masonry,cement concrete,wood work,steel work,including T&P and scaffolding wherever necessary,sorting the dismantled material and stacking the serviceable material with all lift and lead of 1000m as per Technical Specification Clause
Dismantling of existing structures like culverts,bridges,retaining walls and other structure comprising of,brick masonry including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000m as per Technical Specification Clause 202.
Dismantling of existing structures like culverts,bridges,retaining walls and other structure comprising of,masonry,cement concrete,wood work,steel work,including T&P and scaffolding wherever necessary,sorting the dismantled material disposal of un Reinforced Cement Concrete
Earth work excavation for foundation of structures up to 3 m depth as per drawing and Technical Specification Clause 1104 including setting out, construction of sharing and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and back filling in trenches with excavated suitable material.
Supply and filling foundation basement with filling sand in layers not more than 15 cm thick well ramed wated and compacted complete complying with standrad specifications.
Cement concrete 1:2.5:5 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.(20mm Metal)
Cement concrete 1:1.5:3 mix using 20mm HBG metal for all RCC item of works excluding cost of Reinforcement and fabricating charges ,centring and shuttering but including curing and shall be finished smooth with cement mortar 1:3,12mm thiock and with kraft paper without claiming extra as directed by the departmental officers complete complying with standrad specifications.
Supplying and fabricating and placing in position MS Steel or Ribbed Tor steel for all Reinforced cement concrete works as per the design given including cost of steel and Binding wire in all floors etc., complete complying with standard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate).the Binding wire shall supplied by the contractor.
Providing and fixing 20 mm thick compressible fiber board in expansion joint complete as per Drawing and MORD Technical Specification
Providing and fixing THAR paper for baring between bed black and deck slab.
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wint wall, return wall with 100 mm dia AC pipes extending throught the full width of the structues with slope of 1 (V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614,709,1204.3.7
Gravel filling between body wall including cost and conveyance of Gravel,labour for filling,watering and compacting etc., complete complying with standrad specificationsand as directed by the departmental officer.
CONSTRUCTION OF 1.50 M SPAN RCC SLAB CULVERT AT CH.2052 -1 No
Dismantling of existing structures like culverts,bridges,retaining walls and other structure comprising of,masonry,cement concrete,wood work,steel work,including T&P and scaffolding wherever necessary,sorting the dismantled material and stacking the serviceable material with all lift and lead of 1000m as per Technical Specification Clause
Dismantling of existing structures like culverts,bridges,retaining walls and other structure comprising of,brick masonry including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000m as per Technical Specification Clause 202.
Dismantling of existing structures like culverts,bridges,retaining walls and other structure comprising of,masonry,cement concrete,wood work,steel work,including T&P and scaffolding wherever necessary,sorting the dismantled material disposal of un Reinforced Cement Concrete
Earth work excavation for foundation of structures up to 3 m depth as per drawing and Technical Specification Clause 1104 including setting out, construction of sharing and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and back filling in trenches with excavated suitable material.
Supply and filling foundation basement with filling sand in layers not more than 15 cm thick well ramed wated and compacted complete complying with standrad specifications.
Cement concrete 1:2.5:5 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.(20mm Metal)
Cement concrete 1:1.5:3 mix using 20mm HBG metal for all RCC item of works excluding cost of Reinforcement and fabricating charges ,centring and shuttering but including curing and shall be finished smooth with cement mortar 1:3,12mm thiock and with kraft paper without claiming extra as directed by the departmental officers complete complying with standrad specifications.
Supplying and fabricating and placing in position MS Steel or Ribbed Tor steel for all Reinforced cement concrete works as per the design given including cost of steel and Binding wire in all floors etc., complete complying with standard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate).the Binding wire shall supplied by the contractor.
Providing and fixing 20 mm thick compressible fiber board in expansion joint complete as per Drawing and MORD Technical Specification
Providing and fixing THAR paper for baring between bed black and deck slab.
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wint wall, return wall with 100 mm dia AC pipes extending throught the full width of the structues with slope of 1 (V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614,709,1204.3.7
Gravel filling between body wall including cost and conveyance of Gravel,labour for filling,watering and compacting etc., complete complying with standrad specificationsand as directed by the departmental officer.
CONSTRUCTION OF 1.50 M SPAN RCC SLAB CULVERT AT CH.2228 -1 No
Dismantling of existing structures like culverts,bridges,retaining walls and other structure comprising of,masonry,cement concrete,wood work,steel work,including T&P and scaffolding wherever necessary,sorting the dismantled material and stacking the serviceable material with all lift and lead of 1000m as per Technical Specification Clause
Dismantling of existing structures like culverts,bridges,retaining walls and other structure comprising of,brick masonry including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000m as per Technical Specification Clause 202.
Dismantling of existing structures like culverts,bridges,retaining walls and other structure comprising of,masonry,cement concrete,wood work,steel work,including T&P and scaffolding wherever necessary,sorting the dismantled material disposal of un Reinforced Cement Concrete
Earth work excavation for foundation of structures up to 3 m depth as per drawing and Technical Specification Clause 1104 including setting out, construction of sharing and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and back filling in trenches with excavated suitable material.
Supply and filling foundation basement with filling sand in layers not more than 15 cm thick well ramed wated and compacted complete complying with standrad specifications.
Cement concrete 1:2.5:5 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.(20mm Metal)
Cement concrete 1:1.5:3 mix using 20mm HBG metal for all RCC item of works excluding cost of Reinforcement and fabricating charges ,centring and shuttering but including curing and shall be finished smooth with cement mortar 1:3,12mm thiock and with kraft paper without claiming extra as directed by the departmental officers complete complying with standrad specifications.
Supplying and fabricating and placing in position MS Steel or Ribbed Tor steel for all Reinforced cement concrete works as per the design given including cost of steel and Binding wire in all floors etc., complete complying with standard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate).the Binding wire shall supplied by the contractor.
Providing and fixing 20 mm thick compressible fiber board in expansion joint complete as per Drawing and MORD Technical Specification
Providing and fixing THAR paper for baring between bed black and deck slab.
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wint wall, return wall with 100 mm dia AC pipes extending throught the full width of the structues with slope of 1 (V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614,709,1204.3.7
Gravel filling between body wall including cost and conveyance of Gravel,labour for filling,watering and compacting etc., complete complying with standrad specificationsand as directed by the departmental officer.
CONSTRUCTION OF 1.50 M SPAN RCC SLAB CULVERT AT CH.2910 -1 No
Dismantling of existing structures like culverts,bridges,retaining walls and other structure comprising of,masonry,cement concrete,wood work,steel work,including T&P and scaffolding wherever necessary,sorting the dismantled material and stacking the serviceable material with all lift and lead of 1000m as per Technical Specification Clause
Dismantling of existing structures like culverts,bridges,retaining walls and other structure comprising of,brick masonry including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000m as per Technical Specification Clause 202.
Dismantling of existing structures like culverts,bridges,retaining walls and other structure comprising of,masonry,cement concrete,wood work,steel work,including T&P and scaffolding wherever necessary,sorting the dismantled material disposal of un Reinforced Cement Concrete
Earth work excavation for foundation of structures up to 3 m depth as per drawing and Technical Specification Clause 1104 including setting out, construction of sharing and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and back filling in trenches with excavated suitable material.
Supply and filling foundation basement with filling sand in layers not more than 15 cm thick well ramed wated and compacted complete complying with standrad specifications.
Cement concrete 1:2.5:5 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.(20mm Metal)
Cement concrete 1:1.5:3 mix using 20mm HBG metal for all RCC item of works excluding cost of Reinforcement and fabricating charges ,centring and shuttering but including curing and shall be finished smooth with cement mortar 1:3,12mm thiock and with kraft paper without claiming extra as directed by the departmental officers complete complying with standrad specifications.
Supplying and fabricating and placing in position MS Steel or Ribbed Tor steel for all Reinforced cement concrete works as per the design given including cost of steel and Binding wire in all floors etc., complete complying with standard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate).the Binding wire shall supplied by the contractor.
Providing and fixing 20 mm thick compressible fiber board in expansion joint complete as per Drawing and MORD Technical Specification
Providing and fixing THAR paper for baring between bed black and deck slab.
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wint wall, return wall with 100 mm dia AC pipes extending throught the full width of the structues with slope of 1 (V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614,709,1204.3.7
Gravel filling between body wall including cost and conveyance of Gravel,labour for filling,watering and compacting etc., complete complying with standrad specificationsand as directed by the departmental officer.
CONSTRUCTION OF RETAINING WALL AT Ch.710,950,2100 (Left Side)
Earth work excavation for foundation of structures up to 3 m depth as per drawing and Technical Specification Clause 1104 including setting out, construction of sharing and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and back filling in trenches with approved material.
Ch 710-800 LHS
Ch 950-1000 LHS
Ch 2100-2200LHS
Supply and filling foundation basement with filling sand in layers not more than 15 cm thick well ramed wated and compacted complete complying with standrad specifications.
Ch 710-800 LHS
Ch 950-1000 LHS
Ch 2100-2200LHS
Cement concrete 1:2.5:5 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Ch 710-800 LHS
Ch 950-1000 LHS
Ch 2100-2200LHS
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.(Below sill)
Ch 710-800 LHS
Ch 950-1000 LHS
Ch 2100-2200LHS
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.(Above sill)
Ch 710-800 LHS
Ch 950-1000 LHS
Ch 2100-2200LHS
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wint wall, return wall with 100 mm dia AC pipes extending throught the full width of the structues with slope of 1 (V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614,709,1204.3.7
Ch 710-800 LHS
Ch 950-1000 LHS
Ch 2100-2200LHS
Filter media Behind abutment,wing wall and Return wall complete as per Drawing and Technical specification.
Ch 710-800 LHS
Ch 950-1000 LHS
Ch 2100-2200LHS
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K.G.THAYAGARAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .