| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-AOC CHENNAI TAMIL NADU 600100 INDIA | CHENGALPATTU | TAMIL NADU | 600100 | ₹6.6 L | L1 | Accepted-AOC Accept |
| 2 | L2₹7.0 L+₹47,298.48 (7.20%)Rejected-AOC SUBRAMANIAN NAGAR 1ST STREET SUBRAMANIAN NA | TIRUVANNAMALAI | TAMIL NADU | 604407 | ₹7.0 L+₹47,298.48 (7.20%) | L2 | Rejected-AOC Reject |
| 3 | L3₹7.9 L+₹1.3 L (19.8%)Rejected-AOC | ₹7.9 L+₹1.3 L (19.8%) | L3 | Rejected-AOC Reject |
| 4 | L3₹7.9 L+₹1.3 L (19.8%)Rejected-AOC | ₹7.9 L+₹1.3 L (19.8%) | L3 | Rejected-AOC Reject |
| 5 | L3₹7.9 L+₹1.3 L (19.8%)Rejected-AOC TAMIL NADU TAMIL NADU | TIRUNELVELI | TAMIL NADU | 627001 | ₹7.9 L+₹1.3 L (19.8%) | L3 | Rejected-AOC Reject |
Tender Value
Refer Docs
EMD Value
₹8,500
Closing Date
20 Aug 2026, 3:00 pmClosed
Zonal Officer II
New Zonal office building, Kamarajar Salai, Chennai - 600068
PROVIDING SEPTIC TANK AND PLAY AREA SAND FILLING WORK FOR CHENNAI PRIMARY SCHOOL AT PADASALAI STREET IN DIVISION-21, UNIT-5, ZONE-2.
2026_CoC_692213_1
Z.O.II.C.No.E1/748801/2026
Open Tender
Civil Works
Works
90 days
Manali
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹8,500
16 Sept 2026
7 Aug 2026
21 Aug 2026
7 Aug 2026
20 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be
directed except in rock requiring blasting inclusive of shoring shuttering, bailing
out water wherever necessary and depositing the surplus earth within the
compound in places shown by the departmental officers with an initial lead of
100 mts and clearing and levelling including dressing of sides and raming of
bottoms etc., complete complying with standard specification and as directed
by the departmental officers.- Upto 2.40m Footing Depth. (including
Refilling charges) | 28.3 | Cum | 368.55 | ₹10,429.97 |
| 2 | Supplying and filling in foundation, basement, etc with filling crushed stone dust (Quarry dust) in layers of not more than 15 cm thick well watered,
rammed and consolidated etc. complete complying with standard specification
and as directed by the departmental officers. | 1.5 | Cum | 391.95 | ₹587.93 |
| 3 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including
laying, consolidating, finishing, rendering the top surface rough to receive the
floor, curing, etc. complete complying with standard specification and as
directed by the departmental officers. (The rate is inclusive of necessary
planking for panelling wherever necessary and as directed by the departmental
officers - Mixing by mechanical means | 1.5 | Cum | 5,756.01 | ₹8,634.02 |
| 4 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings,
column pedestals, plinth beams, grade beams, staircase steps, Sill slabs
etc. which require only nominal strutting using mild steel sheets of size 90cm x
60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm
x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x
5cm as support runner , vertical stiffener, side support and Top Horizontal
stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals
etc. complete in all floors complying with standard specifcation. (Payment for
centering shall be given after the concrete is laid). FOUNDATION | 3.3 | SQM | 756.34 | ₹2,495.92 |
| 5 | Supplying and erecting steel centering including necessary supports For plane surfaces such as rectangular or square RCC columns etc. which require
only nominal strutting using mild steel sheets made of 10 gauge thick welded
with MS angle size 40mm x 40mm x 5 mm and supported by Steel Adjustable
Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer
steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm
(2.90mm thick).etc..complete in all floors complying with standard specifcation.
Steel Adjustable telescopic props shall be provided as directed by the
departmental Officers. (Payment for centering shall be given after the concrete
is laid). COLUMN | 32.7 | SQM | 669.67 | ₹21,898.21 |
| 6 | Supplying and erecting centering for plane surfaces such as RCC Floor Slab, Roof Slab, Loft, Landing Slabs, etc with necessary supports and strutting
upto 3.60m height in all floors with all cross bracings using MS Sheets made
of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for
boarding laid over steel adjustable span of size 2m x 2m (expandable upto
3.60m) and supported by Steel Adjustable Telescopic Props of Size 2m x 2m
(expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm
thick) and inner steel pipe with dia 40mm (2.90mm thick) , etc complete
complying with standard specifications. Steel adjustable span and Steel
Adjustable telescopic props shall be provided as directed by the departmental
Officers. (Payment for centering shall be given after the concrete is laid). SLAB | 11.6 | SQM | 1,011.91 | ₹11,738.16 |
| 7 | Providing and laying in position, Standardised Concrete Mix M-25 Grade using In-situ Concrete batching plant/ Ready Mix Concrete (RMC) adopting weigh
batch method in accordance with IS:456-2000 using 20mm and down graded
hard broken granite stone jelly for all RCC items of works with minimum cement
content of 350 kg/m3 and maximum water cement ratio of 0.50, including
admixture (plasticiser / superplasticiser) in recommended proportions as per
IS:9103 to accelerate, retard setting of concrete, improve workability without
impairing strength and durability with about (5.0 Cu.m) 7730 kg. of 20mm
machine crushed stone jelly and with about (3.3 Cu.m) 5156 kg. of 10-12mm
machine crushed stone jelly and with about (4.79 cu.m’) 7670 kg. of crushed
stone sand, but excluding cost of reinforcement grill and fabricating charges,
centering and shuttering and also including Conveyance of concrete from
batching plant to Work site, Electricity charges and other works & labour cost
involved for concrete production, laying, vibrating with mechanical vibrators,
finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/
roof slabs wherever necessary without claiming extra, etc., complete complying
with standard specification and as directed by the departmental officers. The
coarse and fine aggregates to be used should comply with the requirements of
IS Standards. (No separate payment will be made by the Department for the
excess usage of materials). | 6.9 | cum | 8,197.92 | ₹56,565.65 |
| 8 | Supplying, fabricating and placing in position Ribbed Tor Steel / TMT
reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500,
Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of
steel reinforcement and G.I. binding wire, wastage etc. complete complying
with standard specification and as directed by the departmental
officers.(Contractor has to make his own arrangements for the supply of steel
reinforcement and binding wire) Upto plinth / Basement level | 517.5 | KG | 96.53 | ₹49,954.28 |
| 9 | Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab,
landing slab etc., with Cement Mortar 1:3 (One Cement and Three Plastering
Sand) 10mm thick including mortar plasticizer at 200ml per 50Kg of cement
used , hacking the surfaces and curing, etc., in all floors complying with
standard specification and as directed by the departmental officers | 10 | SQM | 359.41 | ₹3,594.1 |
| 10 | Dadooing with printed design colour glazed tiles of size 300 x 200 x 6mm | 25.6 | SQM | 1,758.63 | ₹45,020.93 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
748801.pdf
Tender Documents • 1.50 MB
BOQ_832301.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .